Contribuciones
�[�AI/Cuesti�n:�Q6/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2188 ]
�
� |
100G interoperability measurements up to 1600 km as in input to G.698.2
�
� |
Deutsche Telekom AG
� |
Q6/15
� |
2016-09-06 |
|
[ 2156 ]
�
+Corr.1� |
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC
�
� |
Deutsche Telekom AG
,
Acacia
,
Alcatel-Lucent USA
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
� |
Q6/15, Q11/15
� |
2016-09-06 |
|
[ 2148 ]
�
(Rev.1-2)� |
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application
�
� |
Deutsche Telekom AG
,
Acacia
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
� |
Q6/15, Q11/15
� |
2016-09-06 |
|
[ 2144 ]
�
� |
Test of EVM scripts for draft revised G.698.2
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2016-09-06 |
|
[ 2143 ]
�
� |
Considerations on optical transceiver module for G.metro
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2016-09-06 |
|
[ 2126 ]
�
� |
Proposal to enhance the description of the NOSM in G.872
�
� |
ZTE Corporation
� |
Q6/15, Q12/15
� |
2016-09-06 |
|
[ 2052 ]
�
� |
Requirement of clarify optical layer parameter for some new use cases
�
� |
China Unicom
� |
Q9/15, Q6/15
� |
2016-09-05 |
|
[ 2047 ]
�
� |
Wavelength plan consideration of G.metro
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-09-05 |
|
[ 2045 ]
�
� |
Proposal to study OSNR related issues of beyond 100G physical interface
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-09-05 |
|
[ 2044 ]
�
� |
Proposal of communication channel from TEE to HEE in G.metro
�
� |
China Unicom
� |
Q6/15
� |
2016-09-05 |
|
[ 2043 ]
�
� |
EVM related test results
�
� |
China Unicom
� |
Q6/15
� |
2016-09-05 |
|
[ 2041 ]
�
� |
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.
�
� |
China Telecommunications Corporation
,
Orange
� |
Q6/15
� |
2016-09-05 |
|
[ 2016 ]
�
� |
Proposal of reference point specification clarification for optical line interfaces of G.692
�
� |
FiberHome Technologies Group
� |
Q6/15, Q12/15
� |
2016-09-05 |
|
[ 2000 ]
�
� |
Wavelength Plan Proposal for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-05 |
|
[ 1983 ]
�
� |
EVM test of commercial transponders and impairment simulation setup
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2016-09-05 |
|
[ 1979 ]
�
� |
Band Gap and Wavelength Plan Proposal for G.metro
�
� |
Finisar Corporation
� |
Q6/15
� |
2016-09-04 |
|
[ 1945 ]
�
� |
Proposed modification to Clause 8 of G.872
�
� |
ZTE Corporation
� |
Q6/15, Q12/15
� |
2016-09-02 |
|
[ 1943 ]
�
� |
Parameters for pilot tones and message channel for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-02 |
|
[ 1942 ]
�
� |
Appendix on Principles of Operation for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-02 |
|
[ 1933 ]
�
� |
considerations about the wavelength plan of G.metro
�
� |
ZTE Corporation
� |
Q6/15
� |
2016-09-02 |
|
[ 1932 ]
�
� |
Considerations on the EVM in the G.698.2
�
� |
ZTE Corporation
,
CAICT
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2016-09-02 |
|
[ 1921 ]
�
� |
Physical Layer Implementation Guidance for "Open Line Systems"
�
� |
Xtera Communications, Inc.
