Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG11 : R�union�2008-01-16�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG11� C�(2008-01-16)�

UIT-T�SG11

Sp�cifications et protocoles de signalisation

P�riode d'�tudes 2005

R�union� du 2008-01-16 au 2008-01-23

Lieu : Cor�e (R�p. de) [S�oul]

Autres r�unions : 2009-01-19� 2008-09-122008-09-052007-09-212007-04-232006-11-032006-07-242006-01-232005-09-052005-05-022004-12-06

Resultats:16 documents
Contributions �[�AI/Question:�5/11�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 119 ]
Proposed updates to TRQ.rsf � MII, People?s Republic of China, Huawei Technologies Co., Ltd. 5/11 2008-01-08
[ 118 ]
Proposed texts to Rt interface � MII, People's Republic of China 5/11 2008-01-08
[ 117 ]
Proposed texts on clause 9.3 of Rs interface � MII, People's Republic of China 5/11 2008-01-08
[ 110 ]
Draft of Q.3306.1 (Q.rcp6) update � Telekomunikacja Polska (Poland) 5/11 2008-01-08
[ 106 ]
Call to develop a Signalling Recommendation supporting Flow State Aware Resource Control � Anagran Inc. 5/11 2008-01-07
[ 105 ]
Considerations regarding security requirements associated with draft Recommendation Q.3304.1 � Nortel Networks (Canada) 5/11 2008-01-07
[ 104 ]
Consideration of the configuration and scope of Rh reference point � ETRI 5/11 2008-01-07
[ 103 ]
Additional text to Q.3308 (Rh reference point) � ETRI 5/11 2008-01-07
[ 102 ]
The consideration of the baseline protocol for the Rh reference point � ETRI 5/11 2008-01-07
[ 101 ]
Proposed texts to Rh interface � China Telecom, Huawei Technologies Co., Ltd. 5/11, 4/13 2008-01-07
[ 99 ]
Proposed updates to Ri interface � China Telecom, Huawei Technologies 5/11 2008-01-07
[ 98 ]
Proposed work item on use of pre-congestion notification (PCN) for resource control � Huawei Technologies, BT 5/11 2008-01-07
[ 97 ]
Proposal of creating a draft Rec. for Admission Control Coordination � British Telecom, Huawei Technologies Co., Ltd. 5/11 2008-01-07
[ 87 ]
Proposed Text for Sections 8 and 9 of Draft TRQ.ETS � Telcordia Technologies 3/11, 4/11, 5/11 2008-01-07
[ 86 ]
Proposed Modifications to Draft TRQ.ETS � Telcordia Technologies 3/11, 4/11, 5/11 2008-01-07
[ 85 ]
H.248 Rw Profile Version 2 - Update proposal for Draft Q.3323.2 due to alignment with H.248 Ia Profile Version 2 � Alcatel - Lucent 5/11 2007-12-19
Resultats:16 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-27