Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP1B.AR : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP1B.AR� C�

UIT-R�WP1B.AR

M�thodologies de la Gestion du Spectre et Strat�gies Economiques

Resultats:14 documents
Contributions �[�Source:�Korea (Republic of)�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 56 ]
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports � Korea (Republic of) 2024-10-22
[ 55 ]
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents � Korea (Republic of) 2024-10-22
[ 54 ]
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) 2024-10-22
[ 53 ]
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems � Korea (Republic of) 2024-10-22
[ 39 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) 2023-05-19
[ 38 ]
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems � Korea (Republic of) 2023-05-19
[ 25 ]
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems � Korea (Republic of) 2022-06-20
[ 24 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2022-06-20
[ 18 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-10-26
[ 17 ]
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization � Korea (Republic of) 2021-10-26
[ 12 ]
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-05-14
[ 6 ]
Proposed revision of Report ITU-R SM.2153-7 [UPDATING SRD RELATED LEGISTLATION IN KOREA] - Technical and operating parameters and spectrum use for short range radiocommunication devices � Korea (Republic of) 2020-11-13
[ 5 ]
Proposesed revision of Report ITU-R SM.2153-7 (Technical Regulation for SRDs in Korea) � Korea (Republic of) 2020-11-13
[ 4 ]
Proposed draft new ITU-R Question - Spectrum management framework for the introduction of GPR/WPR � Korea (Republic of) 2020-11-13
Resultats:14 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-2-9