Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2017-06-19�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2017-06-19)�

UIT-T�SG 15

Transport, access and home

Periodo de estudios 2017

Reuni�n� del 2017-06-19 al 2017-06-30

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-12-062021-04-122020-09-072020-01-272019-07-012018-10-082018-01-29

Resultados :94 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�AI/Cuesti�n:�Q13/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 398 ]
Comparison of PTP Monitoring Options of Annex G [G.8275.1] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 388 ]
PLL Convergence of Unmonitored Connection: Start-Up or Switching [G.8275.1, G.8273.2] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 366 ]
Impact of Timestamp Processing Delay [G.8275.1] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 354 ]
G.8273.1 T-GM interfaces � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 353 ]
G.8272 amendment number � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 352 ]
ePRC phase discontinuity requirement � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 348 ]
(Rev.1)
GNSS document introduction � Nokia Corporation Q13/15 2017-06-06
[ 339 ]
Misc Profile Clean-Up [G.8275.1] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 335 ]
Alternate Master Time Information: Use Description [G.8275.1] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 333 ]
Alternate Master Time Information: Splitting PASSIVE & MASTER/SLAVE [G.8275.1] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 331 ]
Network Limits & Usefulness of Alignment [G.8271.2] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 329 ]
Enhanced Holdover Reporting T-TSC-P &T-TSC-A [G.8275.2] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 328 ]
Mapping clockClass to QL [G.8275.1, G.8275.2] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 327 ]
PTP states [G.810, G.syncOAM] � Microsemi Corporation (United States) Q13/15 2017-06-06
[ 324 ]
G.8271: Time-of-Day Checksum Field � Calnex Solutions Limited Q13/15 2017-06-06
[ 309 ]
T-TC residence time measurement � Huawei Technologies Co., Ltd. (China) , CAICT , MITT Q13/15 2017-06-06
[ 307 ]
Resolving GNSS Errors- WD_GNSS � Orange (France) Q13/15 2017-06-06
[ 306 ]
Revision of structure/format of "Appendix for GNSS receiver usage"document � Nokia USA , Orange (France) Q13/15 2017-06-06
[ 305 ]
Text clarifications on the clause "Short-term interruption" in G.8262/G.8262.1 � Calnex Solutions Limited , Orange (France) Q13/15 2017-06-06
[ 304 ]
Study of PTP transients in congruent/non-congruent scenario � Orange (France) Q13/15 2017-06-06
[ 303 ]
Fronthaul network reference model � Orange (France) Q13/15 2017-06-06
[ 302 ]
Fronthaul synchronization requirements � Orange (France) Q13/15 2017-06-06
[ 301 ]
Impact of functional splits on synchronization requirements � Orange (France) Q13/15 2017-06-06
[ 300 ]
APTS scenarios in 8271.2 and 8273.4 � Nokia Corporation Q13/15 2017-06-06
[ 294 ]
(Rev.1-2)
Frequency Amplitude Estimation Method for G.8273.2 Appendix VI � Calnex Solutions Limited , RAD Data Communications, Ltd. Q13/15 2017-06-06
[ 289 ]
+Corr.1
Comments and Proposals for G.8273.2 Appendix VI Choice of Frequencies for Measuring Noise Transfer � RAD Data Communications, Ltd. Q13/15 2017-06-06
[ 271 ]
+Corr.1
Editorial Comments on G.8275.1 � RAD Data Communications, Ltd. Q13/15 2017-06-06
[ 270 ]
+Corr.1
Editorial Comments on G.8275.2 � RAD Data Communications, Ltd. Q13/15 2017-06-06
[ 269 ]
Consideration on frequency selection and frequency recovery for the G.8273.2 noise transfer test � China Unicom Q13/15 2017-06-06
[ 268 ]
Clarification on WD39 of Shanghai meeting � China Unicom , ZTE Corporation (China) Q13/15 2017-06-06
[ 264 ]
Monitoring Time Offset in PTP Connections [G.8275.1, G.Suppl.SyncOAM] � Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q13/15 2017-06-06
[ 263 ]
PDV noise tolerance test of G.8263 � China Unicom , Huawei Technologies Co., Ltd. (China) , Orange (France) Q13/15 2017-06-06
[ 262 ]
Title revision of Q13 recommendation � Orange (France) , CAICT , China Mobile Communications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) Q13/15 2017-06-06
[ 261 ]
Network limit of G.8271.2 � Huawei Technologies Co., Ltd. (China) Q13/15 2017-06-06
[ 260 ]
Cable delay effects and correction in a GNSS receiver � Nokia Corporation Q13/15 2017-06-06
[ 259 ]
Initial PTP simulation Results for HRMs containing eEECs, ePRTCs, and Class C T-BCs � Huawei Technologies Co., Ltd. (China) Q13/15 2017-06-06
[ 258 ]
(Rev.1)
5G Sync Requirement [G.8271] � Orange (France) , CAICT , China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) , MITT Q13/15 2017-06-06
[ 257 ]
Proposals for G.781 to address remaining items prior to planned consent [G.781] � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) Q13/15 2017-06-06
[ 256 ]
Clarification of T-TSC specification � Huawei Technologies Co., Ltd. (China) Q13/15 2017-06-06
[ 255 ]
T-TC residence time proposal � Huawei Technologies Co., Ltd. (China) , CAICT , MITT Q13/15 2017-06-06
[ 243 ]
(Rev.1)
Effect of thermal ramps on phase accuracy for APTS and PTS implementations � Nokia Corporation Q13/15 2017-06-06
[ 235 ]
Considerations on Mobile Fronthaul and 5G Transport � Telefon AB - LM Ericsson (Sweden) Q13/15, Q11/15 2017-06-06
[ 234 ]
Editorial proposals for G.8271.1 Appendix VIII � Telefon AB - LM Ericsson (Sweden) Q13/15 2017-06-06
[ 226 ]
Simulation results on the influence of atomic clock group change on combinatorial clock output performance. � Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2017-06-06
[ 224 ]
An implementation of ePRC based on optical clock � Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2017-06-06
[ 223 ]
Some consideration for TDEV tolerance noise in G.812 � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2017-06-06
[ 221 ]
Some suggestions for the definition of phase discontinuity in G.811.1 � Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2017-06-06
[ 220 ]
A potential solution for combinatorial clock optimization in G.811.1 � Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2017-06-06
[ 204 ]
Noise generation requirement in G.8262.1 � Qulsar, Inc. Q13/15 2017-06-05
[ 202 ]
Packet selection implication in G.8273.2 � Qulsar, Inc. Q13/15 2017-06-05
Resultados :94 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-10