Contribuciones
�[�AI/Cuesti�n:�Q6/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 359 ]
�
� |
Measurement of EVM-related parameters from a user (operator) perspective
�
� |
Deutsche Telekom AG (Germany)
� |
Q6/15
� |
2017-06-06 |
|
[ 358 ]
�
� |
Systematic IQ impairments of commercially available 100G coherent QPSK transmitters
�
� |
Deutsche Telekom AG (Germany)
� |
Q6/15
� |
2017-06-06 |
|
[ 326 ]
�
� |
Towards open DWDM optical networking
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2017-06-06 |
|
[ 322 ]
�
� |
Discussion and proposal of link loss for G.metro
�
� |
China Unicom
� |
Q6/15
� |
2017-06-06 |
|
[ 253 ]
�
� |
Considerations on 200G and 400G application codes in G.698.2
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q6/15, Q12/15, Q11/15
� |
2017-06-06 |
|
[ 252 ]
�
� |
Digital Switch Over in Palestine
�
� |
Ministry of Telecommunications & Information Technology
� |
Q6/15
� |
2017-06-06 |
|
[ 251 ]
�
(Rev.1)� |
Considerations on optical interfaces for Mobile Fronthaul and 5G applications
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q6/15, Q12/15, Q11/15
� |
2017-06-06 |
|
[ 244 ]
�
� |
Experimental results and observations for the metric to define the transmitter quality in G.698.2
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q6/15
� |
2017-06-06 |
|
[ 214 ]
�
� |
EVM related test results of commercial transponders
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
China Mobile
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-06 |
|
[ 213 ]
�
� |
Some suggestions on the progress of G.698.2
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-06 |
|
[ 212 ]
�
� |
Proposed revision of Appendix V to G.959.1
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q6/15
� |
2017-06-06 |
|
[ 174 ]
�
� |
Proposed 40 channels application parameters for G.metro
�
� |
ADVA Optical Networking (United Kingdom)
,
China Unicom
,
Finisar Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Telefon AB - LM Ericsson (Sweden)
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 173 ]
�
� |
Terrestrial deployment and 400G system test results of G.654 fibre in China Unicom
�
� |
China Unicom
� |
Q6/15, Q5/15
� |
2017-06-05 |
|
[ 163 ]
�
� |
Proposal for revising G.697 to improve e-OTDR related contents
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 120 ]
�
� |
Considerations about the work in support of the 5G transport
�
� |
China Unicom
,
CAICT
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 119 ]
�
� |
proposals about the modification of Appendix V of G.959.1
�
� |
China Unicom
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 118 ]
�
� |
proposals about a minimum capability of 100G receiver for EVM in G.698.2
�
� |
China Unicom
,
CAICT
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 114 ]
�
� |
Proposal for OD/OM related issues in G.metro
�
� |
FiberHome Technologies Group (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 90 ]
�
� |
Clarification on WD06-06 of the Q6 Sunnyvale Interim meeting Jan. 16-19, 2017
�
� |
Coriant GmbH & Co. KG (Germany)
,
Deutsche Telekom AG (Germany)
,
Keysight Technologies Deutschland GmbH
,
Nokia
� |
Q6/15
� |
2017-06-04 |
|
[ 68 ]
�
� |
OCh and OTSiA OH associated with FlexO-LR
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q6/15, Q14/15, Q11/15
� |
2017-06-03 |
|
[ 57 ]
�
� |
Suggested location of information related to LDV for attenuation
�
� |
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2017-06-02 |
|
[ 56 ]
�
� |
Explicit and Simple Formulae for Constellation Impairment Parameters that Minimize the EVM
�
� |
Tektronix, Inc.
� |
Q6/15
� |
2017-06-02 |
|
[ 47 ]
�
� |
Further EVM measurement results
�
� |
Ciena Canada
� |
Q6/15
� |
2017-06-02 |
|
[ 46 ]
�
� |
200G and 400G optical interfaces
�
� |
Ciena Canada
� |
Q6/15
� |
2017-06-02 |
|
[ 43 ]
�
� |
Performance assessment of the Staircase-FEC (SC-FEC) at 100G
�
� |
Acacia Communications, Inc
,
Orange (France)
� |
Q6/15, Q11/15
� |
2017-06-02 |
|
[ 21 ]
�
� |
200G and 400G specification method
�
� |
Finisar Corporation
� |
Q6/15
� |
2017-05-31 |
|
[ 19 ]
�
� |
Appendix replacing the editor note in Clause 10.2, Output power setting during tuning, of G.metro
�
� |
ADVA Optical Networking (United Kingdom)
,
China Unicom
,
Telefon AB - LM Ericsson (Sweden)
� |
Q6/15
� |
2017-05-29 |
|
[ 18 ]
�
� |
Message example in G.metro
�
� |
ADVA Optical Networking (United Kingdom)
,
China Unicom
,
Telefon AB - LM Ericsson (Sweden)
� |
Q6/15
� |
2017-05-29 |
|
[ 11 ]
�
� |
EVM and OSNR penalty measurements for draft revised G.698.2
�
� |
ADVA Optical Networking (United Kingdom)
,
Keysight Technologies Deutschland GmbH
� |
Q6/15
� |
2017-05-19 |
|
[ 10 ]
�
� |
G.metro wavelength pairing
�
� |
ADVA Optical Networking (United Kingdom)
,
China Unicom
,
Telefon AB - LM Ericsson (Sweden)
� |
Q6/15
� |
2017-05-19 |
|
[ 2 ]
�
(Rev.1)� |
Applicability of norms on transport and access networks and transport network architecture
�
� |
Cameroun (Minist�re des Postes et T�l�communications)
� |
Q9/15, Q6/15, Q5/15, Q4/15, Q3/15, Q2/15, Q12/15, Q10/15, Q1/15
� |
2017-04-20 |
Resultados :31 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):