Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 16 : Reuni�n�2013-10-28�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 16� TD-WP3�(2013-10-28)�

UIT-T�SG 16

Multimedios

Periodo de estudios 2013

Reuni�n� del 2013-10-28 al 2013-11-08

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-05-232015-10-122015-02-092014-06-302014-02-28� [ 2013-10-28 ]� 2013-01-14

Resultados :48 documentos
Documentos Temporales �(WP3) ��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 106-WP3 ]
Report of Question 18/16 "Implementation and interaction aspects of signal processing network equipment/terminals" � Rapporteur Q18/16 Q18/16 2013-07-17
[ 105-WP3 ]
Report of Question 16/16 "Speech enhancement functions in signal processing network equipment" � Rapporteur Q16/16 Q16/16 2013-07-17
[ 104-WP3 ]
Report of Question 15/16 "Voiceband signal discrimination and modem/facsimile terminal protocols" � Rapporteur Q15/16 Q15/16 2013-07-17
[ 103-WP3 ]
(Rev.1)
Report of Question 10/16 "Speech and audio coding and related software tools" � Rapporteur Q10/16 a.i. Q10/16 2013-07-17
[ 102-WP3 ]
Report Rapporteur Q7 (Geneva) �
TD withdrawn. Question did not hold any session.
Rapporteur Q7/16 Q7/16 2013-07-17
[ 101-WP3 ]
Report of Question 6/16 "Visual coding" � Rapporteur Q6/16 Q6/16 2013-07-17
[ 100-WP3 ]
Draft LSs from Q6/16 � Rapporteur Q6/16 Q6/16 2013-11-05
[ 99-WP3 ]
+Add.1
H.264 (V9) "Advanced video coding for generic audiovisual services" (Rev.): Input draft (for consent) � Rapporteur Q6/16 Q6/16 2013-11-05
[ 98-WP3 ]
Merger of Q16/16 and Q18/16 - Proposed text of merged Questions � Rapporteur Q16/16 and Q18/16 Q18/16, Q16/16 2013-11-05
[ 97-WP3 ]
G.SPNE "Signal processing network equipment" (New): Output draft (Geneva, 28 October - 8 November 2013) � Editor G.SPNE Q18/16 2013-11-04
[ 96-WP3 ]
G.799.3 "Signal processing functionality and performance of an IP-to-IP voice gateway optimised for the transport of voice and voiceband data" (Rev.): Output draft (Geneva, 28 October - 8 November 2013) � Rapporteur Q18/16 Q18/16 2013-11-04
[ 95-WP3 ]
LS/r on a request to include a filtered modified MNRU into the new edition of the STL G.191 Recommendation to ITU-T Q10/16 (COM12-LS17) [to ITU-T SG12] � Rapporteur Q10/16 a.i. Q10/16 2013-11-04
[ 94-WP3 ]
(Rev.1)
LS/r on inclusion of tools into STL (3GPP TSG SA4-131106) [to 3GPP TSG SA4] � Rapporteur Q10/16 a.i. Q10/16 2013-11-04
[ 92-WP3 ]
G.7xx: Living list on issues concerning speech and audio codecs � Rapporteur Q10/16 a.i. Q10/16 2013-11-04
[ 91-WP3 ]
G.722-SWBS-Float "New Annex E with a floating-point implementation of ITU-T G.722 Annex D" (New): Baseline draft (Geneva, 28 October - 8 November 2013) � Rapporteur Q10/16 a.i. Q10/16 2013-11-01
[ 90-WP3 ]
G.711.1-SWBS-Float "New Annex G with a floating-point implementation of ITU-T G.711.1 Annex F" (New): Baseline text (Geneva, 28 October - 8 November 2013) � Rapporteur Q10/16 a.i. Q10/16 2013-11-01
[ 89-WP3 ]
(Rev.1)
T.38 Amd.1 "Procedures for real-time Group 3 facsimile communication over IP networks: New Appendix VI, clarifications and corrections" (New): Output draft Ed. 0.1 (Geneva, 28 October - 8 November 2013) � Editor T.38 Amd.1 Q15/16 2013-10-31
[ 88-WP3 ]
(Rev.1-2)
G.DNH "Do-No-Harm testing" (New): Output draft for Consent � Rapporteur Q16/16 Q16/16 2013-10-31
[ 87-WP3 ]
G.CJB "Procedures for the control of de-jitter buffers used in PSTN-IP gateways carrying voice-band data" (New): Output draft (Geneva, 28 October - 8 November 2013) � Editor G.CJB Q15/16 2013-10-30
[ 86-WP3 ]
ITU-T G.160 "Voice enhancement devices" (Rev.): Living list � Rapporteur Q16/16 Q16/16 2013-10-25
[ 85-WP3 ]
