Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2016-02-15�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2016-02-15)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reuni�n� del 2016-02-15 al 2016-02-26

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-192015-06-222014-11-242014-03-242013-12-062013-07-012013-02-01

Resultados :51 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�AI/Cuesti�n:�Q11/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1862 ]
Comment on the packet mapping text in draft G.709 clause 17.10 � Microsemi Corporation Q11/15 2016-02-02
[ 1860 ]
FlexE Aware mapping justification encoding for method 6B � Inphi Corporation Q11/15 2016-02-02
[ 1837 ]
Proposed definition and text for ODUCn GMP ?CnD CRC-9 overhead in G.709 � Microsemi Corporation Q11/15 2016-02-02
[ 1826 ]
Extended SSM message of OTN � Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange Q13/15, Q11/15 2016-02-02
[ 1823 ]
New Simulation Results for RMS Frequency Offset for Transport of a CPRI Client over OTN � Huawei Technologies Co., Ltd. Q13/15, Q11/15 2016-02-02
[ 1822 ]
Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN - Computational Considerations � Huawei Technologies Co., Ltd. Q13/15, Q11/15 2016-02-02
[ 1821 ]
Consideration of CPRI clock transport over OTN � Huawei Technologies Co., Ltd. Q13/15, Q11/15 2016-02-02
[ 1796 ]
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI) � Huawei Technologies Co., Ltd. Q11/15 2016-02-02
[ 1794 ]
Cascaded and nested protection � China Unicom , Huawei Technologies Co., Ltd. Q9/15, Q11/15 2016-02-02
[ 1747 ]
Heterogeneous CPRI multiplexing using GFP � Microsemi Corporation Q13/15, Q11/15 2016-02-02
[ 1746 ]
Recommendation for Mapping a FlexE Sub-Group into an ODUflex � Microsemi Corporation Q13/15, Q11/15 2016-02-02
[ 1734 ]
FlexO frame & sub-frame alignment and markers � Inphi Corporation Q11/15 2016-02-02
[ 1731 ]
400GBASE-R mapping into OPUflex � Inphi Corporation Q11/15 2016-02-02
[ 1724 ]
Using Standard GFP-T to map CPRI clients into an ODU Carrier - Proposed addition to the draft CPRI-over-OTN Supplement � Coriant GmbH & Co. KG , Microsemi Corporation Q13/15, Q11/15 2016-02-01
[ 1717 ]
Transporting CPRI Options 8-10 over OTN � Microsemi Corporation Q13/15, Q11/15 2016-02-01
[ 1674 ]
Comment on draft G.872 Edition 4 � Huawei Technologies Co., Ltd. Q12/15, Q11/15 2016-02-01
[ 1673 ]
FlexO atomic functional model � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1671 ]
Considerations of interconnection between FlexE and xGE � China Telecommunications Corporation , Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1670 ]
(Rev.1-2)
FlexE aware mapping method 6B text proposal � Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1669 ]
FlexE into ODUflex atomic functional model � Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1667 ]
Consideration and proposed text on block definition for error performance � Fujitsu Limited Q11/15 2016-02-01
[ 1666 ]
FlexE atomic functional model � Huawei Technologies Co., Ltd. Q11/15, Q10/15 2016-02-01
[ 1665 ]
Introduction of FlexE related atomic functions and Characteristic Information naming � Huawei Technologies Co., Ltd. Q11/15, Q10/15 2016-02-01
[ 1657 ]
Proposal to specify Module Framer Interfaces and DSP Framer Interfaces in a new G.709 supplement � Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1649 ]
(Rev.1)
Transporting CPRI clients with different clock sources �
C-1649 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
Nippon Telegraph and Telephone Corporation (NTT) Q13/15, Q11/15 2016-02-01
[ 1628 ]
Proposal to study OTN data plane pruning and refactoring � China Telecommunications Corporation , Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1627 ]
CPRI over OTN phase 2 extension � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1626 ]
Transparency of mapping of CPRI into OTN phase 2 � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1624 ]
CPRI over OTN phase 2 application update � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. Q11/15 2016-02-01
[ 1615 ]
(Rev.1)
Consideration and proposal on PTP event message in FlexO IrDI �
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
ZTE Corporation Q13/15, Q11/15 2016-02-01
[ 1614 ]
Consideration and proposal on overhead format of FlexO � ZTE Corporation Q11/15 2016-02-01
[ 1612 ]
Considerations on overhead of FlexE aware client mapping method � ZTE Corporation Q11/15 2016-02-01
[ 1611 ]
(Rev.1)
Frequency error test results - CPRI over ODU2r �
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
IP Light Q13/15, Q11/15 2016-02-01
[ 1602 ]
The consideration of interworking between OTUC1 and OTU4 � FiberHome Technologies Group Q11/15 2016-02-01
[ 1600 ]
(Rev.1)
The suggestion about multichannel parallel interfaces in B100G �
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
FiberHome Technologies Group Q6/15, Q11/15 2016-02-01
[ 1592 ]
(Rev.1-2)
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network � Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2016-02-01
[ 1588 ]
Updated SDL diagrams for G.806 � Fujitsu Limited Q11/15 2016-02-01
[ 1584 ]
Update of G.709 Appendix VII � Alcatel-Lucent USA Inc. Q11/15 2016-01-31
[ 1583 ]
Reconsideration of G.709 Appendix XII - OTLC.4 Structure � Alcatel-Lucent USA Inc. Q11/15 2016-01-31
[ 1582 ]
New Ethernet Rates and impact on OTN standardization � Alcatel-Lucent USA Inc. Q11/15 2016-01-31
[ 1574 ]
Proposed new material for media element in G.798 � Coriant GmbH & Co. KG , ZTE Corporation Q6/15, Q14/15, Q12/15, Q11/15 2016-01-29
[ 1573 ]
Proposed new material for OSC layer in G.798 � Coriant GmbH & Co. KG Q11/15 2016-01-29
[ 1572 ]
Proposed changes to clause 12/G.798 � Coriant GmbH & Co. KG Q11/15 2016-01-29
[ 1571 ]
Proposed changes to clause 11/G.798 � Coriant GmbH & Co. KG Q11/15 2016-01-29
[ 1570 ]
Proposed changes to clauses 9 and 10/G.798 � Coriant GmbH & Co. KG Q11/15 2016-01-29
[ 1569 ]
Proposed changes to clause 8/G.798 � Coriant GmbH & Co. KG Q11/15 2016-01-29
[ 1568 ]
Proposed changes to G.798 clause 6 � Coriant GmbH & Co. KG Q11/15 2016-01-29
[ 1553 ]
RMS Frequency Offset of CPRI Clients Asynchronously Mapped to and Demapped from OTN � Microsemi Corporation Q13/15, Q11/15 2016-01-29
[ 1552 ]
PTP Timestamping on Multilane OTN Interfaces � Microsemi Corporation Q13/15, Q11/15 2016-01-29
[ 1530 ]
Considerations on new Ethernet signals over OTN � KDDI Corporation Q11/15 2016-01-28
Resultados :51 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11