Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP1B : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP1B� C�

UIT-R�WP1B

M�thodologies de la gestion du spectre

Resultats:11 documents
Contributions �[�Source:�WP 6A�]���Documents / Contributions

Num�ro
Titre Source Date
[ 316 ]
Liaison statement to Study Group 1 and Working Party 1B - Technical and operating parameters and spectrum use for short-range Radiocommunication devices � WP 6A 2011-10-19
[ 315 ]
Liaison statement to Study Group 1 (for information to Study Group 7 and Working Parties 1A, 1B, 4A, 4C, 5B and 5C) - Definitions for adjacent channel leakage power ratio (ACLR) and adjacent channel selectivity (ACS) � WP 6A 2011-10-10
[ 270 ]
(Rev.1)
Liaison statement to ITU-R Study Groups - Methodology for calculation of maximum [PERMISSIBLE] power flux-density limits for the protection of digital terrestrial television broadcasting services from interference generated by mobile services including IMT systems where identified in the Radio Regulations � WP 6A 2010-11-08
[ 216 ]
Liaison statement on WRC-12 Agenda item 1.2 � WP 6A 2010-05-14
[ 162 ]
Liaison statement to Working Party 1B - WRC-12 Agenda item 1.19 � WP 6A 2009-12-08
[ 94 ]
Liaison statement to Working Party 1B - On the study of software-defined radio and congnitive radio systems for WRC-11 Agenda item 1.19 � WP 6A 2009-05-14
[ 50 ]
Liaison statement to Working Party 1B - Requirements for protection against interference generated by short-range devices (SRD) operating in the terrestrial broadcast bands � WP 6A 2008-11-21
[ 49 ]
Liaison statement to Working Party 1B - On the study of software-defined radio and cognitive radio systems for WRC-11 Agenda item 1.19 � WP 6A 2008-11-21
[ 29 ]
Liaison reply to Working Party 4C (copied to Working Parties 3J, 3K, 3L, 3M, 7A, 7B, 7C, 7D, 4A, 4B, 6A, 6B, 6C, 1A, 1B, 1C, 5A, 5B, 5C and 5D for information) - Studies related to WRC-11 Agenda item 1.25 � WP 6A 2008-06-11
[ 28 ]
Liaison statement to ITU-R Working Party 1B on software-defined radio and congnitive radio systems - (copy for information to ITU-R Working Party 5A, 5B and ITU-R Study Groups 3, 4 and 7) � WP 6A 2008-06-11
[ 27 ]
Liaison statement to Working Party 1B - Requirements for protection against interference generated by short range devices (SRD) operating in the terrestrial broadcast bands � WP 6A 2008-06-11
Resultats:11 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-1-24