Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 777 ]
�
� |
Withdrawn by submitter
�
� |
N/A (no se aplica)
� |
� |
2014-03-12 |
|
[ 776 ]
�
� |
Proposed revision to G.984.5.2
�
� |
Calix Networks, Inc.
,
Telecom Italia S.p.A.
� |
Q2/15
� |
2014-03-11 |
|
[ 775 ]
�
(Rev.1)� |
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 774 ]
�
� |
Parameterization of L2.1 multi-step entry procedure
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-03-11 |
|
[ 773 ]
�
� |
G.997.1: On extending G.997.1 to support PMA functionality
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 772 ]
�
� |
G.fast: On Reverse Power Feeding system noise requirements
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 771 ]
�
� |
Document describing migration from other PTP profiles to G.8275.1
�
� |
Nokia Solutions and Networks Gmbh & Co. KG
� |
Q13/15
� |
2014-03-11 |
|
[ 770 ]
�
� |
Updates to G.8263 Testing
�
� |
Nokia Solutions and Networks Gmbh & Co. KG
� |
Q13/15
� |
2014-03-11 |
|
[ 769 ]
�
� |
Proposed revisions to G.989.2 LC document
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
Calix Networks, Inc.
,
Telecom Italia S.p.A.
� |
Q2/15
� |
2014-03-11 |
|
[ 768 ]
�
� |
Neighbour Discovery for Ethernet
�
� |
Coriant GmbH & Co. KG
� |
Q14/15
� |
2014-03-11 |
|
[ 767 ]
�
� |
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-03-11 |
|
[ 766 ]
�
� |
G.fast: Additional requirements to address specifics of RPF noise
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-03-11 |
|
[ 765 ]
�
� |
Out-of-Band protocol used to report OPS and OCh status
�
� |
Coriant GmbH & Co. KG
� |
Q14/15
� |
2014-03-11 |
|
[ 764 ]
�
� |
G.vdsl: New 998ADE17 Band Plan for VDSL2
�
� |
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q4/15
� |
2014-03-11 |
|
[ 763 ]
�
� |
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2
�
� |
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q4/15
� |
2014-03-11 |
|
[ 762 ]
�
� |
G.fast: On TIGA and SRA
�
� |
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q4/15
� |
2014-03-11 |
|
[ 761 ]
�
� |
Proposed model for the OTUCn and OTSi layers for OTN beyond 100G
�
� |
ZTE Corporation
� |
Q12/15, Q11/15
� |
2014-03-11 |
|
[ 760 ]
�
� |
Considerations on the timing of the OTN B100G amendment for G.709
�
� |
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q12/15, Q11/15
� |
2014-03-11 |
|
[ 759 ]
�
� |
Access budget within E2E Time/phase HRM
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q13/15
� |
2014-03-11 |
|
[ 758 ]
�
� |
Prysmian Group view on revision of Recs. G.652 and G.657
�
� |
Prysmian SpA
� |
Q6/15, Q5/15
� |
2014-03-11 |
|
[ 757 ]
�
� |
Updated draft of recommendation for "Field Mountable optical fibre Connector"
�
� |
Telecom Italia S.p.A.
,
Tyco Electronics Raychem bvba
� |
Q7/15
� |
2014-03-11 |
|
[ 756 ]
�
� |
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"
�
� |
Italy
� |
Q4/15, Q16/15
� |
2014-03-11 |
|
[ 755 ]
�
� |
Simplified analytical approach for modelling of WDM Systems to be considered as the way forward to develop a specification method for Situation 2 in G.680
�
� |
Italy
� |
Q6/15
� |
2014-03-11 |
|
[ 754 ]
�
� |
Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2014-03-11 |
|
[ 753 ]
�
� |
Isolation specifications for G.984.5 Revised
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-03-11 |
|
[ 752 ]
�
� |
Discussion of transfer time and DRNI for G.mdsp
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2014-03-11 |
|
[ 751 ]
�
� |
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 750 ]
�
(Rev.1)� |
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 749 ]
�
� |
G.fast: Data rate impact and requirements of Reverse Power Feeding systems
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 748 ]
�
� |
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 747 ]
�
� |
Information on Upcoming New Work on B100G OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 746 ]
�
� |
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2014-03-11 |
|
[ 745 ]
�
� |
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 744 ]
�
� |
Proposal for seeded DWDM system with support for tunable channels
�
� |
Deutsche Telekom AG
,
Transmode Systems AB
� |
Q6/15
� |
2014-03-11 |
|
[ 743 ]
�
� |
Co-existence of seeded technology and tunable transmitters
�
� |
Deutsche Telekom AG
,
Transmode Systems AB
� |
Q6/15
� |
2014-03-11 |
|
[ 742 ]
�
� |
Efficient mapping of CPRI over ODUflex
�
� |
FiberHome Technologies Group
,
IP Light
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q11/15
� |
2014-03-11 |
|
[ 741 ]
�
� |
Comments on latest G.MDSP Living List
�
� |
Alcatel-Lucent France
� |
Q9/15
� |
2014-03-11 |
|
[ 740 ]
�
� |
Comments on latest G.MDSP draft
�
� |
Alcatel-Lucent France
� |
Q9/15
� |
2014-03-11 |
|
[ 739 ]
�
(Rev.1)� |
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q2/15
� |
2014-03-11 |
|
[ 738 ]
�
� |
Proposal for Interoperation ability for ODU SMP
�
� |
China Mobile Communications Corporation
� |
Q9/15
� |
2014-03-11 |
|
[ 737 ]
�
� |
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 736 ]
�
� |
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 735 ]
�
� |
Proposal on Synchronization OAM in packet networks
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q10/15
� |
2014-03-11 |
|
[ 734 ]
�
� |
Proposal for clockClass definition
�
� |
China
� |
Q13/15
� |
2014-03-11 |
|
[ 733 ]
�
� |
SDN requirements in carrier's transport networks
�
� |
China Mobile Communications Corporation
� |
Q12/15
� |
2014-03-11 |
|
[ 732 ]
�
� |
Discussions of Proposed draft text for G.8131
�
� |
China Mobile Communications Corporation
� |
Q9/15
� |
2014-03-11 |
|
[ 731 ]
�
� |
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 730 ]
�
� |
C&I pilot project for Synchronous Ethernet technology
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 729 ]
�
� |
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 728 ]
�
� |
Guidance on the usage of the methods for PDV tolerance testing in G.8263
�
� |
Iometrix, Inc.
,
Orange
� |
Q13/15
� |
2014-03-11 |
Resultados :337 documentos Resultados :�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):