Q10/16 Interim activity report (January - October 2013) � Rapporteur Q10/16 a.i. Q10/16 2013-10-21
[ 84-WP3 ]
G.728 (2012): Reported problems in Annexes B and G � Rapporteur Q10/16 a.i. Q10/16 2013-10-21
[ 83-WP3 ]
G.SPNE "Signal processing network equipment" (New): Input draft (V2.10) � Rapporteur Q18/16 Q18/16 2013-10-18
[ 82-WP3 ]
G.799.3: Living List � Rapporteur Q18/16 Q18/16 2013-10-18
[ 81-WP3 ]
G.799.3 "Signal processing functionality and performance of an IP-to-IP voice gateway optimised for the transport of voice and voiceband data" (Rev.): Input draft � Rapporteur Q18/16 Q18/16 2013-10-18
[ 80-WP3 ]
G.799.2 (ex G.MDCSPNE): Living list � Rapporteur Q18/16 Q18/16 2013-10-18
[ 79-WP3 ]
G.799.2 (V2.1) "Mechanism for dynamic coordination of signal processing functions" (Rev.): Input draft � Rapporteur Q18/16 Q18/16 2013-10-18
[ 78-WP3 ]
G.799.1/Y.1451.1 "Functionality and interface specifications for GSTN transport network equipment for interconnecting GSTN and IP networks" (Rev.): Input draft � Rapporteur Q18/16 Q18/16 2013-10-18
[ 77-WP3 ]
G.161: Living list � Rapporteur Q18/16 Q18/16 2013-10-18
[ 76-WP3 ]
ITU-T G.161 "Interaction aspects of signal processing network equipment" (Rev.): Input draft � Editor G.161 Q18/16 2013-10-18
[ 75-WP3 ]
G.DNH "Do-No-Harm testing" (New): Input draft � Rapporteur Q16/16 Q16/16 2013-10-14
[ 74-WP3 ]
G.169-ALE "Automatic level control devices: New Annex B on automatic listener enhancement" (New): input draft � Rapporteur Q16/16 Q16/16 2013-10-14
[ 73-WP3 ]
(Rev.1)
G.168-EEC "Digital network echo cancellers: Annex E on embedded echo cancellers" (New): input draft � Rapporteur Q16/16 Q16/16 2013-10-14
[ 72-WP3 ]
G.168 "Digital network echo cancellers" (Rev.8): Updated draft � Rapporteur Q16/16 Q16/16 2013-10-14
[ 71-WP3 ]
(Rev.1)
ITU-T G.168 "Digital network echo cancellers" (Rev.): Living list (5 June 2013) � Rapporteur Q16/16 Q16/16 2013-10-14
[ 69-WP3 ]
Report of Q18/16 Rapporteurs Group Meeting (Darmstadt, Germany, 5-7 June 2013) � Rapporteur Q18/16 Q18/16 2013-06-19
[ 68-WP3 ]
Report of Q16/16 Rapporteurs Group Meeting (Darmstadt, Germany, 5-7 June 2013) � Rapporteur Q16/16 Q16/16 2013-06-19
[ 67-WP3 ]
Report of Q15/16 Rapporteurs Group Meeting (Darmstadt, Germany, 5-7 June 2013) � Rapporteur Q15/16 Q15/16 2013-06-19
[ 65-WP3 ]
Report of the Joint Collaborative Team on Video Coding (JCT-VC), and the Joint Collaborative Team on 3D Video (JCT-3V), Vienna, AT, 25 July - 2 August 2013 � Rapporteur Q6/16 Q6/16 2013-06-19
[ 64-WP3 ]
Report of the Joint Collaborative Team on Video Coding (JCT-VC), and the Joint Collaborative Team on 3D Video (JCT-3V), Incheon, KR, 18-26 April 2013 � Rapporteur Q6/16 Q6/16 2013-06-19
[ 63-WP3 ]
Report of the Joint Collaborative Team on Video Coding (JCT-VC) and the Joint Collaborative Team on 3D Video (JCT-3V), Geneva, 14-23 January 2013 � Rapporteur Q6/16 Q6/16 2013-06-19
[ 62-WP3 ]
Agenda and documentation for Q18/16 � Rapporteur Q18/16 Q18/16 2013-06-19
[ 61-WP3 ]
Agenda and documentation for Q16/16 � Rapporteur Q16/16 Q16/16 2013-06-19
[ 60-WP3 ]
(Rev.1)
Agenda and documentation for Q15/16 � Rapporteur Q15/16 Q15/16 2013-06-19
[ 59-WP3 ]
Agenda and documentation for Q10/16 � Rapporteur Q10/16 Q10/16 2013-06-19
[ 58-WP3 ]
Agenda and documentation for Q7/16 �
TD withdrawn. Question did not hold any session.
Rapporteur Q7/16 Q7/16 2013-06-19
[ 57-WP3 ]
Agenda and documentation for Q6/16 � Rapporteur Q6/16 Q6/16 2013-06-19
[ 56-WP3 ]
(Rev.1)
Draft agenda and work plan for WP 3/16 � Chairman WP 3/16 Q7/16, Q6/16, Q18/16, Q16/16, Q15/16, Q10/16 2013-06-19
Resultados :48 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-10