Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP7B : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP7B� C�

UIT-R�WP7B

Syst�mes de radiocommunication spatiale

Resultats:20 documents
Contributions �[�Source:�WP 4A�]���Documents / Contributions

Num�ro
Titre Source Date
[ 178 ]
Liaison statement to Working Party 7B - PDNR on frequency sharing between space VLBI and Lunar systems of the SRS and FSS systems in the 37.5-38 GHz band � WP 4A 2007-06-28
[ 177 ]
Liaison statement to Working Party 7B - Guidelines for efficient use of the geostationary orbit by fixed-satellite and meteorological satellite systems operating in a common 300 MHz band within the 18-18.4 GHz frequency range in the space-to-Earth direction � WP 4A 2007-06-28
[ 174 ]
Liaison statement to WP 1B - Study of Software Defined Radio and cognitive radio systems in WP 1B � WP 4A 2007-06-08
[ 153 ]
Liaison statement to the Special Committee for action and to Working Parties 6S, 8D AND 7B for information - Advanced publication information on Non-Geostationary satellite systems not subject to coordination under Section II of Article 9 � WP 4A 2006-10-03
[ 152 ]
Liaison statement to WP 7B - The applicability of Recommendation ITU-R S.1432 to the frequency band 18.0-18.4 GHz � WP 4A 2006-09-27
[ 128 ]
Liaison statement to Working Party 7B and copy to Working Parties 9D and 8A for information - "Proposed draft CPM text for WRC-07" agenda item 1.2 (Resolution 746 (WRC-03), 18 GHz) � WP 4A 2006-04-28
[ 126 ]
Liaison statement to Working Parties 6S, 8D and Working Party 7B for information - Advanced publication information on non-geostationary satellite systems not subject to coordination under Section II of Article 9 � WP 4A 2006-04-20
[ 114 ]
Liaison statement to WPs 4-9S, 6S, 7B and 8D - Draft letter to Director, BR on definition of HEO (AI 7.1 (H)) � WP 4A 2005-11-17
[ 113 ]
Liaison statement to Working Parties 4-9S, 6S, 7B, 8D, 9D and the Coordination Committee for Vocabulary - Development of DNR S.[HEO_Sys_Char] - Characterization of HEO-type FSS systems � WP 4A 2005-11-17
[ 111 ]
Liaison statement to Working Party 7B - Modifications to proposed draft elements for CPM text for WRC-07 Agenda item 1.2 � WP 4A 2005-11-11
[ 93 ]
Liaison statement to WP 7B and to WP 6S for information - Compatibility studies between the meteorological-satellite service and the fixed satellite service in the band 18.0-18.4 GHz � WP 4A 2005-06-21
[ 92 ]
Liaison statement to WP 7B request for guidance on the possible use of the band 27.0-27.5 GHz by NGSO FSS systems � WP 4A 2005-06-20
[ 91 ]
Liaison statement to WP 7B containing proposed draft elements for CPM text for WRC-07 Agenda item 1.2 � WP 4A 2005-06-20
[ 90 ]
Liaison statement to WP 7B - Additional GSO FSS Network data for the Recommendation ITU-R S.1328 database � WP 4A 2005-06-20
[ 66 ]
Liaison statement to Working Party 7B - Compatibility studies between the meteorological satellite service and the fixed-satellite service in the band 18.0-18.4 GHz � WP 4A 2004-11-08
[ 65 ]
Liaison statement to Working Party 7B - Sharing between non-GSO/GSO inter-satellite links and GSO/GSO inter-satellite links in the bands 22.55-23.55 GHz and 25.5-27.5 GHz � WP 4A 2004-11-08
[ 64 ]
Liaison statement to WP 7B - Sharing between space research service (space VLBI telemetry) and fixed-satellite service in the 37.5-38 GHz band � WP 4A 2004-11-08
[ 63 ]
(Rev.1-2)
Liaison statement to Working Parties 6S, 8D, 7B and 4-9S � WP 4A 2004-10-28
[ 33 ]
Draft liaison statement to Working Party 7B - Compatibility studies for geostationary meteorological satellite systems operating in the space-to Earth direction, and the fixed-satellite service, in the 18.0-18.1 GHz and/or 18.3-18.4 GHz bands � WP 4A 2004-05-05
[ 32 ]
Liaison statement to Working Party 7B - Sharing between the space research service (space very long satellite interferometry telemetry) and the fixed-satellite service in the 37.5-38 GHz band � WP 4A 2004-05-05
Resultats:20 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-1-10