Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG13 : R�union�2008-09-12�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG13� TD-WP1�(2008-09-12)�

UIT-T�SG13

Gestion et coordination de projets; Architecture et principes de l?int�gration des r�seaux; R�seaux et m�canismes multiprotocoles; Qualit� de fonctionnement des r�seaux et gestion des ressources

P�riode d'�tudes 2005

R�union� du 2008-09-12 au 2008-09-12

Lieu : Suisse [Gen�ve]

Autres r�unions : 2009-09-01� 2009-01-12� [ 2008-09-12 ]� 2008-05-222008-01-142007-09-212007-04-162006-11-032006-07-172006-01-162005-08-292005-04-252004-12-07

Resultats:13 documents
Documents Temporaires �(WP1) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 173-WP1 ]
(Rev.1)
Q.1/13 meeting report (NGN-GSI event, Geneva, 1-11 September 2008) � Q.1/13 Rapporteur Q1/13 2008-09-11
[ 172-WP1 ]
Q.1/13 Living List (NGN-GSI event, Geneva, 1-11 September 2008) � Q.1/13 Rapporteur Q1/13 2008-09-10
[ 171-WP1 ]
Draft Recommendation Y.NGN-Cap2, Description of NGN capability set 2 (NGN-GSI event, Geneva, 1-11 September 2008) � Editors of Y.NGN-Cap2 Q1/13 2008-09-10
[ 170-WP1 ]
Output NGN-roadmap document (NGN-GSI event, Geneva, 1-11 September 2008) � Editors of NGN-roadmap Q1/13 2008-09-10
[ 169-WP1 ]
Q.11/13 meeting report (NGN-GSI event, Geneva, 1-11 September 2008) � Acting Rapporteur Q.11/13 Q11/13 2008-09-09
[ 168-WP1 ]
Draft Recommendation Y.iSCP-scen, Scenarios for independent scalable control plane in FPBN (Geneva, NGN-GSI, 1-11 September 2008) � Editors Q13/13 2008-09-09
[ 167-WP1 ]
Draft Recommendation Y.PTDN, The general technical architecture for PTDN (Geneva, NGN-GSI, 1-11 September 2008) � Editors, Q.13/13 Q13/13 2008-09-09
[ 166-WP1 ]
Q.13/13 (Public data network) meeting report (Geneva, NGN-GSI, 1-11 September 2008) � Rapporteurs, Q.13/13 Q13/13 2008-09-09
[ 165-WP1 ]
Output NGN-roadmap document (NGN-GSI, 1-11 September 2008) � Editor of NGN-roadmap Q1/13 2008-09-03
[ 164-WP1 ]
Draft Supplement on NGN release 2 scope (Q.1/13 e-meeting, 7-11 July 2008) � Editors Q1/13 2008-07-14
[ 163-WP1 ]
Report of Q.1/13 interim electronic meeting in July 2008 � Rapporteur Q1/13 2008-07-14
[ 162-WP1 ]
Reply to the liaison on revised Recommendation Y.2091 � ITU-T SG 4 Q11/13, Q1/4 2008-06-20
[ 151-WP1 ]
Reply to the Liaison Statement entitled "Revised Recommendation Y.2091 "Terms, definitions and high level terminological framework for Next Generation Networks" � ITU-T SG 15 Q11/13 2008-03-04
Resultats:13 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-10