Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2007-06-04�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� C�(2007-06-04)�

UIT-T�SG15

Infrastructures des r�seaux optiques et autres r�seaux de transport

P�riode d'�tudes 2005

R�union� du 2007-06-04 au 2007-06-15

Lieu : Suisse [Gen�ve]

Autres r�unions : 2008-12-012008-02-112006-10-302006-02-062005-05-162004-11-29

Resultats:76 documents
R�sultats :� 1 - 2 �-�Suivant Next
Contributions �[�AI/Question:�Q13/15�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 609 ]
Wording for "Reference source selection mechanism" in G.paclock � Semtech Q13/15 2007-05-25
[ 608 ]
Wording for "Frequency accuracy" in G.paclock � Semtech Q13/15 2007-05-25
[ 606 ]
Notion of alignment in time, phase, and frequency � Semtech Q13/15 2007-05-25
[ 605 ]
Min_TDEV Metric � Semtech Q13/15 2007-05-25
[ 603 ]
Verifying Differential Methods of TDM Clock Recovery � Semtech Q13/15 2007-05-25
[ 596 ]
Support of PDH over T-MPLS (PW adaptation) � Alcatel-Lucent Q13/15, Q12/15, Q11/15, Q9/15 2007-05-25
[ 582 ]
Synchronization inputs in G.paclock � Semtech Q13/15 2007-05-25
[ 581 ]
Scope of G.paclock � Semtech Q13/15 2007-05-25
[ 580 ]
Wording for "Scope" in G.paclock � Semtech Q13/15 2007-05-25
[ 579 ]
Proposal to keep SSM transport based upon IEEE802.3ah as an option � Tellabs Oy Q13/15 2007-05-25
[ 578 ]
Addition of "Through Clock" for Synchronous Ethernet � Tellabs Oy Q13/15 2007-05-25
[ 577 ]
Two-Way Protocols Test Cases in Appendix VI/G.8261 � IL-MOC Q13/15 2007-05-27
[ 576 ]
A New Appendix for Background Traffic Models Generation Examples � IL-MOC Q13/15 2007-05-27
[ 575 ]
Modification for Test Case 7 of G.8261 � IL-MOC Q13/15 2007-05-27
[ 571 ]
G.paclock document structure � Zarlink Q13/15 2007-05-25
[ 570 ]
G.paclock - editorial/clarifications � Zarlink Q13/15 2007-05-25
[ 569 ]
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1 � Zarlink Q13/15 2007-05-25
[ 568 ]
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions � Zarlink Q13/15 2007-05-25
[ 567 ]
G.paclock - Figure 14 � Zarlink Q13/15 2007-05-25
[ 566 ]
Synchronous Ethernet - jitter requirements � Zarlink Q13/15 2007-05-25
[ 565 ]
G.paclock - Clause 5.4.3 Jitter � Zarlink Q13/15 2007-05-25
[ 564 ]
G.paclock - Clause 5.5.2 Jitter Tolerance � Zarlink Q13/15 2007-05-25
[ 563 ]
Line timing in Synchronous Ethernet � Zarlink Q13/15 2007-05-25
[ 558 ]
G.8261 Appendix IX Use Cases Transport Requirements � Nortel Networks (Canada) Q13/15 2007-05-25
[ 557 ]
G.8261 Appendix IX clarifications � Nortel Networks (Canada) Q13/15 2007-05-25
[ 517 ]
WITHDRAWN - See C495 � N/A � Q13/15 N/A
[ 506 ]
Explanation of G.pacxyz structure for the scope chapter of the recommendations � Deutsche Telekom Q13/15 2007-05-25
[ 505 ]
Synchronization signal and E-SSM path continuity � Cisco Q13/15 2007-05-25
[ 504 ]
Option for E-OAM supporting E-SSM transmission � Cisco Q13/15 2007-05-25
[ 500 ]
Proposals for EEC Network Limits (Clause 7.2.1 in G.8261) � Ericsson Q13/15 2007-05-24
[ 499 ]
Proposals for EEC Jitter Limits in G.paclock � Ericsson Q13/15 2007-05-24
[ 498 ]
Proposals for Appendix IX in G.8261 � Ericsson Q13/15 2007-05-24
[ 497 ]
Proposals for Test Cases in appendix VI in G.8261 � Ericsson Q13/15 2007-05-24
[ 496 ]
Proposals for clause 8.1 in G.8261 � Ericsson Q13/15 2007-05-24
[ 495 ]
Proposals for models in Appendix V in G.8261 � Ericsson , Cisco Q13/15 2007-05-24
[ 483 ]
Proposed structure for G.pacmod � Nortel Q13/15 2007-05-24
[ 482 ]
Clarification to sections in current draft of G.paclock � Nortel Q13/15 2007-05-24
[ 481 ]
Additional considerations for specification of STM-256 jitter in G.783 and G.825 � Nortel Q13/15 2007-05-24
[ 480 ]
SSM processing time considerations � Nortel Q13/15 2007-05-24
[ 461 ]
Considerations in Sync Ethernet over OTN � Huawei Technologies Co., Ltd Q13/15, Q11/15, Q9/15 2007-05-24
[ 460 ]
Consideration about the time requirement � Huawei Technologies Co., Ltd Q13/15 2007-05-24
[ 450 ]
3GPP contributions addressing the need for a clarification of the synchronization requirement at the input of the base stations (for information) � France Telecom Q13/15 2007-05-24
[ 449 ]
Proposal of transmission of a phase information using OAM messages � France Telecom Q13/15 2007-05-24
[ 448 ]
G.Paclock - Split of the recommendation into two documents. � France Telecom Q13/15 2007-05-24
[ 447 ]
Synchronous Ethernet SSM - list of issues � France Telecom Q13/15 2007-05-24
[ 446 ]
Corrections in G.8261 latest draft � France Telecom Q13/15 2007-05-24
[ 437 ]
G.paclock: proposal for jitter tolerance section 5.5.2 � Alcatel-Lucent Q13/15 2007-05-24
[ 436 ]
Influence of the SSM rate on the reconfiguration time � Alcatel-Lucent Q13/15 2007-05-24
[ 435 ]
Proposal for modification of section 5.1 of G.paclock � Alcatel-Lucent Q13/15 2007-05-24
[ 434 ]
Notion of skewness � Semtech Q13/15 2007-05-25
Resultats:76 documents
R�sultats :� 1 - 2 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-10