� |
Q6/15
� |
2016-09-01 |
|
[ 1919 ]
�
� |
Impact of pilot tone and message channel on the payload in G.metro
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2016-09-01 |
|
[ 1869 ]
�
� |
Proposed application parameters for G.698.3
�
This Contribution was originally posted as TD252/WP2
� |
Korea Advanced Institute of Science and Technology (KAIST)
� |
Q6/15
� |
2016-02-18 |
|
[ 1868 ]
�
� |
A 10 Gb/s signal transmission with a F-P LD based seed light source
�
� |
Korea Advanced Institute of Science and Technology (KAIST)
� |
Q6/15
� |
2016-02-03 |
|
[ 1844 ]
�
� |
EVM-related 100G measurements and analysis for Black Link applications
�
� |
Deutsche Telekom AG
� |
Q6/15
� |
2016-02-02 |
|
[ 1839 ]
�
� |
Injection seeded DWDM system for 2.5 Gb/s transmission
�
� |
Korea Advanced Institute of Science and Technology (KAIST)
� |
Q6/15
� |
2016-02-02 |
|
[ 1811 ]
�
� |
Proposal for G.654.E fibre
�
� |
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2016-02-02 |
|
[ 1776 ]
�
� |
Proposal for revising Appendix I of ITU-T Recommendation G.652 revision
�
� |
Corning Incorporated
,
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2016-02-02 |
|
[ 1769 ]
�
� |
Considerations about G.metro system capacity for mobile front-hauling.
�
� |
Telecom Italia S.p.A.
� |
Q6/15
� |
2016-02-02 |
|
[ 1768 ]
�
� |
Architecture discussion of G.metro
�
� |
China Unicom
� |
Q6/15
� |
2016-02-02 |
|
[ 1720 ]
�
� |
Example of a Link Design Value (LDV) for Chromatic Dispersion
�
� |
Corning Incorporated
,
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2016-02-01 |
|
[ 1714 ]
�
� |
Proposal of the description of cross-polarisation modulation
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q7/15, Q6/15
� |
2016-02-01 |
|
[ 1713 ]
�
� |
Preliminary measurements related to pilot tone for G.metro
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2016-02-01 |
|
[ 1712 ]
�
� |
EVM measurements for draft revised G.698.2
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2016-02-01 |
|
[ 1703 ]
�
(Rev.1)� |
Further analysis of measurements on EVM and OSNR
�
� |
China Unicom
,
Coriant GmbH & Co. KG
,
Keysight Technologies Deutschland GmbH
� |
Q6/15
� |
2016-02-01 |
|
[ 1700 ]
�
� |
Proposal of new application code 4L1-9D1F and additional measurement data in G.959.1 (Updated)
�
� |
Fujitsu Limited
� |
Q6/15
� |
2016-02-01 |
|
[ 1659 ]
�
� |
Statistical approach for chromatic link dispersion using G.652.D fibres
�
� |
Prysmian SpA
� |
Q6/15, Q5/15
� |
2016-02-01 |
|
[ 1617 ]
�
� |
Revised proposal of multi-dimensional modulation format in G.Sup.39
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1616 ]
�
� |
Revised Proposals about the Super-Nyquist DWDM in G.sup39
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1613 ]
�
� |
Proposals about the scope of the G.metro
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1610 ]
�
� |
EVM related results and proposal of G.698.2
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1608 ]
�
� |
Application code proposal in G.metro
�
� |
ADVA Optical Networking
,
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1607 ]
�
� |
Consideration of information between HEE and TEE in G.metro
�
� |
China Unicom
� |
Q6/15, Q14/15
� |
2016-02-01 |
|
[ 1606 ]
�
� |
Proposal of parameters for G.654.E fibre category
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q5/15
� |
2016-02-01 |
|
[ 1605 ]
�
� |
Short reach application codes and AWG requirement in G.metro
�
� |
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
ZTE Corporation
� |
Q7/15, Q6/15
� |
2016-02-01 |
|
[ 1604 ]
�
� |
Field trials and proposal of G.654 for terrestrial application
�
� |
China Unicom
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2016-02-01 |
|
[ 1600 ]
�
(Rev.1)� |
The suggestion about multichannel parallel interfaces in B100G
�
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
� |
FiberHome Technologies Group
� |
Q6/15, Q11/15
� |
2016-02-01 |
|
[ 1595 ]
�
� |
Test results and discussion of the EVM metrics
�
� |
CAICT, P.R.China
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1593 ]
�
� |
100G system in-service OSNR monitoring and embedded OTDR test
�
� |
AICT, P.R.China
,
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
Resultados :213 documentos Resultados :�
1 -
2 -
3 -
4 -
5
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):