Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG11 : R�union�2004-03-01�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG11� TD�(2004-03-01)�

UIT-T�SG11

Sp�cifications et protocoles de signalisation

P�riode d'�tudes 2001

R�union� du 2004-03-01 au 2004-03-12

Lieu : Suisse [Gen�ve]

Autres r�unions : [ 2004-03-01 ]� 2003-09-012002-11-11� 2002-02-18� 2001-07-02� 2001-05-14� 2001-03-21� 2000-11-27�

Documents Temporaires �(GEN) �[�AI/Question:�Q7/11�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 73-GEN ]
Discussions of WP 2/11 plenary session � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-09
[ 51-GEN ]
(Rev.1)
Q7/11 Meeting Minutes � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2004-03-04
[ 50-GEN ]
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol � Temporary Editor (R. Jesske) Q12/11, Q16/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11 2004-03-04
[ 49-GEN ]
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol � Temporary Editor (R. Jesske) Q16/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11 2004-03-04
[ 23-GEN ]
Liaison Statement on NGN studies � SG13 (GVA 3-12 February 2004) QALL/13, Q9/11, Q8/11, Q7/11, QN3/11, QN2/11, QN1/11 2004-02-17
Documents affich�s : 5 sur un total de 7� relatifs � cette r�union (en voir plus...)

Documents Temporaires �(PLEN) �[�AI/Question:�Q7/11�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 30-PLEN ]
WP2/11 Document Roadmap for SG 11 Plenary � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-10
[ 29-PLEN ]
(Rev.1-2)
WP2/11 PART I Report � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-10
[ 16-PLEN ]
+Corr.1
Draft TRQ 2840: Supplement 49, Signalling Requirements to Support IP Telephony � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2004-03-05
[ 8-PLEN ]
Roadmap for documents associated with discussions of Questions assigned to WP2/11 � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-02-29

Documents Temporaires �(WP2) �[�AI/Question:�Q7/11�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 21-WP2 ]
(Rev.1)
Draft Signalling Requirements to support IP telephony (INPUT) � Rapporteur (K. Kenyoshi) Q7/11 2004-03-01
[ 20-WP2 ]
Proposed Agenda of Q.7/11 (SWP2-2) � Rapporteur (K. Kenyoshi) Q7/11 2004-03-01
[ 14-WP2 ]
(Rev.1)
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS � Editor pro tem (G. Ratta) Q9/11, Q8/11, Q7/11 2004-02-23
[ 13-WP2 ]
(Rev.1)
WP 2/11 Work Programme � WP2/11 Vice-Chairman (D. Knight) Q9/11, Q8/11, Q7/11, Q6/11 2004-02-21
[ 6-WP2 ]
Liaison Reply to ITU-T SG 11 on Signalling Requirements to support IP Telephony � SG 9 (Honolulu, 15-21 January 2004) Q13/9, Q12/9, Q10/9, Q7/11 2004-02-04
Documents affich�s : 5 sur un total de 7� relatifs � cette r�union (en voir plus...)

T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-2-4