Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG11 : R�union�2003-09-01�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG11� TD-WP2�(2003-09-01)�

UIT-T�SG11

Sp�cifications et protocoles de signalisation

P�riode d'�tudes 2001

R�union� du 2003-09-01 au 2003-09-12

Lieu : Suisse [Gen�ve]

Autres r�unions : 2004-03-01� [ 2003-09-01 ]� 2002-11-11� 2002-02-18� 2001-07-02� 2001-05-14� 2001-03-21� 2000-11-27�

Resultats:33 documents
Documents Temporaires �(WP2) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 33-WP2 ]
Draft Liaison generated in SWP 2-4/11 discussions � WP2/11 Chairman Q7/11, Q8/11, Q9/11 2003-09-10
[ 32-WP2 ]
(Rev.1)
LS - Draft Signalling Requirements to support IP telephony � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2003-09-09
[ 31-WP2 ]
Proposed Liaison Response to ITU-T SG2 (Q.6/2) on E.412 � WP2/11 Vice Chairman (D. Knight) Q9/11 2003-09-08
[ 30-WP2 ]
(Rev.1)
Technical Report TRQ.2000: Roadmap for the TRQ.2xxx-series technical reports � WP2/11 Vice Chairman (D. Knight) Q6/11, Q7/11, Q8/11, Q9/11 2003-09-08
[ 29-WP2 ]
Draft TRQ.2800 (editing output) � Editor (B. Pfeil) Q9/11 2003-09-08
[ 28-WP2 ]
Draft TRQ.NCAPX � Editor Q9/11 2003-09-08
[ 27-WP2 ]
Draft TRQ.2415 � Editor (L. Graf) Q9/11 2003-09-04
[ 26-WP2 ]
Draft TRQ.2402 � Editor (L. Graf) Q9/11 2003-09-04
[ 25-WP2 ]
Agenda of joint Qs 7, 8 & 9/11 (IP QoS) meeting (SWP 2-4) � Q7/11 Rapporteur (K. Kenyoshi) Q7/11, Q8/11, Q9/11 2003-09-02
[ 24-WP2 ]
Agenda of Q.7/11 (SWP2-2) � Rapporteur (K. Kenyoshi) Q7/11 2003-09-02
[ 23-WP2 ]
(Rev.1)
Q9/11 meeting agenda, document allocation and schedule � Rapporteur (L. Graf) Q9/11 2003-09-01
[ 22-WP2 ]
Draft Signalling Requirements to support IP telephony (INPUT) � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2003-09-01
[ 21-WP2 ]
WP 2/11 Work Programme (Input) � WP2/11 Vice-Chairman (D. Knight) Q6/11, Q7/11, Q8/11, Q9/11 2003-08-29
[ 20-WP2 ]
(Rev.1-2)
Agenda of Q.6/11 and joint Q.6/11 and Q.9/11 meeting � Q6/11 Rapporteur (K. Mainwaring) Q6/11, Q9/11 2003-08-29
[ 19-WP2 ]
(Rev.1-2)
Technical Report TRQ.NSIP Signalling Requirements for carrying narrowband service signalling information within IP-Based Signalling Systems to support interworking of services � Editor (T. Fu) Q6/11, Q9/11 2003-08-27
[ 18-WP2 ]
Draft TRQ.IPC.CS1 � Editor (L. Graf) Q9/11 2003-08-21
[ 17-WP2 ]
Draft TRQ.AAL2.CS3 � Editor (L. Graf) Q9/11 2003-08-21
[ 16-WP2 ]
Draft TRQ.AAL2IP.iw (Editor's input) � Editor (B. Pfeil) Q9/11 2003-08-18
[ 15-WP2 ]
Liaison Statement from ETSI/TIPHON � SG11 Chairman on behalf of ETSI/TIPHON Q7/11 2003-08-12
[ 14-WP2 ]
Liaison Statement - Reply to SG11 for comments and questions on Y.qosar � SG13 (GVA. 21 July - 1 Aug. 2003) Q16/13, Q8/11, Q9/11 2003-08-08
[ 13-WP2 ]
Liaison Statement - Information on the Scope of Y.1541 � SG13 (GVA. 21 July - 1 Aug. 2003) Q6/13, Q8/11, Q9/11 2003-08-08
[ 12-WP2 ]
(Rev.1)
BICC CS3 Overall Requirements (Editors Input) � Editor TRQ.BICC.CS3 (D. Knight) Q9/11 2003-08-11
[ 11-WP2 ]
TRQ.IPBCP.CS2: Requirements for Capability Set 2 of the IP Bearer Control Protocol (Editors Input) � Editor TRQ.IPBCP.CS2 (D. Knight) Q9/11 2003-08-11
[ 10-WP2 ]
Discussion Summary of QoS Matters in April 10, 2003 meeting � WP2/11 Chairmperson (G. Ratta) Q7/11, Q8/11, Q9/11 2003-08-07
[ 9-WP2 ]
(Rev.1-2)
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QOS � Editor pro tem Q7/11, Q8/11, Q9/11 2003-08-07
[ 8-WP2 ]
Signalling Requirements for IP-QOS � WP2/11 Chairman (G. Ratta) Q7/11, Q8/11, Q9/11 2003-08-07
[ 7-WP2 ]
Discussion Summary of Joint Qs 6 & 9/11, Meeting on Arpil 7, 2003 � WP2/11 Chairman (G. Ratta) Q6/11, Q9/11 2003-08-07
[ 6-WP2 ]
Liaison Statement - Response to Progress of the discussion on generic end-to-end QoS service requirements � SG16 Rapprt. mtg. (11-14 Feb. 2003) Q8/11, Q9/11, QF/16 2003-03-03
[ 5-WP2 ]
Liaison Statement - Response on Signalling Requirements for IP-QOS � SG16 Rapprt. mtg (11-14 Feb. 2003) Q8/11, Q9/11, QF/16 2003-03-03
[ 4-WP2 ]
Liaison Statement from ETSI/TIPHON on requirements on IP Telephony � SG11 Chairman on behalf of ETSI Q6/11, Q7/11 2003-06-11
[ 3-WP2 ]
Liaison Statement - Optical Transport Netwroks & Technologies Standardization Work Plan, Issue 3 � SG15 (GVA. 20-31 January 2003) Q9/11, QALL/15 2003-02-04
[ 2-WP2 ]
(Rev.1)
List of WP2/11 Series Tempoary Documents �
Rev. 1 - updated list 05.09.03
TSB QALL/11 2003-09-01
[ 1-WP2 ]
Agenda - WP2/11 Plenary Sessions � WP2/11 Chairperson (G. Ratta) Q6/11, Q7/11, Q8/11, Q9/11 2003-08-29
Resultats:33 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-2-4