Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 292 ]
�
� |
WITHDRAWN - Duplicate with C65
�
WITHDRAWN Duplicate with C65
� |
Mitsubishi
� |
Q9/15
� |
2006-10-20 |
|
[ 291 ]
�
� |
Channel transparency in G.805 and G.ufatn
�
� |
Alcatel
� |
Q12/15
� |
2006-10-20 |
|
[ 290 ]
�
� |
Proposal of multi-granularity photonic cross-connect in G.otf
�
� |
NTT
� |
Q6/15
� |
2006-10-20 |
|
[ 289 ]
�
� |
Functional Classes and Network Modes
�
� |
Tellabs Oy
� |
Q12/15
� |
2006-10-22 |
|
[ 288 ]
�
� |
A Unified Modelling View of OAM Modes
�
� |
Tellabs Oy
� |
Q12/15
� |
2006-10-22 |
|
[ 287 ]
�
� |
Modelling Ethernet VLANs
�
� |
Tellabs Oy
� |
Q12/15
� |
2006-10-20 |
|
[ 286 ]
�
� |
Considerations for Modelling Timing and Synchronization
�
� |
Tellabs Oy
� |
Q13/15, Q12/15
� |
2006-10-20 |
|
[ 285 ]
�
� |
Semantics of Functional Modelling Diagrams
�
� |
Tellabs Oy
� |
Q12/15
� |
2006-10-20 |
|
[ 284 ]
�
� |
T-MPLS Control Plane Requirements
�
� |
Tellabs Oy
� |
Q12/15
� |
2006-10-20 |
|
[ 283 ]
�
� |
10 Gbit/s Interface for Packet Transport Networks
�
� |
Deutsche Telekom
� |
Q11/15
� |
2006-10-20 |
|
[ 282 ]
�
� |
Proposal for a new Recommendation Packet Transport NNIs and their applications
�
� |
Deutsche Telekom
� |
Q11/15
� |
2006-10-20 |
|
[ 281 ]
�
� |
Proposal for a specification of the architecture of Packet Transport Networks
�
� |
Deutsche Telekom
� |
Q12/15
� |
2006-10-20 |
|
[ 280 ]
�
� |
High Speed Interface for Packet Transport Networks
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2006-10-20 |
|
[ 279 ]
�
� |
Proposal of Liaison Statement with 3GPP RAN WG
�
� |
France Telecom
� |
Q13/15
� |
2006-10-20 |
|
[ 278 ]
�
� |
Deterministic Packet Delay Variation (PDV) Test Sequences for TES and CES Performance Evaluation
�
� |
Agere Systems
� |
Q13/15
� |
2006-10-20 |
|
[ 277 ]
�
� |
The usefulness of Deterministic Packet Delay Variation (PDV) in the evaluation of Adaptive Timing Protocols
�
� |
Agere Systems
� |
Q13/15
� |
2006-10-20 |
|
[ 276 ]
�
� |
Definition of Timing Traceability for G.8261
�
� |
Agere Systems
� |
Q13/15
� |
2006-10-20 |
|
[ 275 ]
�
� |
Serial 100 Gigabit Ethernet PHY proposal in 802.3
�
� |
Lucent Technologies Germany
� |
Q11/15, Q6/15, Q3/15
� |
2006-10-20 |
|
[ 274 ]
�
� |
T-MPLS Definition
�
� |
Alcatel
,
Ericsson
� |
Q12/15, Q9/15
� |
2006-10-20 |
|
[ 273 ]
�
� |
Proposed mechanism for T-MPLS TCM using label stacking
�
� |
Alcatel
� |
Q12/15, Q11/15, Q9/15
� |
2006-10-20 |
|
[ 272 ]
�
� |
Proposed text for Draft Amendment 1 to Recommendation G.8110.1
�
� |
Alcatel
,
Huawei Technologies
� |
Q12/15
� |
2006-10-20 |
|
[ 271 ]
�
� |
Transport MPLS Protection Architecture
�
� |
Alcatel
� |
Q12/15, Q9/15
� |
2006-10-20 |
|
[ 270 ]
�
� |
Proposed changes on the working text for accuracy of test parameters in G.992.3
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 269 ]
�
� |
G.vdsl2: Method of Downstream FEXT cancellation
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 268 ]
�
� |
G.vdsl2: Proposal on SRA initiating mechanism
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 267 ]
�
� |
