Contribuciones
�[�Origen:�ADVA Optical Networking�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2163 ]
�
(Rev.1)� |
G.8272.1 Holdover
�
� |
ADVA Optical Networking
,
Microsemi Corp
� |
Q13/15
� |
2016-09-06 |
|
[ 2118 ]
�
� |
Additional table for phase/time requirements for cluster-based synchronization (G.8271).
�
� |
ADVA Optical Networking
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2000 ]
�
� |
Wavelength Plan Proposal for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-05 |
|
[ 1943 ]
�
� |
Parameters for pilot tones and message channel for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-02 |
|
[ 1942 ]
�
� |
Appendix on Principles of Operation for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-02 |
|
[ 1919 ]
�
� |
Impact of pilot tone and message channel on the payload in G.metro
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2016-09-01 |
|
[ 1849 ]
�
(Rev.1)� |
Proposal for MDSP compromise
�
� |
ADVA Optical Networking
,
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
� |
Q9/15
� |
2016-02-02 |
|
[ 1767 ]
�
� |
Synchronization performance monitoring with Probe
�
� |
ADVA Optical Networking
,
China Unicom
� |
Q13/15
� |
2016-02-02 |
|
[ 1749 ]
�
� |
G.8272.1 transient response
�
� |
A1 Telekom Austria AG
,
ADVA Optical Networking
,
Deutsche Telekom AG
,
Microsemi Corporation
,
Orange
� |
Q13/15
� |
2016-02-02 |
|
[ 1748 ]
�
� |
G.8272.1 MTIE mask short term
�
� |
A1 Telekom Austria AG
,
ADVA Optical Networking
,
Deutsche Telekom AG
,
Microsemi Corporation
,
Orange
� |
Q13/15
� |
2016-02-02 |
|
[ 1663 ]
�
� |
Communication channel in G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Deutsche Telekom AG
,
Telefon AB - LM Ericsson
� |
Q14/15
� |
2016-02-01 |
|
[ 1608 ]
�
� |
Application code proposal in G.metro
�
� |
ADVA Optical Networking
,
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1528 ]
�
� |
Analysis of cross gain modulation caused by pilot tones
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2016-01-27 |
|
[ 1447 ]
�
� |
Parameter definitions and values on power settings for G.metro
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2015-06-09 |
|
[ 1407 ]
�
� |
Message channel parameter definitions and values for G.metro
�
� |
ADVA Optical Networking
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2015-06-09 |
|
[ 1405 ]
�
� |
Pilot tone parameter definitions and values for G.metro
�
� |
ADVA Optical Networking
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2015-06-09 |
|
[ 1399 ]
�
� |
G.8275.2 A-BMCA options - Convergence and rearrangements aspects
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2015-06-09 |
|
[ 1397 ]
�
� |
Unfiltered BC specification
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2015-06-09 |
|
[ 1394 ]
�
� |
Phase and time distribution without physical layer frequency support
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2015-06-09 |
|
[ 1393 ]
�
� |
Network design aspects for phase delivery - Eth' speed mismatch
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2015-06-09 |
|
[ 1321 ]
�
� |
Generation method for pilot tones for G.metro
�
� |
ADVA Optical Networking
,
China Unicom
,
Deutsche Telekom AG
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2015-06-08 |
|
[ 1221 ]
�
� |
The consideration of communication channel of G.metro
�
� |
ADVA Optical Networking
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
FiberHome Technologies Group
,
Telefon AB - LM Ericsson
,
ZTE Corporation
� |
Q6/15
� |
2015-06-07 |
|
[ 1219 ]
�
� |
Measurements on EVM and OSNR
�
TSB NOTE - This Contribution was reposted on 24 June 2015 to correct a display issue in some versions of Word. There are no content changes in the replacement file.
� |
China Unicom
,
ADVA Optical Networking
,
Alcatel-Lucent International
,
Coriant GmbH & Co. KG
,
Deutsche Telekom AG
,
Fraunhofer-Institut f�r Nachrichtentechnik Heinrich-Hertz-Institut
,
Keysight Technologies Deutschland GmbH
,
Orange
� |
Q6/15
� |
2015-06-07 |
|
[ 1107 ]
�
� |
G.8275.1 & G.8275.2 : Mapping between ClockClass and Quality level
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2014-11-11 |
|
[ 1106 ]
�
� |
G.8275.2: Requirement for an Accurate T3 Value
�
� |
ADVA Optical Networking
,
Calnex Solutions Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1105 ]
�
� |
G.8275.2 : A-BMCA
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2014-11-11 |
|
[ 1102 ]
�
� |
8271.2 : HRM & PDV Network Limits for Partial Timing Support
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2014-11-11 |
|
[ 1100 ]
�
� |
Filter Architectures for wavelength-filtered ODN
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1088 ]
�
� |
Transparent transport for PtP WDM to meet mobile fronthaul jitter requirements
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1087 ]
�
� |
Performance monitoring, supervision and defects management for PtP WDM
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1086 ]
�
� |
Wavelength refreshing for PtP WDM
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1083 ]
�
� |
Reduced-Power-Budget Classes for NG-PON2 for filtered ODN
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1081 ]
�
� |
Discussion on specifying pilot tone related parameters at reference point SS
�
� |
ADVA Optical Networking
,
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-11-11 |
|
[ 1045 ]
�
� |
Proposal for test plan for parameters related to EVM
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q6/15
� |
2014-11-11 |
|
[ 823 ]
�
� |
Control communication channel for G.metro
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2014-11-06 |
|
[ 822 ]
�
� |
Ranges for link insertion loss and received power in G.metro
�
� |
ADVA Optical Networking
,
Electronics and Telecommunications Research Institute (ETRI)
,
Transmode Systems AB
� |
Q6/15
� |
2014-11-06 |
|
[ 821 ]
�
� |
Impact of cross-talk interference from a tuning laser
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2014-11-06 |
|
[ 479 ]
�
� |
Protection Architectures for G.metro
�
� |
ADVA Optical Networking
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-03-07 |
|
[ 478 ]
�
(Rev.1-2)� |
Reference diagrams for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-03-07 |
|
[ 456 ]
�
� |
Modification of R-LADD definition in G.672
�
� |
ADVA Optical Networking
,
Telecom Italia S.p.A.
� |
Q7/15
� |
2014-03-03 |
|
[ 377 ]
�
� |
Requirements for passive metro WDM systems
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q6/15
� |
2013-06-18 |
|
[ 361 ]
�
� |
Complementary data for reroute detection mechanisms
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2013-06-18 |
|
[ 360 ]
�
� |
Signalling TLV for distribution of timing information
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2013-06-18 |
|
[ 359 ]
�
� |
Self Monitoring Synchronization Network Comprised Of Probing Master/BC Nodes
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2013-06-18 |
|
[ 358 ]
�
� |
Concerns about Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2013-06-18 |
|
[ 357 ]
�
� |
Alternative Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2013-06-18 |
|
[ 355 ]
�
� |
Method for estimation Gamma distribution parameters based on FPP and Maximal Delay.
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2013-06-18 |
|
[ 298 ]
�
� |
PtP WDM guard band definition
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-17 |
|
[ 137 ]
�
� |
Updated PtP WDM channel plan
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
|
[ 136 ]
�
� |
Figure update for Appendix VI
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
Resultados :56 documentos Resultados :�
1 -
2
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):