Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : R23-SG01 : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�R23-SG01� C�

UIT-R�R23-SG01

Gestion du Spectre

Resultats:34 documents
Contributions��Documents / Contributions

Num�ro
Titre Source Date
[ 34 ]
Executive Report to Study Group 1 (Working Party 1B meeting in Geneva, Switzerland, 5-8 November 2024) � Chair, WP 1B 2024-11-21
[ 33 ]
Liaison statement to CISPR/H (copy for information to ITU-R Study Group 1 and Working Parties 1A, 5A and 7A) - Update to broadcasting services protection requirements in the CISPR radio services database � WP 6A 2024-11-18
[ 32 ]
(Rev.1)
Draft revision of Report ITU-R SM.2015-2 - Methods for determining national long-term strategies for spectrum utilization � WP 1B 2024-11-18
[ 31 ]
Reply liaison statement to ITU-T Study Group 3 (copy to ITU-R Study Group 1 and RAG) - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators � SG 4 2024-11-08
[ 30 ]
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators � ITU-T SG3 2024-07-19
[ 29 ]
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan � ITU-T SG15 2024-07-19
[ 28 ]
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan � ITU-T SG15 2024-07-19
[ 27 ]
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 20 June 2024) � Chair, SG 1 2024-06-21
[ 26 ]
Final list of participants - Study Group 1 (Geneva, 20 June 2024) � Director, BR 2024-06-21
[ 25 ]
Executive Report of June 2024 meeting of Working Party 1C (12-19 June 2024) � Acting Chair, WP 1C 2024-06-19
[ 24 ]
Executive Report of June 2024 meeting of Working Party 1B (12-19 June 2024) � Acting Chair, WP 1B 2024-06-19
[ 23 ]
Executive Report of June 2024 meeting of Working Party 1A (12-19 June 2024) � Acting Chair, WP 1A 2024-06-19
[ 22 ]
(Rev.1)
Draft revision of Report ITU-R SM.2449-0 - Impact analyses of non-beam inductive wireless power transmission for mobile and portable devices on radiocommunication services � WP 1A 2024-06-19
[ 21 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.2129-0 - Guidance on frequency ranges for operation of non-beam wireless power transmission systems for mobile and portable devices � WP 1A 2024-06-19
[ 20 ]
(Rev.1)
Draft new Report ITU-R SM.[AI AND BIG DATA] - Next generation Spectrum Monitoring - Proactive, Autonomous, and Data-Driven � WP 1C 2024-06-19
[ 19 ]
(Rev.1)
Draft revision of Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks � WP 1C 2024-06-19
[ 18 ]
(Rev.1)
Draft editorial revision of Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands � WP 1B 2024-06-18
[ 17 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.329-12 - Unwanted emissions in the spurious domain � WP 1A 2024-06-18
[ 16 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1541-6 - Unwanted emissions in the out-of-band domain � WP 1A 2024-06-18
[ 15 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1539-1 - Variation of the boundary between the out-of-band and spurious domains required for the application of Recommendations ITU-R SM.1541 and ITU R SM.329 � WP 1A 2024-06-18
[ 14 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.853-1 - Necessary bandwidth � WP 1A 2024-06-18
[ 13 ]
Proposed organization of the work of the Study Group 1 during 2023-2027 Study cycle � Chair, SG 1 2024-06-12
[ 12 ]
Report on CISPR activities from June 2023 to June 2024 � Rapporteur, SG 1 RG on Liaison with CISPR , Rapporteur to CISPR on WPT issues 2024-06-10
[ 11 ]
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 � SG 4 2024-05-13
[ 10 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chair, CCV 2024-04-22
[ 9 ]
Liaison statement on terms contained in ITU-T Study Group 5 draft recommendations � SCV/CCT 2024-02-19
[ 8 ]
(Rev.1)
Summary of the main results of RA-23 and CPM27-1 related to Study Group 1 � Chair, SG 1 2024-02-05
[ 7 ]
(Rev.1)
List of proposed Vice-Chairs of the Radiocommunication Study Groups and the CCV � Director, BR 2024-01-26
[ 6 ]
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz � Chairs, SGs 1, 5 & 7 2024-01-22
[ 5 ]
Liaison statement on the activities and studies on sustainable digital transformation � ITU-T SG5 2023-12-21
[ 4 ]
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan � ITU-T SG15 2023-12-21
[ 3 ]
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan � ITU-T SG15 2023-12-21
[ 2 ]
Documents to be carried over from the 2019-2023 study period � SG 1 2023-11-22
[ 1 ]
(Rev.1)
Assignment of texts to the Study Group 1 Sub-Groups � Chair, SG 1 2023-11-22
Resultats:34 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2024-12-18