Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG02 : Reuni�n�2023-03-13�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG02� C�(2023-03-13)�

UIT-T�SG02

Operational aspects

Periodo de estudios 2022

Reuni�n� del 2023-03-13 al 2023-03-22

Lugar : E-Meeting

Otras reuniones : 2024-06-192024-03-112023-11-082022-05-16

Resultados :18 documentos
Contribuciones �[�AI/Cuesti�n:�Q5/2�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 97 ]
Proposed revised baseline text for M.rODFos: Requirements for Optical Distribution Frame (ODF) On-Site Smart Maintenance � Beijing University of Posts and Telecommunications (China) , State Grid Beijing Electric Power Research Institute (China) Q5/2 2023-02-28
[ 96 ]
Proposed new work item on: Management Requirements for industrial Internet network � Beijing University of Posts and Telecommunications (China) , State Grid Corporation of China Q5/2 2023-02-28
[ 94 ]
Proposed revised baseline text for M.rfmls: Management Requirements for Federated Machine Learning Systems: Proposed texts for management requirements � Beijing University of Posts and Telecommunications (China) , State Grid Corporation of China , State Grid Zhejiang Electric Power Co., Ltd. Research Institute (China) Q5/2 2023-02-28
[ 90 ]
Proposed revised baseline text for M.rmnoc-AI: Requirements for the management of network operation cost within AITOM in telecom operational aspects � China Telecommunications Corporation Q5/2 2023-02-28
[ 87 ]
Proposed revised baseline text for M.rcpnm: Requirements for Computing Power Network Management (modification for the section on functional requirements) � Beijing University of Posts and Telecommunications (China) , China Telecommunications Corporation , State Grid Corporation of China Q5/2 2023-02-28
[ 82 ]
Proposed new work item on: Operational Management Requirements for Federated Machine Learning based Services � China Telecommunications Corporation Q5/2 2023-02-27
[ 81 ]
Proposed new work item on: Requirements for smart maintenance of communication infrastructure based on unmanned aerial vehicles � China Telecommunications Corporation Q5/2 2023-02-27
[ 78 ]
Proposed new work item on: Requirements for AI capability management within AITOM � China Telecommunications Corporation Q5/2 2023-02-27
[ 77 ]
Proposed new work item on: Requirements for customer experience smart management of telecom services � China Telecommunications Corporation Q5/2 2023-02-27
[ 76 ]
Proposed revised baseline text for M.rla-AI: Requirements for Log Analysis with AI-enhanced Management System (for consent) � Beijing University of Posts and Telecommunications (China) , Inspur Communications Technology Co., Ltd. (China) , State Grid Beijing Electric Power Research Institute (China) Q5/2 2023-02-27
[ 75 ]
(Rev.1)
Proposed revised baseline text for M.rsca: Requirements for smart comprehensive analysis within AITOM (new text of Chapter 8) � Asiainfo Technologies (China), Inc. , China Telecommunications Corporation Q5/2 2023-02-27
[ 72 ]
Proposed revised baseline text for M.rrsp: Requirements for robot-based on-site smart patrol of telecommunication network (for consent) � Beijing University of Posts and Telecommunications (China) , State Grid Information & Telecommunication Group Co., Ltd. (China) Q5/2 2023-02-27
[ 70 ]
Proposed revised baseline text for M.rmbs: Requirements for management of blockchain system (for consent) � Beijing University of Posts and Telecommunications (China) , State Grid Corporation of China Q5/2 2023-02-27
[ 69 ]
Proposed revised baseline text for M.rsmca: Requirements for smart maintenance of cell antenna � China Telecommunications Corporation Q5/2 2023-02-27
[ 68 ]
Proposed new work item on: Requirement for service design within SOMM � China Telecommunications Corporation Q5/2 2023-02-27
[ 67 ]
Proposed new work item on: X interface requirement for telecom operation system and internet e-commerce platform � China Telecommunications Corporation Q5/2 2023-02-27
[ 66 ]
Proposed new work item on: Telecommunication preventive maintenance task - Overview � China Unicom Q5/2 2023-02-27
[ 65 ]
Proposed revised baseline text for M.rsca: Requirements for smart comprehensive analysis within AITOM �
China Telecommunications Corporation Q5/2 2023-02-27
Resultados :18 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-10