Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP3M : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP3M� C�

UIT-R�WP3M

Propagation point-�-point et Terre-espace

Resultats:12 documents
Contributions �[�Source:�WP 5D�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 348 ]
Liaison statement to Working Parties 3K and 3M - Co-channel sharing analysis involving IMT-Advanced systems using HAPS as base stations in accordance with RR No. 5.388A � WP 5D 2018-10-19
[ 341 ]
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5B) - Clutter loss model for sharing study regarding aeronautical path below 6 GHz � WP 5D 2018-06-21
[ 274 ]
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14 � WP 5D 2018-02-12
[ 214 ]
Liaison statement to Working Party 3M - Software implementation of Recommendation ITU-R P.452 � WP 5D 2017-06-27
[ 120 ]
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-10-17
[ 115 ]
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-06-30
[ 112 ]
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7 � WP 5D AI1.7 2016-06-24
[ 111 ]
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3 � WP 5D AI1.3 2016-06-23
[ 110 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9 � WP 5D AI9.1 2016-06-23
[ 107 ]
(Rev.1)
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D � WP 5D AI1.13 2016-06-20
[ 6 ]
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 4C) - Propagation model for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band � WP 5D 2016-03-09
[ 5 ]
Liaison statement to Working Parties 3J, 3K and 3M: Channel model(s) for the evaluation of IMT-2020 candidate technologies in frequency bands up to 100 GHz � WP 5D 2016-03-09
Resultats:12 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-1-10