Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2017-06-19�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2017-06-19)�

UIT-T�SG 15

Transport, access and home

Periodo de estudios 2017

Reuni�n� del 2017-06-19 al 2017-06-30

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-12-062021-04-122020-09-072020-01-272019-07-012018-10-082018-01-29

Resultados :31 documentos
Contribuciones �[�AI/Cuesti�n:�Q6/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 359 ]
Measurement of EVM-related parameters from a user (operator) perspective � Deutsche Telekom AG (Germany) Q6/15 2017-06-06
[ 358 ]
Systematic IQ impairments of commercially available 100G coherent QPSK transmitters � Deutsche Telekom AG (Germany) Q6/15 2017-06-06
[ 326 ]
Towards open DWDM optical networking � Huawei Technologies Co., Ltd. (China) Q9/15, Q6/15, Q14/15, Q12/15, Q11/15 2017-06-06
[ 322 ]
Discussion and proposal of link loss for G.metro � China Unicom Q6/15 2017-06-06
[ 253 ]
Considerations on 200G and 400G application codes in G.698.2 � Huawei Technologies Co., Ltd. (China) Q6/15, Q12/15, Q11/15 2017-06-06
[ 252 ]
Digital Switch Over in Palestine � Ministry of Telecommunications & Information Technology Q6/15 2017-06-06
[ 251 ]
(Rev.1)
Considerations on optical interfaces for Mobile Fronthaul and 5G applications � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) Q6/15, Q12/15, Q11/15 2017-06-06
[ 244 ]
Experimental results and observations for the metric to define the transmitter quality in G.698.2 � Huawei Technologies Co., Ltd. (China) Q6/15 2017-06-06
[ 214 ]
EVM related test results of commercial transponders � Ministry of Industry and Information Technology (MIIT) (China) , China Mobile , ZTE Corporation (China) Q6/15 2017-06-06
[ 213 ]
Some suggestions on the progress of G.698.2 � Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2017-06-06
[ 212 ]
Proposed revision of Appendix V to G.959.1 � Ministry of Industry and Information Technology (MIIT) (China) Q6/15 2017-06-06
[ 174 ]
Proposed 40 channels application parameters for G.metro � ADVA Optical Networking (United Kingdom) , China Unicom , Finisar Corporation , Huawei Technologies Co., Ltd. (China) , Telefon AB - LM Ericsson (Sweden) , ZTE Corporation (China) Q6/15 2017-06-05
[ 173 ]
Terrestrial deployment and 400G system test results of G.654 fibre in China Unicom � China Unicom Q6/15, Q5/15 2017-06-05
[ 163 ]
Proposal for revising G.697 to improve e-OTDR related contents � China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) Q6/15 2017-06-05
[ 120 ]
Considerations about the work in support of the 5G transport � China Unicom , CAICT , ZTE Corporation (China) Q6/15 2017-06-05
[ 119 ]
proposals about the modification of Appendix V of G.959.1 � China Unicom , ZTE Corporation (China) Q6/15 2017-06-05
[ 118 ]
proposals about a minimum capability of 100G receiver for EVM in G.698.2 � China Unicom , CAICT , ZTE Corporation (China) Q6/15 2017-06-05
[ 114 ]
Proposal for OD/OM related issues in G.metro � FiberHome Technologies Group (China) Q6/15 2017-06-05
[ 90 ]
Clarification on WD06-06 of the Q6 Sunnyvale Interim meeting Jan. 16-19, 2017 � Coriant GmbH & Co. KG (Germany) , Deutsche Telekom AG (Germany) , Keysight Technologies Deutschland GmbH , Nokia Q6/15 2017-06-04
[ 68 ]
OCh and OTSiA OH associated with FlexO-LR � Huawei Technologies Co., Ltd. (China) Q6/15, Q14/15, Q11/15 2017-06-03
[ 57 ]
Suggested location of information related to LDV for attenuation � OFS Fitel, LLC Q6/15, Q5/15 2017-06-02
[ 56 ]
Explicit and Simple Formulae for Constellation Impairment Parameters that Minimize the EVM � Tektronix, Inc. Q6/15 2017-06-02
[ 47 ]
Further EVM measurement results � Ciena Canada Q6/15 2017-06-02
[ 46 ]
200G and 400G optical interfaces � Ciena Canada Q6/15 2017-06-02
[ 43 ]
Performance assessment of the Staircase-FEC (SC-FEC) at 100G � Acacia Communications, Inc , Orange (France) Q6/15, Q11/15 2017-06-02
[ 21 ]
200G and 400G specification method � Finisar Corporation Q6/15 2017-05-31
[ 19 ]
Appendix replacing the editor note in Clause 10.2, Output power setting during tuning, of G.metro � ADVA Optical Networking (United Kingdom) , China Unicom , Telefon AB - LM Ericsson (Sweden) Q6/15 2017-05-29
[ 18 ]
Message example in G.metro � ADVA Optical Networking (United Kingdom) , China Unicom , Telefon AB - LM Ericsson (Sweden) Q6/15 2017-05-29
[ 11 ]
EVM and OSNR penalty measurements for draft revised G.698.2 � ADVA Optical Networking (United Kingdom) , Keysight Technologies Deutschland GmbH Q6/15 2017-05-19
[ 10 ]
G.metro wavelength pairing � ADVA Optical Networking (United Kingdom) , China Unicom , Telefon AB - LM Ericsson (Sweden) Q6/15 2017-05-19
[ 2 ]
(Rev.1)
Applicability of norms on transport and access networks and transport network architecture � Cameroun (Minist�re des Postes et T�l�communications) Q9/15, Q6/15, Q5/15, Q4/15, Q3/15, Q2/15, Q12/15, Q10/15, Q1/15 2017-04-20
Resultados :31 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-10