Contributions ��
�
Num�ro �
Titre
Source
AI/Question
Filtre...
112/8
23/6
236-1/4
263-1/4
287/4
46/4
46-3/4
60/6
72-3/4
73-2/4
75-3/4
Effacer filtre
Date
�
[ 205 ]
�
�
Liaison statement - New versions of the Access Network Transport (ANT) - Standardization plan and Workplan
�
�
ITU-T Study Group 15
�
�
2012-01-03
�
[ 204 ]
�
�
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications links to achieve the assume link availability
�
�
WP 3J and WP 3M
�
�
2011-10-26
�
[ 203 ]
�
�
Liaison statement to the Coordination Committee for Vocabulary (copy to Study Group 4 and Working Party 4B) - Proposed definitions for "Integrated MSS system" and "Hybrid satellite/Terrestrial system" terminals
�
�
SG 6
�
�
2011-10-19
�
[ 202 ]
�
�
Liaison statement to ITU-R Working Party 5D (Copy to ITU-R Working Party 4B and ITU-T Study Group 13) - Access technology for broadband telecommunications including IMT, for developing countries
�
�
ITU-D SG 2, Question 25/2
�
�
2011-10-06
�
[ 201 ]
�
�
Liaison statement to ITU-T Study Groups 11, 13 and 17, and to ITU-R Working Parties 4B and 5C - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects
�
�
ITU-D SG 2, Question 26/2 (W)
�
�
2011-10-05
�
[ 200 ]
�
+Ann.1-15 �
Report on the thirty first meeting of Working Party 4B (Geneva, 19 - 23 September 2011)
�
�
Chairman, WP 4B
�
�
2011-09-23
�
[ 199 ]
�
�
Final List of Participants - Working Party 4B (Geneva, 19-23 September 2011)
�
�
Director, BR
�
�
2011-09-23
�
[ 198 ]
�
�
List of documents issued
�
�
BR Study Group Department
�
�
2011-09-16
�
[ 197 ]
�
�
Preliminary draft new Report ITU-R S.[CROSS_LAYER] - Cross-layer QoS for IP-based hybrid satellite-terrestrial networks
�
�
United States of America
�
287/4
�
2011-09-07
�
[ 196 ]
�
�
Preliminary draft new Recommendation ITU-R S.[CROSS_LAYER] - Cross-layer QoS provisioning in IP-based hybrid satellite-terrestrial networks
�
�
United States of America
�
287/4
�
2011-09-07
�
[ 195 ]
�
�
Working document - Preliminary self-evaluation of candidate satellite radio transmission technology for IMT-Advanced, "SAT-OFDM"
�
�
Korea (Republic of)
�
�
2011-09-06
�
[ 194 ]
�
�
Working document towards preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): SAT-OFDM
�
�
Korea (Republic of)
�
�
2011-09-06
�
[ 193 ]
�
�
Proposed preliminary draft revision of Recommendation ITU-R M.1850 - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-2000 (IMT-2000)
�
�
Korea (Republic of)
�
�
2011-09-06
�
[ 192 ]
�
�
Draft new Recommendation ITU-R M.[SATIMT_CIRCUL] - Global circulation of IMT-2000 satellite terminals
�
�
France
�
�
2011-09-12
�
[ 191 ]
�
�
Proposed modification to Working Document towards a preliminary draft new Recommendation ITU-R S.[ACM] - Impact of adaptive coding and modulation on availability objectives
�
�
Japan
�
�
2011-09-01
�
[ 190 ]
�
�
Liaison statement to ITU-R Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A, Working Party 7B for information only - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
�
�
WP 5D
�
�
2011-07-27
�
[ 189 ]
�
�
Liaison statement - revision of Resolutions ITU-R 17-3, ITU-R 56 and ITU-R 57
�
�
WP 5D
�
�
2011-07-26
�
[ 188 ]
�
�
Proposed liaison statement to the coordination committee for Vocabulary (copy to Study Group 6 and Working Party 6B) - Proposed definitions for "Integrated MSS Systems" and "Hybrid Satellite/Terrestrial System" terminals
�
�
France
�
�
2011-07-11
�
[ 187 ]
�
�
Liaison statement to Workin gparty 4B - Revision of Recommendation ITU-R M.1224
�
�
WP 5D
�
�
2011-07-26
�
[ 186 ]
�
�
Liaison statement to Working Party 4B (copy to ITU-D Study Group 2) - Development of a Handbook on "Global Trends in IMT"
�
�
WP 5D
�
�
2011-07-26
�
[ 185 ]
�
�
Liaison statement to Working Party 4B - Revision of Resolution ITU-R 50-1 and Opinion ITU-R 92-1
�
�
WP 5D
�
�
2011-07-26
�
[ 184 ]
�
�
Liaison statement to Working Parties 3J and 3M (copy to Working Party 4B for information) - Propagation End-to-End link availablility of unmanned aircraft system operating with dual beyond Line-of-Sight (BLOS) satellite communications links to achieve the assumed link availability
�
�
WP 5B
�
�
2011-07-01
�
[ 183 ]
�
�
Liaison statement to Working Party 4B (copy to Working Party 4A and Working Party 4C for information) - Potential link availability for unmanned aircraft control and non-payload communications (CNPC) links
