Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP-7C : Contributions : 283 Ajout�s r�cemment�-� Recherche de documents de r�union
[283]� Report of the meeting of Working Party 7C (16-23 September 2021, e-Meeting)

Format

Taille

Mise � disposition

English

Word

33138 octets 2021-09-29 [283]�Annex 31- Final list of participants

Word

50189 octets 2021-09-29 [283]�Annex 30- List of input documents (Documents 7C/186 - 7C/281)

Word

50184 octets 2021-09-28 [283]�Annex 29- Review of Recommendations, Reports and Opinions under the purview of Working Party 7C

Word

35233 octets 2021-09-28 [283]�Annex 28- Working document towards a preliminary draft revision of Recommendation ITU-R RS.2066-0 - Protection of the radio astronomy service in the frequency band 10.6-10.7 GHz from unwanted emissions of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz

Word

138476 octets 2021-09-28 [283]�Annex 27- Working document towards a preliminary draft revision of Recommendation ITU-R RS.1813-1 - Reference antenna pattern for passive sensors operating in the Earth exploration-satellite service (passive) to be used in compatibility analyses in the frequency range 1.4-100 GHz

Word

33283 octets 2021-09-28 [283]�Annex 26- Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 1A, 1C, 5A, 5C, and 7D for information) - Propagation information under Resolution 731 (Rev.WRC-19)

Word

32499 octets 2021-09-28 [283]�Annex 25- Work plan - Working Party 7C activities on the protection of EESS (passive) above 71 GHz

Word

35463 octets 2021-09-28 [283]�Annex 24- Elements for sharing and compatibility studies related to the protection of EESS (passive) above 71 GHz

Word

373215 octets 2021-09-28 [283]�Annex 23- Working document towards a preliminary draft new report on studies related to agenda item 9.1, topic d) - Protection of EESS (passive) in the frequency band 36-37 GHz from non-GSO FSS space stations

Word

32898 octets 2021-09-28 [283]�Annex 22- Work plan for working document towards a preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors [in the 18.6-18.8 GHz band] [caused by surface water reflections]

Word

3127760 octets 2021-09-28 [283]�Annex 21- Working document towards a preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors [in the 18.6 18.8 GHz band] [caused by surface water reflections]

Word

33731 octets 2021-09-28 [283]�Annex 20- Terms of Reference for Working Party 7C Correspondence Group on WRC-23 agenda item 1.14

Word

34553 octets 2021-09-28 [283]�Annex 19- Working document towards preliminary draft CPM Text - WRC-23 agenda item 1.14

Word

1153834 octets 2021-09-28 [283]�Annex 18- Working document towards preliminary draft new Report ITU-R RS.[231.5-252 GHz EESS] - WRC-23 agenda item 1.14 - Studies related to possible EESS (passive) allocations in the frequency range 231.5-252 GHz

Word

943181 octets 2021-09-28 [283]�Annex 17- Working document towards a preliminary draft new Report ITU-R RS.[EESS(PASSIVE)6-7 GHz] - EESS (passive) in the 6 425-7 250 MHz range

Word

43231 octets 2021-09-28 [283]�Annex 16- Cross reference between sensor names and short numbering for Recommendation ITU-R RS.1861

Word

113989 octets 2021-09-27 [283]�Annex 15- Working document toward a preliminary draft new Report ITU-R RS.[GROUND SENSOR] - Technical and operational characteristics of ground sensor operating in 22 to 30 GHz and 51 to 59 GHz frequency range

Word

34264 octets 2021-09-28 [283]�Annex 14- Working document towards preliminary draft new ITU-R Report - [Typical technical and operational characteristics of spaceborne active sensors in the band 3 000-3 400 MHz]

Word

34627 octets 2021-09-27 [283]�Annex 13- Terms of Reference for Working Party 7C Correspondence Group on WRC-23 agenda item 9.1, topic a)

Word

36695 octets 2021-09-28 [283]�Annex 12- Draft CPM text on WRC-23 agenda item 9.1, topic a)

Word

50431 octets 2021-09-27 [283]�Annex 11- Elements regarding WRC-23 agenda item 9.1, topic a)

Word

5795815 octets 2021-09-27 [283]�Annex 10- Preliminary draft revision of Report ITU-R RS.2456-0 - Space weather sensor systems using radio spectrum

Word

44730 octets 2021-09-27 [283]�Annex 9- Working document towards a preliminary draft new Report ITU-R RS.[SPEC_REQTS_TX_SPACE_WEATHER] - Spectrum requirements and applicable radio service designations for active space weather sensors that provide data critical for predictions and warnings

Word

72827 octets 2021-09-28 [283]�Annex 8- Views on working document towards a preliminary draft new Report ITU-R RS.[SPEC_USE_RX_SPACE _WEATHER] - Spectrum use and applicable radio service designations for receive only space weather sensors that provide data used for predictions and warnings

Word

129457 octets 2021-09-27 [283]�Annex 7- Working document towards a preliminary draft new Report ITU-R RS. RS.[RXSW_INTERF_CRITERIA] - Interference criteria of receive-only space weather sensors

Word

36916 octets 2021-09-27 [283]�Annex 6- Draft CPM text for WRC-23 agenda item 1.12

Word

1195617 octets 2021-09-27 [283]�Annex 5- Working document towards preliminary draft revised Recommendation ITU-R RS.2042-1 - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band

Word

11178814 octets 2021-09-27 [283]�Annex 4- Preliminary draft revision of Report ITU-R RS.2455-1 - Results of sharing studies between a 45 MHz radar sounder and in-band and selected out-of-band incumbent services over the 40-50 MHz frequency range

Word

205723 octets 2021-09-27 [283]�Annex 3- Preliminary draft new Report ITU-R RS.[EESS_SAR-RNSS] - Representative system characteristics and examples of evaluating interference into receiving earth stations in the radionavigation-satellite service (space-to-Earth) from spaceborne synthetic aperture radar sensors in the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band

Word

37581 octets 2021-09-27 [283]�Annex 2- Preliminary draft new Recommendation ITU-R RS.[EESS_SAR-RNSS] - Evaluation of the potential for pulsed interference from planned and future spaceborne synthetic aperture radar sensors in the Earth exploration-satellite (active) service to radionavigation-satellite service receivers in the 1 215-1 300 MHz band

Word

31169 octets 2021-09-27 [283]�Annex 1- Preliminary draft revision of Recommendation ITU-R RS.1166-4 - Performance and interference criteria for active spaceborne sensors

Word

127633 octets 2021-10-25 [283]�- Report on the meeting of Working Party 7C (16-23 September 2021, e-Meeting)

Document :

UIT-R�WP-7C� Contribution� 283

Titre :

Report of the meeting of Working Party 7C (16-23 September 2021, e-Meeting)

Re�u le :

2021-09-23

Source :

Chairman, WP 7C

Disponibilit� :

R�serv� aux utilisateurs TIES�[UIT-R]

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2022-04-07