Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP5D : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP5D� C�

UIT-R�WP5D

Syst�mes IMT

Resultats:110 documents
R�sultats :� 1 - 2 - 3 �-�Suivant Next
Contributions �[�Source:�Japan�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 1721 ]
Proposal on IMT-2030/001 (IMT-2030 Background) � China (People's Republic of) , Japan , Korea (Republic of) 2023-06-02
[ 1713 ]
Proposal for draft summary of the status of the studies � Korea (Republic of) , China (People's Republic of) , Japan 2023-06-02
[ 1712 ]
Proposal for the working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHZ] � Korea (Republic of) , Japan 2023-06-02
[ 1711 ]
Proposal for a draft liaison statement to external organizations to inform the completion of a draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND] � China (People's Republic of) , Japan , Korea (Republic of) 2023-06-02
[ 1709 ]
Proposed modifications to preliminary draft revision of Recommendation ITU-R M.2070-1 and ITU-R M.2071-1 � Japan , China (People's Republic of) , Korea (Republic of) 2023-06-01
[ 1708 ]
Proposed modification of a preliminary draft new Recommendation ITU-R M.[IMT. FRAMEWORK FOR 2030 AND BEYOND] � Japan 2023-06-01
[ 1707 ]
Finalisation of final Note to the Director of the BR for the studies on RR No. 21.5 � Japan 2023-06-01
[ 1706 ]
Finalization of draft revision of Recommendation ITU-R M.1036-6 � Japan 2023-06-01
[ 1609 ]
Proposed modification of working documents towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] � Japan 2023-01-23
[ 1608 ]
Study of path loss and cross polarization characteristics in indoor scenario towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] � Japan 2023-01-23
[ 1607 ]
Transmission loss study in indoor scenario towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] � Japan 2023-01-23
[ 1606 ]
Proposed revision of a preliminary draft new Report ITU-R M.[IMT.ABOVE 100GHz] � Japan 2023-01-23
[ 1605 ]
Building penetration loss study at 2, 26, 97, and 158 GHz towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] � Japan 2023-01-23
[ 1604 ]
Proposed summary of Report ITU-R M.[IMT.ABOVE 100GHz] for Sub-Working Group Vision � Japan , Korea (Republic of) 2023-01-23
[ 1603 ]
Proposed modifications to working documents towards preliminary draft revision of Recommendation ITU-R M.2071-1 � Japan , China (People's Republic of) , Korea (Republic of) 2023-01-23
[ 1602 ]
Finalization of draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations � Japan 2023-01-23
[ 1450 ]
Updated Annex 9 of the draft working document towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHz] � Japan 2022-09-30
[ 1449 ]
Proposed modification of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - IMT Vision - Framework and overall objectives of the future development of IMT for 2030 and beyond � Japan 2022-09-30
[ 1448 ]
Proposed modifications to working documents towards preliminary draft revision of Recommendations ITU-R M.2070-1 and ITU-R M.2071-1 � Japan , China (People's Republic of) , Korea (Republic of) 2022-09-30
[ 1447 ]
Proposals on working document towards draft CPM text on WRC-23 agenda item 1.4 � Japan AI1.4 2022-09-30
[ 1446 ]
Proposed modification to summary of results on sharing study of the fixed-satellite service (Earth-to-space) and IMT systems operating in the 7 025-7 125 MHz frequency band � Japan AI1.2 2022-09-30
[ 1445 ]
Proposed new technical analysis for studies on RR No. 21.5 � Japan 2022-09-30
[ 1444 ]
Finalization of draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations � Japan 2022-09-30
[ 1439 ]
Proposal for the liaison statement to ITU-R Woking Parties 5A, 5C, 6A, 6B, 6C, and ITU-T Study Group 16 � China (People's Republic of) , Japan , Korea (Republic of) 2022-09-30
[ 1435 ]
Proposals on draft summary of Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND] for Sub-Working Group Vision � China (People's Republic of) , Japan , Korea (Republic of) 2022-09-30
[ 1404 ]
Proposal for updated timeline figure to a working document towards preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] � China (People's Republic of) , Japan , Korea (Republic of) 2022-09-29
[ 1403 ]
(Rev.1)
Proposal to the working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHZ] � Japan , Korea (Republic of) 2022-09-29
[ 1342 ]
Proposed revision of Resolution ITU-R 56-2 � China (People's Republic of) , Japan , Korea (Republic of) 2022-06-06
[ 1337 ]
Proposal to adopt option B as the overview timeline for IMT towards 2030 and beyond � China (People's Republic of) , Japan , Korea (Republic of) 2022-06-06
[ 1332 ]
Considerations on Resolution ITU-R 65 � China (People's Republic of) , Japan , Korea (Republic of) 2022-06-06
[ 1313 ]
Proposed modification of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] � Japan 2022-06-06
[ 1312 ]
Path loss study in indoor scenario towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHZ] � Japan 2022-06-06
[ 1311 ]
Updated Annex 5 of the draft working document towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHZ] � Japan 2022-06-06
[ 1310 ]
Proposals on working document towards draft CPM text on WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1309 ]
Proposals on Annex 4 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1308 ]
Proposals on Annex 3 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1307 ]
Proposals on Annex 2 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1306 ]
Proposals on Annex 1 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1305 ]
Proposals on Section 5 of the working document towards sharing and compatibility studies of HIBS under WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1304 ]
Proposal on working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS]/Working document related to WRC-23 agenda item 1.4 � Japan AI1.4 2022-06-06
[ 1303 ]
Sharing study of the fixed satellite service (Earth-to-space) and IMT systems operating in the 7 025-7 125 MHz frequency band � Japan AI1.2 2022-06-06
[ 1302 ]
Proposed modifications to Section 2.1.1 of the working document for the studies on RR No. 21.5 � Japan 2022-06-06
[ 1301 ]
Proposed ways forward for the issues regarding the working document on RR No. 21.5 studies � Japan 2022-06-06
[ 1208 ]
Proposal for the works in preparation for RA-23 � Korea (Republic of) , Japan 2022-06-03
[ 1083 ]
Proposed working method for the studies on RR No. 21.5 at Spectrum Aspects and WRC-23 Preparation WG meeting � Japan 2022-03-22
[ 1082 ]
Sharing study of the fixed-satellite service (Earth-to-space) and IMT systems operating in the 7 025-7 125 MHz frequency band � Japan 2022-03-22
[ 1027 ]
Proposed modification of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] � Japan 2022-01-31
[ 1026 ]
Pathloss study on frequency band from 2 GHz to 300 GHz bands in urban microcell scenario towards a PDN Report ITU-R M.[IMT.ABOVE 100 GHz TECHNICAL FEASIBILITY OF IMT IN BANDS ABOVE 100 GHz] � Japan 2022-01-31
[ 1025 ]
Proposed updates on the working document towards a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS TOWARDS 2030 AND BEYOND] � Japan 2022-01-31
[ 1024 ]
Further considerations on overview timeline on "IMT towards 2030 and beyond" � Japan 2022-01-31
Resultats:110 documents
R�sultats :� 1 - 2 - 3 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-1-25