�
�
WP 5B
�
�
2011-07-01
�
[ 182 ]
�
�
Revision of ITU-R Recommendations
�
�
Chairmen, WPs 4A, 4B and 4C
�
�
2011-06-24
�
[ 181 ]
�
�
Liaison statement to Working Parties 4A, 4B, 4C, 6A, 6B and 6C - On possible action in relation to Opinion ITU-R 51
�
�
WP 5C
�
�
2011-06-24
�
[ 180 ]
�
�
Reply liaison statement to ITU-D Study Group 2 (copy to ITU-R Working Parties 4B and 4C)
�
�
WP 5C
�
�
2011-06-23
�
[ 179 ]
�
�
Points of contact for satellite news gathering licensing
�
�
BR Study Group Department
�
�
2011-06-23
�
[ 178 ]
�
�
Liaison statement to ITU-R Working Parties 4B and 5C - Question 26/2 - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects
�
�
ITU-D SG 2
�
�
2011-06-14
�
[ 177 ]
�
�
Liaison statement (copy to WP 6B for information) - Standardized set of test conditions and measurement procedures for the subjective and objective determination of protection ratios for television in the terrestrial broadcasting and the broadcasting-satellite services
�
�
WP 6A
�
�
2011-06-08
�
[ 176 ]
�
�
Liaison statement to Working Party 4B - Proposal for modification of Recommendation ITU-R BO.789
�
�
WP 6A
�
60/6
�
2011-06-08
�
[ 175 ]
�
�
Liaison statement to Working Party 4B - Working document towards a preliminary draft new Recommendation ITU-R F.[FDIRMETH] - Methodology for the calculation of aggregate reduction in throughput and definition of fractional degradation in effective information rate for satellite links including those employing Adaptive Coding and Modulation
�
�
WP 4A
�
�
2011-05-26
�
[ 174 ]
�
�
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - Example of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links
�
�
WP 4A
�
�
2011-05-24
�
[ 173 ]
�
�
ITU-R Study Group 5 Recommendation ITU-R M.1177-4 to be brought to the attention of Study Groups 1 and 4
�
�
BR Study Group Department
�
�
2011-05-18
�
[ 172 ]
�
+Ann.1-11 �
Report on the thirtieth meeting of Working Party 4B (Geneva, 2-6 May 2011)
�
�
Chairman, WP 4B (W)
�
�
2011-05-06
�
[ 171 ]
�
�
Final List of Participants - Working Party 4B (Geneva, 2-6 May 2011)
�
�
Director, BR (W)
�
�
2011-05-06
�
[ 170 ]
�
�
List of documents issued
�
�
BR Study Group Department
�
�
2011-04-29
�
[ 169 ]
�
�
Satellite component of IMT
�
�
Chairman, WP 4C
�
�
2011-04-26
�
[ 168 ]
�
�
Working document towards a preliminary draft new Recommendation ITU-R M.[SATIMT_CIRCUL] - Global circulation of IMT-2000 satellite terminals
�
�
France
�
�
2011-04-25
�
[ 167 ]
�
�
Working document towards a preliminary draft revision of Recommendation ITU-R M.1850 - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-2000 (IMT-2000)
�
�
Korea (Republic of)
�
�
2011-04-21
�
[ 166 ]
�
�
Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): SAT-OFDM
�
�
Korea (Republic of)
�
�
2011-04-21
�
[ 165 ]
�
�
Liaison statement to ITU-D SG 2, ITU-T SG 13 and ITU-R WP 4B
�
�
WP 5D
�
�
2011-04-21
�
[ 164 ]
�
�
Liaison statement to Working Party 4B - Plan to revise Recommendation ITU-R M.1579 for Global circulation of IMT-2000 terminals
�
�
WP 5D
�
�
2011-04-20
�
[ 163 ]
�
�
Future work on the satellite component of IMT
�
�
Chairman, WP 4C
�
�
2011-04-14
�
[ 162 ]
�
�
ITU-R Study Group 6 Recommendation ITU-R BT.1833-1 to be brought to the attention of Study Group 4
�
�
BR Study Group Department
�
�
2011-04-14
�
[ 161 ]
�
�
Liaison statement to ITU-R Working Parties 4B and 4A
�
�
ITU-D SG 2
�
�
2011-03-28
�
[ 160 ]
�
�
Liaison statement to ITU-R Working Parties 5D and 4B, ITU-T Question 13
�
�
ITU-D SG 2
�
�
2011-03-28
�
[ 159 ]
�
�
Study Group 6 Question 128-1/6 to be brought to the attention of Study Group 4
�
�
BR Study Group Department
�
�
2011-03-25
�
[ 158 ]
�
�
ITU-R Study Group 6 Report ITU-R BT.2049-4 to be brought to the attention of Study Group 4
�
�
BR Study Group Department
�
�
2011-03-11
�
[ 157 ]
�
(Rev.1) �
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Overview and Work Plan
�
�
ITU-T SG 15
�
�
2011-03-08
�
[ 156 ]
�
�
Liaison statement to Working Parties 4A and 4B - Examples of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links
�
�
WP 5B
�
�
2010-11-26
Resultats:205 documents R�sultats :�
1 -
2 -
3 -
4 -
5
�-�Suivant
�
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):