Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2013-07-01�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2013-07-01)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reuni�n� del 2013-07-01 al 2013-07-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Resultados :87 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�AI/Cuesti�n:�Q13/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 440 ]
clockClass usage in G.8275.1 � Orange Q13/15 2013-06-19
[ 425 ]
Priority1 parameter and Domain number in G.8275.1 � Nokia Siemens Networks GmbH & Co. KG Q13/15 2013-06-18
[ 424 ]
G.8261.1: PDV Network Limit � Nokia Siemens Networks GmbH & Co. KG Q13/15 2013-06-18
[ 423 ]
Clock classes and selection algorithm in G.8275.1 � Nokia Siemens Networks GmbH & Co. KG Q13/15 2013-06-18
[ 412 ]
Way forward on PDV network limits in G.8261.1 � Orange Q13/15 2013-06-18
[ 411 ]
Updated text for the new Appendix "Evaluation of the Packet Delay Variation generation and asymmetry in a network node" in G.8261.1 � Orange Q13/15 2013-06-18
[ 409 ]
PTP attributes values in G.8275.1 � Orange Q13/15 2013-06-18
[ 408 ]
Text for Annex A of G.8275.1 � Orange Q13/15 2013-06-18
[ 407 ]
Phase/time network limits in G.8271.1 � Orange Q13/15 2013-06-18
[ 382 ]
FPP metric informal correspondence - Summary, further results and proposal for Study Point 3 � Calnex Solutions Limited , RAD Data Communications, Ltd. Q13/15 2013-06-18
[ 381 ]
FPP metric informal correspondence - Summary and proposal for Study Point 1 � Calnex Solutions Limited , RAD Data Communications, Ltd. Q13/15 2013-06-18
[ 380 ]
FPP metric informal correspondence - Summary and proposal on the Agreements � Calnex Solutions Limited , RAD Data Communications, Ltd. Q13/15 2013-06-18
[ 361 ]
Complementary data for reroute detection mechanisms � ADVA Optical Networking Q13/15 2013-06-18
[ 360 ]
Signalling TLV for distribution of timing information � ADVA Optical Networking Q13/15 2013-06-18
[ 359 ]
Self Monitoring Synchronization Network Comprised Of Probing Master/BC Nodes � ADVA Optical Networking Q13/15 2013-06-18
[ 358 ]
Concerns about Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I � ADVA Optical Networking Q13/15 2013-06-18
[ 357 ]
Alternative Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I � ADVA Optical Networking Q13/15 2013-06-18
[ 355 ]
Method for estimation Gamma distribution parameters based on FPP and Maximal Delay. � ADVA Optical Networking Q13/15 2013-06-18
[ 329 ]
Proposed amendment material for G.8251 on OTU3.4 jitter � PMC-Sierra, Inc. Q13/15 2013-06-18
[ 325 ]
Text for Annex B of G.8273 � Ixia Q13/15 2013-06-18
[ 322 ]
Summary Text for G.8273 Annex A: Clause A.1 � Ixia Q13/15 2013-06-18
[ 321 ]
Summary Text for G.8273 Annex A: Clause A.2 through A.5 � Ixia Q13/15 2013-06-18
[ 316 ]
Text for Annex A of G.8273 section A.1.2 � Ixia Q13/15 2013-06-18
[ 315 ]
Text for Annex A of G.8273 section A.1.x � Ixia Q13/15 2013-06-18
[ 314 ]
Text for Annex A of G.8273 section A.1 � Ixia Q13/15 2013-06-18
[ 313 ]
Further discussion regarding definition of "floor" in time-transfer application � Ixia , Symmetricom Q13/15 2013-06-18
[ 312 ]
Discussion regarding definition of "floor" in time-transfer application � Ixia , Symmetricom Q13/15 2013-06-18
[ 311 ]
Analysis of Cluster-width and packet-selection window interaction � Ixia Q13/15 2013-06-18
[ 310 ]
Normal operation of telecom-grade network elements for supporting packet-based timing � Ixia Q13/15 2013-06-18
[ 309 ]
Figures for measurement of combined (PRTC+T-GM) � Ixia Q13/15 2013-06-18
[ 308 ]
Network Limit at Reference points C and D in G.8271.1 � Ixia Q13/15 2013-06-18
[ 302 ]
G.8275.1: Clarification on the contents of Announce Messages � Juniper Networks Q13/15 2013-06-17
[ 301 ]
G.8273.2: Packet Selection for T-BCs and T-TSCs for PTP Time/Phase Profiles � Juniper Networks Q13/15 2013-06-17
[ 296 ]
Revision of network limits in G.8271.1 � Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Telefon AB - LM Ericsson Q13/15 2013-06-17
[ 295 ]
(Rev.1)
Mitigation of time error due to SyncE transients in G.8273.2 � Telefon AB - LM Ericsson Q13/15 2013-06-17
[ 294 ]
Coexistence of different profiles in G.8275 � Telefon AB - LM Ericsson Q13/15 2013-06-17
[ 284 ]
(Rev.1)
Q13/15 Synchronization Requirements Structure � Deutsche Telekom AG Q13/15 2013-06-17
[ 275 ]
Re-arrangement times for G.8271.1 HRM topologies � Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 274 ]
Development of Slave Clock Specifications for Different Use Cases � Sprint Q13/15 2013-06-17
[ 272 ]
(Rev.1)
Service Requirements for Manageable Synchronization Infrastructure � Alcatel-Lucent USA Inc. , Sprint Q13/15 2013-06-17
[ 259 ]
G.8271.1 Appendix VI modifications for cTE classes [G.8271.1] � Vitesse Semiconductor Corporation Q13/15 2013-06-17
[ 258 ]
PTP Equipment Classification [G.8273.2, G.8273, G.8271.1] � Cisco Systems, Inc. , Vitesse Semiconductor Corporation Q13/15 2013-06-17
[ 253 ]
Static noise generation of G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 252 ]
Delay_Req Transmission Requirements in G.8275.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 251 ]
Proposals for G.8275.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 250 ]
Proposal for default value for offsetScaledLogVariance, for G.8275.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 249 ]
Discussion of Noise Tolerance in G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 248 ]
Proposal for Time Noise Transfer in G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 247 ]
Proposed Text for Method 3 of G.8263-Testing � Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange Q13/15 2013-06-17
[ 246 ]
Proposed Correction to Annex C of ITU-T Rec. O.172 � Huawei Technologies Co. Ltd. Q13/15 2013-06-17
Resultados :87 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11