Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2015-06-22�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� TD�(2015-06-22)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reuni�n� del 2015-06-22 al 2015-07-03

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-192016-02-15� [ 2015-06-22 ]� 2014-11-242014-03-242013-12-062013-07-012013-02-01

Documentos Temporales �(GEN) �[�AI/Cuesti�n:�Q5/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 214-GEN ]
Delay asymmetry in G.652 fibres � Associate Rapporteur Q6/15 Q6/15, Q5/15, Q13/15 2015-06-09
[ 211-GEN ]
Liaison report from IEC SC86A/WG3 (Optical Fibres Cables) � IEC SC86A WG3 Liaison Rapporteur Q5/15, Q17/15, Q16/15 2015-06-08
[ 209-GEN ]
Liaison report from IEC SC86A/WG1 (Optical Fibres) � IEC SC86A Liaison Rapporteur Q5/15, Q17/15, Q16/15 2015-05-27

Documentos Temporales �(PLEN) �[�AI/Cuesti�n:�Q5/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 447-PLEN ]
Draft Technical Paper on "Optical Fibres, Cables and Systems" (for Agreement, 3 July 2015) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2015-06-25
[ 428-PLEN ]
(Rev.1-2)
Draft revised Recommendation ITU-T G.650.2 (for Consent, 3 July 2015) � Editor G.650.2 Q5/15 2015-06-07
[ 377-PLEN ]
(Rev.1)
WP2/15 proposed interim activities (for Agreement, 3 July 2015) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2015-04-14
[ 376-PLEN ]
WP2/15 outgoing Liaison Statements (for Agreement, 3 July 2015) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2015-04-14
[ 375-PLEN ]
WP2/15 Work Programme updates (for Agreement, 3 July 2015) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2015-04-14
Documentos presentados : 5 de un total de 7� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(WP2) �[�AI/Cuesti�n:�Q5/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 208-WP2 ]
Draft Liaison Statement to IEC SC86C drafted by Q5/15 (Geneva, June - July 2015) (LS/o) � Rapporteur Q5/15 Q7/15, Q5/15 2015-07-01
[ 206-WP2 ]
Draft outgoing liaison statements to CENELEC drafted by Q5/15 and Q7/15 (Geneva, June - July 2015) (LS/o) � Rapporteur Q5/15 , Rapporteur Q7/15 Q7/15, Q5/15 2015-07-01
[ 193-WP2 ]
Agenda of the joint Q5, 6/15 meeting (Geneva, June - July 2015) � Rapporteur Q5/15 , Rapporteur Q6/15 Q6/15, Q5/15 2015-06-22
[ 192-WP2 ]
(Rev.1)
Draft revised WP2/15 Question texts (preparation for WTSA 2016) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2015-06-21
[ 191-WP2 ]
LS/i on Update on Singlemode Mode Field Diameter and Optical Fibre Connectors [CENELEC TC86BXA] � CENELEC TC86BXA Q7/15, Q5/15 2015-06-19
Documentos presentados : 5 de un total de 20� relacionaron a este reuni�n (vea m�s...)

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25