Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP3K : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP3K� C�

UIT-R�WP3K

Propagation Point-Zone

Resultats:14 documents
Contributions �[�Source:�WP 6A�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 324 ]
Reply liaison statement to Working Party 3K - Guidance for implementing second generation DTTB systems and methods for the evaluation of their quality of service and time variation in Monte Carlo simulations for coverage and interference assessment in the broadcasting service � WP 6A 2019-07-29
[ 275 ]
Liaison statement to Working Parties 3L and 3K (copy for information to Working Parties 1A, 1B and 5A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) � WP 6A 2019-04-30
[ 259 ]
Liaison statement to Working Parties 1C and 3K - Guidance for implementing beyond 1st generation DTTB systems and methods for evaluation of their quality of service performance requirements � WP 6A 2018-10-31
[ 210 ]
Liaison statement to Working Party 5A - Copied for information to Working Parties 3K, 3M, 5B and 5C - WRC-19 agenda item.1.1 sharing and compatibility studies � WP 6A AI1.1 2018-05-11
[ 209 ]
Liaison statement to Working Party 3K (copy for information to Working Party 3J and Working Party 3M) - Use of Modulation Error Ratio (MER) to assess ducting � WP 6A 2018-05-10
[ 206 ]
Liaison statement to ITU-R Working Party 3K - Location variability in land area-coverage prediction � WP 6A 2017-10-23
[ 205 ]
Liaison statement to Working Party 3K (copy for information to Working Parties 3J and 3M) - Use of Modulation Error Ratio (MER) to assess ducting � WP 6A 2017-10-23
[ 165 ]
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13 � Chairman, WP 6A AI1.13 2017-04-05
[ 164 ]
Liaison statement to Working Party 3K - Use of Modulation Error Ratio (MER) to assess ducting � WP 6A 2017-04-03
[ 163 ]
Liaison statement to Working Party 3K - Location variability in land area-coverage prediction � WP 6A 2017-04-03
[ 84 ]
Liaison statement to Working Party 3K (copy to ITU-R Study Group 3) - Ducting effects on received signal quality of digital TV services � WP 6A 2016-11-04
[ 83 ]
Liaison statement to Working Party 5D (copy to Working Parties 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 6A 2016-11-04
[ 82 ]
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) WRC-19 agenda item 1.1 � WP 6A AI1.1 2016-11-04
[ 3 ]
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1 � WP 6A AI1.1 2016-02-03
Resultats:14 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-1-9