Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2016-02-15�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2016-02-15)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reuni�n� del 2016-02-15 al 2016-02-26

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-192015-06-222014-11-242014-03-242013-12-062013-07-012013-02-01

Resultados :47 documentos
Contribuciones �[�AI/Cuesti�n:�Q4/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1858 ]
Configuration counters in L2 states (G.9701 Amd 1) � Intel Corporation Q4/15 2016-02-02
[ 1856 ]
Comments on the draft G.9701 Amendment 1 � Intel Corporation Q4/15 2016-02-02
[ 1840 ]
G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters � Proximus PLC Q4/15 2016-02-02
[ 1838 ]
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission � Futurewei Technologies US R&D Center , Metanoia Technologies, Inc. Q4/15 2016-02-02
[ 1817 ]
G.fast: Reduction of number VF samples reporting formats � Broadcom Corporation , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-02
[ 1816 ]
G.fast: Clarification on byte order in SOC and EOC messages. � Broadcom Corporation , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-02
[ 1812 ]
G.fast: G.9701 test parameters text improvements � Alcatel-Lucent International Q4/15 2016-02-02
[ 1810 ]
G.fast: Various text updates to G.9701 Amd1 Low power mode � Alcatel-Lucent International Q4/15 2016-02-02
[ 1809 ]
G.fast: Proposal to restrict upstream transmit power for 8dBm profile � Broadcom Corporation Q4/15 2016-02-02
[ 1808 ]
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter � Alcatel-Lucent International Q4/15 2016-02-02
[ 1807 ]
G.vdsl: Mis-estimation of SNR during MEDLEY � Broadcom Corporation , Intel Corporation , Qualcomm, Inc. Q4/15 2016-02-02
[ 1806 ]
Future work on G.fast recommendations � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1805 ]
G.fast, Editorial Correction to Figure Z-2.1 � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1804 ]
G.fast: G.fast XLOG test parameter � Alcatel-Lucent International Q4/15 2016-02-02
[ 1802 ]
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1801 ]
G.ploam, G.fast: Clarification on Unavailable State for corrigendum � Alcatel-Lucent International Q4/15 2016-02-02
[ 1800 ]
G.ploam: Test parameter update time stamps in G.997.2 Amd1 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1799 ]
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1798 ]
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1. � Alcatel-Lucent International Q4/15 2016-02-02
[ 1797 ]
G.ploam: Missing lom failure in G.997.1 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1792 ]
G.vector: Considerations about Multi-Vendor Vectoring standardization � Telecom Italia S.p.A. Q4/15 2016-02-02
[ 1791 ]
G.fast: On data rate reporting � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1787 ]
Proposal for TIGAV transmission method � Intel Corporation Q4/15 2016-02-02
[ 1783 ]
G.fast: Upstream Hlog reporting � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1782 ]
G.ploam, Capability reporting in G.997.1 and G.997.2 � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1774 ]
On G.fast based solution for Coax application � British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center Q4/15 2016-02-02
[ 1744 ]
On the details of TIGAV procedure � Intel Corporation Q4/15 2016-02-02
[ 1743 ]
Proposed eoc settings for Annex Q when used with G.993.5 � Intel Corporation Q4/15 2016-02-02
[ 1742 ]
On the timeout of L2.1-Entry procedure (G.9701 Amd 1) � Intel Corporation Q4/15 2016-02-02
[ 1740 ]
Proposed corrigendum to G.9701 � Intel Corporation Q4/15 2016-02-02
[ 1702 ]
(Rev.1)
G.fast Amendment 2: Maximum Bit Loading Revisited � Huawei Technologies Co., Ltd. , Metanoia Technologies , Swisscom SA Q4/15 2016-02-01
[ 1701 ]
(Rev.1)
G.fast: Exchange and determine the time out of initialization stages in handshake � Huawei Technologies Co., Ltd. Q4/15 2016-02-01
[ 1672 ]
G.fast: Dynamic Bandwidth Allocation (DBA) for G.fast - control and management � ADTRAN , AT&T, Inc. Q4/15 2016-02-01
[ 1668 ]
(Rev.1)
G.fast: FTU-R software upgrade over eoc � ADTRAN , AT&T, Inc. , CenturyLink , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-01
[ 1662 ]
G.fast, G.hs: G.994.1 tone sets for coax � ADTRAN , AT&T, Inc. , Broadcom Corporation , Qualcomm, Inc. , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-01
[ 1661 ]
G.Fast: Requirements for operation on copper lines extended to include coaxial cables � ZTE Corporation Q4/15 2016-02-01
[ 1660 ]
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax � ZTE Corporation Q4/15 2016-02-01
[ 1567 ]
G.fast: Framework for Dynamic US/DS Time Assignment Mechanism � Qualcomm, Inc. Q4/15 2016-01-29
[ 1565 ]
G.fast - specification of Impulse noise monitoring � Swisscom SA Q4/15 2016-01-29
[ 1563 ]
(Rev.1)
G.fast: requirements for the DBA TDD DS/US ratio limits � AT&T, Inc. , ADTRAN , Sckipio Technologies S.I. Ltd. Q4/15 2016-01-29
[ 1562 ]
G.fast coax cable configurations � ADTRAN , AT&T, Inc. Q4/15 2016-01-29
[ 1561 ]
(Rev.1)
G.fast 212 MHz amendment � AT&T, Inc. , Orange , TELUS Communications Q4/15 2016-01-29
[ 1550 ]
G.fast: Signalling of DBA updates over the RMC � ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd. Q4/15 2016-01-28
[ 1549 ]
G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime � ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd. Q4/15 2016-01-28
[ 1526 ]
G.fast - Need for improved reporting of EFTR � Swisscom SA Q4/15 2016-01-27
[ 1524 ]
G.fast - Need for seamless reconfiguration of TARSNRM � Swisscom SA Q4/15 2016-01-22
[ 1499 ]
Release of BT cable (20 pair) NEXT measurements for use in simulations � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2015-12-10
Resultados :47 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25