Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP4A : Contributions : 196 Ajout�s r�cemment�-� Recherche de documents de r�union
[196]� Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016)

Format

Taille

Mise � disposition

English

Word

63396 octets 2016-11-03 [196]�Annex 38- List of Liaison Statements to ITU-R Groups

Word

61561 octets 2016-11-03 [196]�Annex 37- Liaison statement to ITU-D Study Group 1, Question 2/1 (copy to Coordination Committee for Vocabulary (CCV), Working Parties 4B, 4C, 5A, 5B, 5C, 5D and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?

Word

64748 octets 2016-10-20 [196]�Annex 36- Work plan for WRC-19 agenda item 9.1, issue 9.1.9

Word

68912 octets 2016-10-19 [196]�Annex 35- Working document towards preliminary draft CPM Text for WRC-19 agenda item 9.1, issue 9.1.3

Word

72847 octets 2016-10-19 [196]�Annex 34- Work plan for WRC-19 agenda item 9.1, issue 9.1.3

Word

80961 octets 2016-10-19 [196]�Annex 33- Working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2

Word

72833 octets 2016-10-19 [196]�Annex 32- Work plan for WRC-19 agenda item 9.1, issue 9.1.2

Word

66543 octets 2016-10-19 [196]�Annex 31- Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13 or 9.21

Word

63708 octets 2016-10-19 [196]�Annex 30- Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Discrepancy and / or inconsistency between the regulatory provisions dealing with any changes to the characteristics of an assignment

Word

62292 octets 2016-10-18 [196]�Annex 29- Work plan for WRC-19 agenda item 7

Word

64149 octets 2016-10-19 [196]�Annex 28- Work plan for WRC-19 agenda item 1.6

Word

69761 octets 2016-10-18 [196]�Annex 27- Work plan for WRC-19 agenda item 1.5

Word

62912 octets 2016-10-18 [196]�Annex 26- Work plan for WRC-19 agenda item 1.4

Word

75129 octets 2016-10-18 [196]�Annex 25- Working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G

Word

84699 octets 2016-10-18 [196]�Annex 24- Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F

Word

68751 octets 2016-10-18 [196]�Annex 23- Working document - Harmonization of RR Appendix 30B with RR Appendices 30 and 30A - WRC-19 agenda item 7 - Issue E

Word

178795 octets 2016-10-18 [196]�Annex 22- Working document - Application of coordination arc in the Ka-band, to determine coordination requirements between the FSS and other satellite services

Word

5224102 octets 2016-10-18 [196]�Annex 21- Working document - Considerations on the content and application of Recommendation ITU-R S.1503-2

Word

133611 octets 2016-10-18 [196]�Annex 20- Working document on WRC-19 agenda item 1.5 - ITU SRS database analysis of [stationary] FSS earth station characteristics in 17.7-19.7 GHz

Word

196840 octets 2016-10-18 [196]�Annex 19- Working document on WRC-19 agenda item 1.5 - ITU SRS database analysis of [stationary] FSS earth station e.i.r.p. spectral density envelope in 27.5-29.5 GHz

Word

2512812 octets 2016-10-14 [196]�Annex 18- Working document on WRC-19 agenda item 1.5 - Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the interference from land-based earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed satellite service into fixed service stations operating in the 27.5-29.5 GHz frequency band

Word

561835 octets 2016-10-14 [196]�Annex 17- Working document on WRC-19 Agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band

Word

469033 octets 2016-10-14 [196]�Annex 16- Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz

Word

574882 octets 2016-10-14 [196]�Annex 15- Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHZ] - Uplink interference issues associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band

Word

91502 octets 2016-10-14 [196]�Annex 14- Working document towards a preliminary draft new Report ITU-R S.[NON-AXIAL_SYM_ANT] - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band

Word

396868 octets 2016-10-14 [196]�Annex 13- Working document [towards a preliminary draft new Report] on sharing with Incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9

Word

999685 octets 2016-10-14 [196]�Annex 12- Working document [towards a prelimInary draft new Report] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9

Word

134899 octets 2016-10-14 [196]�Annex 11- Working document [Towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4-GHZ] on technical and regulatory studies for 6/4 GHz GSO/NON-GSO FSS sharing

Word

1054676 octets 2016-10-14 [196]�Annex 10- Working document towards a preliminary draft new Report ITU-R S.[NGSO FSS 6/4 GHZ SHARING]

Word

2449697 octets 2016-10-14 [196]�Annex 09- Working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems - WRC-19 agenda item 1.6

Word

825364 octets 2016-10-14 [196]�Annex 08- Working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6

Word

111368 octets 2016-10-13 [196]�Annex 07- Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems

Word

127058 octets 2016-10-07 [196]�Annex 06- Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Studies on compatibility of International Mobile Telecommunications and broadcasting-satellite service (sound) in the frequency band 1 452-1 492 MHz in Regions 1 and 3 - WRC-19 agenda item 9.1, issue 9.1.2

Word

1954915 octets 2016-10-12 [196]�Annex 05- Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions

Word

1764284 octets 2016-10-12 [196]�Annex 04- Working document towards a preliminary draft revision of Recommendation ITU-R S.1323-2 - Maximum permissible levels of interference in a satellite network (GSO/FSS; non-GSO/FSS; non-GSO/MSS feeder links) in the fixed-satellite service caused by other co-directional FSS networks operating in frequency bands below 52.4 GHz

Word

69232 octets 2016-10-12 [196]�Annex 03- Working document towards a preliminary draft new [Recommendation/REPORT] ITU-R S.[GUIDELINES_14.5-14.8 GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band14.5-14.8 GHz

Word

139928 octets 2016-10-07 [196]�Annex 02- Working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERF.AREA] - A guiding methodology using Appendix 7 of the Radio Regulations to determine the area where ubiquitously deployed earth stations of the fixed-satellite service can be deployed [without triggering coordination with other countries]

Word

199008 octets 2016-10-11 [196]�Annex 01- Preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UA] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B

Word

154438 octets 2016-11-03 [196]�- Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016)

Document :

UIT-R�WP4A� Contribution� 196

Titre :

Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016)

Re�u le :

2016-10-06

Source :

Chairman, WP 4A

Disponibilit� :

R�serv� aux utilisateurs TIES�[UIT-R]

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2016-11-03