Documentos Temporales
�(GEN)
�[�AI/Cuesti�n:�Q16/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 166-GEN ]
�
� |
Liaison report for IEC SC86A/WG3 (Optical Fibres Cables)
�
� |
IEC SC86A WG3 Liaison Rapporteur
� |
Q5/15, Q17/15, Q16/15
� |
2014-11-22 |
|
[ 162-GEN ]
�
� |
Liaison report for IEC SC86A/WG1 (Optical Fibres)
�
� |
IEC SC86A Liaison Rapporteur
� |
Q5/15, Q17/15, Q16/15
� |
2014-11-16 |
� � |
Documentos Temporales
�(PLEN)
�[�AI/Cuesti�n:�Q16/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 351-PLEN ]
�
(Rev.1-3)� |
Draft Amendment 1 to Recommendation ITU-T L.82 (2010) (for Agreement, 5 December 2014)
�
� |
Editor L.82
� |
Q16/15
� |
2014-12-03 |
|
[ 312-PLEN ]
�
� |
Draft revised Recommendations ITU-T L.43 (for Consent, 5 December 2014)
�
� |
Editor L.43
� |
Q16/15
� |
2014-10-30 |
|
[ 311-PLEN ]
�
� |
Draft revised Recommendation ITU-T L.26 (for Consent, 5 December 2014)
�
� |
Editor L.26
� |
Q16/15
� |
2014-10-30 |
|
[ 310-PLEN ]
�
� |
Draft revised Recommendation ITU-T L.10 (for Consent, 5 December 2014)
�
� |
Editor L.10
� |
Q16/15
� |
2014-10-30 |
|
[ 270-PLEN ]
�
� |
WP2/15 proposed interim activities (for Agreement, 5 December 2014)
�
� |
Chairman WP2/15
� |
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
� |
2014-09-09 |
Documentos presentados : 5 de un total de 9� relacionaron a este reuni�n (vea m�s...)
� � |
Documentos Temporales
�(WP2)
�[�AI/Cuesti�n:�Q16/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 143-WP2 ]
�
� |
Draft Questionnaire on "the requirements of low-cost optical cable backhaul solution toward realistically closing the digital divide in a timely manner"
�
� |
Rapporteur Q16/15
� |
Q16/15
� |
2014-12-03 |
|
[ 142-WP2 ]
�
� |
LS/o on transfer of Recommendation ITU-T L.71 and Handbook "Compendium of Cable Measurement Methods, 1984" (to ITU-T SG5)
�
� |
Rapporteur Q16/15
� |
Q16/15
� |
2014-12-03 |
|
[ 141-WP2 ]
�
(Rev.1)� |
LS/o on draft revised ITU-T Recommendations for Consent at ITU-T (to IEC SC86A WG3)
�
� |
Rapporteur Q16/15
� |
Q16/15
� |
2014-12-03 |
|
[ 140-WP2 ]
�
(Rev.1)� |
LS/o on revision considerations for Recommendation ITU-T L.60, "Construction of optical/metallic hybrid cables" (to IEC SC86A WG3)
�
� |
Rapporteur Q16/15
� |
Q16/15
� |
2014-12-03 |
|
[ 139-WP2 ]
�
(Rev.1)� |
LS/o on revision considerations for Recommendation ITU-T L.59, "Optical fibre cables for indoor applications" (to IEC SC86A WG3)
�
� |
Rapporteur Q16/15
� |
Q16/15
� |
2014-12-03 |
Documentos presentados : 5 de un total de 20� relacionaron a este reuni�n (vea m�s...)
� � |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):