Contribuciones
�[�AI/Cuesti�n:�Q13/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2861 ]
�
� |
Appendix on Equipment/Network Analysis/Budget [G.8273.4]
�
� |
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2021-11-23 |
|
[ 2859 ]
�
� |
PTP Connection Monitoring with portDS.networkMonitor [G.8275.1]
�
� |
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2021-11-23 |
|
[ 2840 ]
�
� |
T-BC transients [G.8273.2]
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2021-11-23 |
|
[ 2839 ]
�
� |
Application of Alternate Master to Monitoring Use Cases
�
� |
Nokia USA (United States)
� |
Q13/15
� |
2021-11-23 |
|
[ 2837 ]
�
� |
Network Limits considerations [G.8271.2]
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2021-11-23 |
|
[ 2835 ]
�
� |
Inclusion of interfering traffic in PTP performance testing [G.8273]
�
� |
Calnex Solutions plc. (United Kingdom)
,
Nokia USA (United States)
� |
Q13/15
� |
2021-11-23 |
|
[ 2833 ]
�
� |
Maximum Inter-Message Interval [G.8275.2]
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2021-11-23 |
|
[ 2831 ]
�
� |
Maximum Inter-Message Interval [G.8275.1]
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2021-11-23 |
|
[ 2829 ]
�
� |
State diagram study ITU-T G.8275.1.
�
� |
Orange (France)
� |
Q13/15
� |
2021-11-23 |
|
[ 2824 ]
�
� |
PTP Monitoring with Alternate Master
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2021-11-23 |
|
[ 2803 ]
�
� |
Results of time error generation testing of T-BCs with FlexE-based interfaces
�
� |
Calnex Solutions plc. (United Kingdom)
,
China Telecommunications Corporation
� |
Q13/15
� |
2021-11-23 |
|
[ 2802 ]
�
� |
G.8273.2: Appendix on Testing PTP Noise Tolerance of T-BC and T-TSC Clocks
�
� |
Calnex Solutions plc. (United Kingdom)
� |
Q13/15
� |
2021-11-23 |
|
[ 2787 ]
�
(Rev.1)� |
Reply to 3GPP Liaison/ Ref: 3GPP TSG SA2-2106786-LS02)
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
� |
Q13/15
� |
2021-11-23 |
|
[ 2786 ]
�
� |
Proposals for PTP Pac in G.7721
�
� |
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2021-11-23 |
|
[ 2785 ]
�
� |
Proposals for PTP Sync Pac in G.7721
�
� |
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2021-11-23 |
|
[ 2784 ]
�
� |
G.8271: 900 ns for end-to-end 5G Systems
�
� |
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2021-11-23 |
|
[ 2782 ]
�
� |
G. 8275.1 T-BC ClockClass values corresponding to "holdover" during a "free-run".
�
� |
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2021-11-23 |
|
[ 2780 ]
�
� |
Proposal for NE Sync Pac in G.7721
�
� |
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2021-11-23 |
|
[ 2779 ]
�
� |
Attributes for physical layer frequency synchronization [G.781]
�
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q13/15
� |
2021-11-23 |
|
[ 2775 ]
�
� |
Considerations on PRTC deployment scenarios
�
� |
China Information Communication Technologies Group
� |
Q13/15
� |
2021-11-23 |
|
[ 2774 ]
�
� |
Further considerations on monitoring function and restoration of the PTSF port
�
� |
China Information Communication Technologies Group
� |
Q13/15
� |
2021-11-23 |
|
[ 2766 ]
�
� |
Proposal on the text of G.7721.1
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q14/15, Q13/15
� |
2021-11-23 |
|
[ 2763 ]
�
� |
PTP Announce Message Delay times
�
� |
China Mobile Communications Co. Ltd.
� |
Q13/15
� |
2021-11-23 |
|
[ 2756 ]
�
� |
Proposal on timestamp generation for MTN
�
� |
China Mobile Communications Co. Ltd.
� |
Q13/15, Q11/15
� |
2021-11-23 |
|
[ 2737 ]
�
� |
Proposed a new work item on a new PTP profile for accuracy path selection (G. 8275.x)
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q13/15
� |
2021-11-23 |
|
[ 2722 ]
�
� |
EEC output from T-BC-P / T-TSC-P clock model
�
� |
Ciena Canada
� |
Q13/15
� |
2021-11-22 |
|
[ 2716 ]
�
� |
Requirement on satellite common view system
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q13/15
� |
2021-11-22 |
|
[ 2711 ]
�
� |
Proposed updates to the YANG model in G.7721.1 v0.03
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q14/15, Q13/15
� |
2021-11-22 |
|
[ 2710 ]
�
� |
Proposed updates to the UML model in G.7721.1 v0.03
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q14/15, Q13/15
� |
2021-11-22 |
|
[ 2671 ]
�
� |
PTSF restoration [G.8275.1]
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2021-11-22 |
|
[ 2670 ]
�
� |
PRTC and ePRTC attributes Appendix [G.8275.1]
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
� |
Q13/15
� |
2021-11-22 |
|
[ 2669 ]
�
� |
Time error monitor [G.8275.1]
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2021-11-22 |
|
[ 2668 ]
�
� |
G.781.1 Clauses 9.2.1 and 9.2.2
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2021-11-22 |
|
[ 2667 ]
�
� |
IEEE 802.3cx message timestamp point
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2021-11-22 |
|
[ 2666 ]
�
� |
Some further analysis of OSU timing
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15, Q11/15
� |
2021-11-22 |
|
[ 2661 ]
�
� |
Time network with multiple time transfer methods [G.8275]
�
� |
China Unicom
,
Orange (France)
� |
Q13/15
� |
2021-11-22 |
|
[ 2660 ]
�
� |
For G8273.2, G.8262.1 oscillators actual holdover data
�
� |
Epson America Inc. (United States)
� |
Q13/15
� |
2021-11-22 |
|
[ 2656 ]
�
� |
A.1 text for G.8272.2
�
� |
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2021-11-21 |
|
[ 2634 ]
�
� |
Consideration on the synchronization scheme for CBR over OSU
�
� |
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15, Q11/15
� |
2021-11-19 |
|
[ 2625 ]
�
� |
Continuous timescales in Telecom
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q14/15, Q13/15
� |
2021-11-18 |
|
[ 2617 ]
�
� |
Usage of PTP enhanced accuracy TLV
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2021-11-12 |
|
[ 2616 ]
�
� |
High Accuracy Time Stamping on ethernet interface considerations
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2021-11-12 |
|
[ 2612 ]
�
� |
Draft text for PTP over MTN in G.8275.1
�
� |
Ciena Canada
� |
Q13/15
� |
2021-11-10 |
|
[ 2611 ]
�
� |
IPv6 in Telecom Profiles [G.8265.1, G.8275.2]
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2021-11-09 |
|
[ 2607 ]
�
� |
Optical Clocks, ePRTC and cnPRTC architecture
�
� |
Deutsche Telekom AG (Germany)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q13/15
� |
2021-10-15 |
Resultados :45 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):