Contribuciones
�[�AI/Cuesti�n:�Q11/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 1132 ]
�
� |
Comments on options in the CPRI Option 7 Breakout Report
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1131 ]
�
� |
Using GFP-T to map CPRI clients into OTU2c
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1130 ]
�
� |
Recommendations for providing a ODUC identifier in ODUCn
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1126 ]
�
� |
Standardized OTN Link Degradation Parameter for OTN Links with FEC
�
� |
Xtera Communications, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1093 ]
�
� |
Request to consent OTUCn/ODUCn specification
�
No file provided
� |
Deutsche Telekom AG Standardization
� |
Q11/15
� |
2014-11-11 |
|
[ 1092 ]
�
� |
Proposal for simplified B100G interfaces of packet switches
�
No file provided
� |
Deutsche Telekom AG Standardization
� |
Q11/15
� |
2014-11-11 |
|
[ 1089 ]
�
� |
FEC for B100G IrDI
�
� |
Applied Micro Circuits Corporation (AMCC)
� |
Q11/15
� |
2014-11-11 |
|
[ 1021 ]
�
� |
Amendment of G.7041- considerations of PTP & SyncO over OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-11 |
|
[ 1020 ]
�
� |
Amendment of G.709- considerations of PTP & SyncO over OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-11 |
|
[ 1007 ]
�
� |
PTP Timestamping on a Multi-Lane Interface
�
� |
Juniper Networks
,
PMC-Sierra, Inc.
� |
Q13/15, Q11/15
� |
2014-11-11 |
|
[ 1004 ]
�
� |
Lane Architecture Options for OTUCn Enhanced RS-10 IrDI FEC
�
� |
Inphi Corporation
� |
Q11/15
� |
2014-11-10 |
|
[ 1003 ]
�
� |
Enhanced RS-10 IrDI OTUCn FEC adaptation to Multilane OTLCn.m interfaces
�
� |
Inphi Corporation
� |
Q11/15
� |
2014-11-10 |
|
[ 1001 ]
�
� |
Enhanced RS FEC for OTUCn and OTU4 frame formats
�
� |
Inphi Corporation
� |
Q11/15
� |
2014-11-10 |
|
[ 984 ]
�
� |
Management of media channel and signal connections
�
� |
ZTE Corporation
� |
Q14/15, Q12/15, Q11/15
� |
2014-11-10 |
|
[ 981 ]
�
� |
Inconsistency between B100G Working Assumptions re Minimum bit rate per OTSi
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-11-10 |
|
[ 978 ]
�
� |
Proposed update and alignment of Recommendations G.870, G.709, G.798, G.872, and G.874
�
� |
Alcatel-Lucent USA Inc.
� |
Q6/15, Q3/15, Q14/15, Q12/15, Q11/15
� |
2014-11-10 |
|
[ 977 ]
�
� |
Refinement of Tributary Slot Working Assumptions for B100G
�
� |
Alcatel-Lucent USA Inc.
,
Inphi Corporation
,
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-10 |
|
[ 976 ]
�
� |
PRBS31 Test Pattern for OTN
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-11-10 |
|
[ 970 ]
�
� |
Market Drivers and Timing for B100G OTN Standardization and IaDI Considerations
�
� |
Alcatel-Lucent USA Inc.
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
,
ZTE Corporation
� |
Q11/15
� |
2014-11-10 |
|
[ 931 ]
�
� |
Considerations of B100G LL open issues
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 930 ]
�
� |
B100g OTN interface considerations
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 928 ]
�
� |
Application of B100G OTN C2C interface
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 923 ]
�
� |
Proposal on defining the sync layer functions of OTN and extending G.781
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-11-10 |
|
[ 922 ]
�
� |
CPRI clients high efficiency mapping considerations
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 915 ]
�
� |
G.798 optical layer terminology update
�
� |
Huawei Technologies Co. Ltd.
� |
Q14/15, Q11/15
� |
2014-11-10 |
|
[ 914 ]
�
� |
G.709 optical layer terminology update
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 913 ]
�
� |
B100G "L0 Service" considerations
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 911 ]
�
� |
Reducing complexity of B100G IrDI
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 910 ]
�
� |
B100G tributary slot considerations and 5G mark up of text in study point T4
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 909 ]
�
� |
Clarification of B100G working assumption A11 (below 10G ODUk multiplexing)
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-10 |
|
[ 904 ]
�
� |
Update on proposed application code for short-haul 100G IrDI in G.959.1
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q11/15
� |
2014-11-10 |
|
[ 897 ]
�
� |
OTU4 without FEC for short reach 100G IrDI
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q11/15
� |
2014-11-10 |
|
[ 885 ]
�
� |
Consideration of CPRIm over OTN
�
� |
Fujitsu Limited
� |
Q11/15
� |
2014-11-10 |
|
[ 869 ]
�
� |
considerations of 5G tribslots or 10G tribslots in B100G
�
� |
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-09 |
|
[ 868 ]
�
� |
The proposal about adding an note to the 15.7.2.4 of G.709
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-09 |
|
[ 867 ]
�
� |
Appendix of G.709 - considerations of phase/time synchronization over OTN
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-09 |
|
[ 830 ]
�
� |
Consideration on OPU and Logical Channel Unit frame structure
�
� |
ZTE Corporation
� |
Q11/15
� |
2014-11-07 |
|
[ 829 ]
�
� |
Buffer and delay evaluation of logical channel mapping and multiplexing model
�
� |
ZTE Corporation
� |
Q11/15
� |
2014-11-07 |
|
[ 828 ]
�
� |
A new type of ODUflex
�
� |
ZTE Corporation
� |
Q11/15
� |
2014-11-07 |
|
[ 827 ]
�
� |
Apply logical channel mapping and multiplexing model to current OTN
�
� |
ZTE Corporation
� |
Q11/15
� |
2014-11-07 |
|
[ 826 ]
�
� |
Consideration on OTN Frame-base Mapping Procedure
�
� |
ZTE Corporation
� |
Q11/15
� |
2014-11-07 |
|
[ 825 ]
�
� |
A new model of OTN mapping and multiplexing
�
� |
ZTE Corporation
� |
Q11/15
� |
2014-11-07 |
|
[ 824 ]
�
� |
Efficient mapping of CPRI signals over OTN draft text
�
� |
Inphi Corporation
,
IP Light
,
Xilinx Incorporation
� |
Q11/15
� |
2014-11-06 |
|
[ 817 ]
�
� |
Formats of Frame-Mapped GFP PTP Messages for PTP-over-OTN-Overhead
�
� |
PMC-Sierra, Inc.
� |
Q13/15, Q11/15
� |
2014-11-06 |
|
[ 806 ]
�
� |
G.798 Client FEC functions
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2014-11-04 |
|
[ 805 ]
�
� |
G.783 OSn/RSn_A_Sk defect correlations
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2014-11-04 |
|
[ 804 ]
�
� |
CPRI option 8 mapping into OTN
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2014-11-04 |
|
[ 803 ]
�
� |
B100G mapping of test signals
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2014-11-04 |
|
[ 802 ]
�
� |
FC-3200 (32GFC) mapping options
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2014-11-04 |
|
[ 801 ]
�
� |
G.709 Text proposal for FC-1600 (16GFC) with FEC
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2014-11-04 |
Resultados :55 documentos Resultados :�
1 -
2
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):