Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : SG07 : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�SG07� C�

UIT-R�SG07

Services Scientifiques

Resultats:7 documents
Contributions �[�Source:�JTG 4-5-6-7�]���Documents / Contributions

Num�ro
Titre Source Date
[ 78 ]
Executive Report to Study Groups 4 and 7 on the work of Joint Task Group 4-5-6-7 � Chairman, JTG 4-5-6-7 2014-09-10
[ 77 ]
(Rev.1)
Draft new Report ITU-R SA.[EESS-IMT 2 025-2 290 MHZ] - Sharing between space-to-space links in space research, space operation and Earth exploration-satellite services and IMT systems in the frequency bands 2 025-2 110 MHz and 2 200-2 290 MHz � JTG 4-5-6-7 2014-08-19
[ 76 ]
(Rev.1)
Draft new Report ITU-R SA.[METSAT-IMT 1.7 GHz] - Sharing assessment between meteorological-satellite systems and IMT stations in the 1 695-1 710 MHz frequency band � JTG 4-5-6-7 2014-08-14
[ 75 ]
(Rev.1)
Draft new Report ITU-R RA.[RAS-IMT] - Compatibility and sharing studies between the radio astronomy service and IMT systems in the frequency bands 608-614 MHz, 1 330-1 400 MHz, 1 400-1 427 MHz, 1 610.6-1 613.8 MHz, 1 660-1 670 MHz, 2 690-2 700 MHz, 4 800-4 990 MHz and 4 990-5 000 MHz � JTG 4-5-6-7 2014-08-13
[ 74 ]
(Rev.1)
Draft new Report ITU-R RS.[EESS-IMT 1.4 GHz] - Consideration of the frequency bands 1 375-1 400 MHz and 1 427-1 452 MHz for the mobile service - Compatibility with systems of the Earth exploration-satellite service (EESS) within the 1 400-1 427 MHz frequency band � JTG 4-5-6-7 2014-08-13
[ 27 ]
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics � JTG 4-5-6-7 2012-12-06
[ 4 ]
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1 � Chairman, JTG 4-5-6-7 2012-03-26
Resultats:7 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-1-10