Proposals for draft Recommendation G.8131 (Protection switching for Transport MPLS (T-MPLS) networks)
�
� |
Huawei Technologies
,
Alcatel
,
Tellabs Oy
� |
Q9/15
� |
2006-10-20 |
|
[ 266 ]
�
� |
T-MPLS Control Plane Architecture
�
� |
Alcatel
� |
Q12/15
� |
2006-10-20 |
|
[ 265 ]
�
� |
Proposal for T-MPLS TCM using label stacking
�
� |
Alcatel
� |
Q12/15, Q9/15
� |
2006-10-20 |
|
[ 264 ]
�
� |
G.ADSL2, G.ADSL2+, G.VDSL2: Requirements for retransmission technique
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 263 ]
�
� |
G.hn: On the home network topology
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 262 ]
�
� |
G.VDSL2: Correction to the formula for computing received virtual noise from TXREFVN parameter
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 261 ]
�
� |
Proposal of a generic Home Network architecture on the transport stratum
�
� |
NTT
� |
Q1/15
� |
2006-10-20 |
|
[ 260 ]
�
� |
Channel/senders/receivers complex model
�
� |
Alcatel
� |
Q12/15
� |
2006-10-20 |
|
[ 259 ]
�
� |
Unifying G.805 and G.809
�
� |
Lucent Technologies UK
,
KPN
� |
Q12/15
� |
2006-10-20 |
|
[ 258 ]
�
� |
Discussion on macrobending loss specification for G.mmx
�
� |
Draka Comteq
� |
Q5/15, Q10/15
� |
2006-10-20 |
|
[ 257 ]
�
� |
G.vdsl: VDSL2 Impulse Noise Monitor Performance/Accuracy Requirements
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 256 ]
�
� |
G.gen: G.vdsl: G.ploam: Full Proposed Text for VDSL2 Impulse Noise Monitor
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 255 ]
�
� |
G.vdsl: VDSL2 Initialization Success/Failure Code DRAFT
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 254 ]
�
� |
G.gen: G.vdsl: G.ploam: VDSL2 Reporting of Actual Impulse Noise Protection
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 253 ]
�
� |
Clock bandwidth considerations for G.paclock
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 252 ]
�
� |
Text changes for Appendix VIII of Recommendation G.8261
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 251 ]
�
� |
Appendix VI/Test Case 8: Can G.8261 masks be met
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 250 ]
�
� |
Clarifications and text changes for Appendix VI of G.8621
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 249 ]
�
� |
WDM interface with a total capacity of 100 Gbit/s
�
� |
Deutsche Telekom
� |
Q6/15
� |
2006-10-20 |
|
[ 248 ]
�
� |
Synchronisation Modelling Components - Time
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 247 ]
�
� |
Synchronous Ethernet Equipment Clock - Selection Function
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 246 ]
�
� |
Synchronisation Modelling - Frequency and Time Converging
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 245 ]
�
� |
Synchronous Ethernet - Synchronisation Status Message (SSM) Delay Analysis
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 244 ]
�
� |
Ethernet Ring Protection
�
� |
Siemens
� |
Q9/15
� |
2006-10-20 |
|
[ 243 ]
�
� |
Proposal to continue work on 10GbE bit rates
�
� |
Cisco Systems
� |
Q14/15, Q12/15, Q11/15
� |
2006-10-20 |
Resultats:263 documents R�sultats :�
1 -
2 -
3 -
4 -
5 -
6
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):