Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 11 : WP 1,2,3,4/11�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 11� C�(2013-11-07)�

UIT-T�SG 11

Protocols and test specifications

Periodo de estudios 2013

Reuni�n� del 2013-11-07 al 2013-11-20

Lugar : Uganda [Kampala]

Otras reuniones : 2016-06-272016-04-292016-03-242015-12-022015-04-222014-11-212014-07-092014-02-212013-11-142013-06-212013-02-25

Resultados :52 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 102 ]
Proposal to open a dialog regard the HomeGrid Forum C&I Programme and testing against ITU-T Recommendations G.hn series � Marvell Semiconductor Inc. Q11/11 2013-11-01
[ 101 ]
ETSI approach of IMS NNI Testing ETSI TS 186 011-2 IMS NNI Interoperability Test Specifications; Part 2: Test description for IMS NNI Interoperability � A1 Telekom Austria AG Q11/11 2013-10-30
[ 100 ]
ETSI approach of IMS NNI Testing ETSI TS 186 011-1 IMS NNI Interoperability Test Specifications; Part 1: Test purposes for IMS NNI Interoperability � A1 Telekom Austria AG Q11/11 2013-10-30
[ 99 ]
Proposals to advance in "Q.QMS" work item � Universidad Del Pa�s Vasco Q11/11, Q10/11 2013-10-30
[ 98 ]
Proposal to establish a new work item Q.test_app "ITU-T's general approaches of testing of ICT products" � Administration of Russia Q11/11 2013-10-29
[ 97 ]
Proposal to establish an ITU recognition procedure of testing laboratories with competence in ITU-T Recommendations � Administration of Russia Q11/11 2013-10-29
[ 96 ]
Draft recommendation Q.Int_speed_test "Unified methodology of Internet speed quality measurement usable by end-users on the fixed and mobile networks " � Administration of Russia Q15/11 2013-10-29
[ 95 ]
IMEI numbers and Counterfeit Mobile Devices � United Kingdom Q8/11 2013-10-28
[ 94 ]
Role and Scope of the GSMA IMEI Allocation System � GSM Association Q8/11 2013-10-25
[ 93 ]
(Rev.1)
Proposed text about Section 8 Use of the Diameter base protocol on Q.nacp.Nc � Korea (Rep. of) Q7/11 2013-10-25
[ 92 ]
(Rev.1)
X.mp2p-arch: Proposed of Information flow for content distribution control � Korea (Rep. of) Q9/11 2013-10-25
[ 91 ]
(Rev.1)
Addition to the Draft Handbook on Counterfeit Equipment � Ukraine Q8/11 2013-10-25
[ 90 ]
Proposal to update draft Q.IPFAX-testing � NEC Corporation , OKI Electric Industry Company Ltd. (OKI) Q10/11 2013-10-25
[ 89 ]
Proposal to update draft Q.OIP/OIR � NEC Corporation Q2/11 2013-10-25
[ 88 ]
Proposal to update Q.TR-CCI � NEC Corporation Q14/11 2013-10-25
[ 87 ]
(Rev.1)
Report of the NGN testing and showcasing during APT/ITU Conformance and Interoperability event and proposal � NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , OKI Electric Industry Company Ltd. (OKI) Q8/11, Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11 2013-10-25
[ 86 ]
(Rev.1)
Recovery procedure proposal in Q.CSO � Huawei Technologies Co. Ltd. Q4/11 2013-10-25
[ 85 ]
(Rev.1)
Editorial proposal for Q.CSO � Huawei Technologies Co. Ltd. Q4/11 2013-10-25
[ 84 ]
+Add.1
Proposal to start a new work item on ITU-T M.3170 series of Recommendations conformance testing pilot project � Beijing University of Posts and Telecommunications Q11/11 2013-10-25
[ 83 ]
(Rev.1)
Proposed Text for New Work Item "MP2P protocols: Peer Activity Management Protocol (PAMP)" for Nov. 2013 meeting � Electronics and Telecommunications Research Institute (ETRI) Q9/11 2013-10-23
[ 82 ]
(Rev.1)
"Reference load profiles and background traffic load" (Q.39zz-1) Output draft from STQ#44; TS 103 222 V 0.0.5 "Reference benchmarking and background traffic profiles" � A1 Telekom Austria AG Q10/11 2013-10-23
[ 81 ]
Proposed Requirements and Capabilities of Q.rrp "Request routing protocol for content delivery" � Electronics and Telecommunications Research Institute (ETRI) Q9/11 2013-10-23
[ 80 ]
Proposed Update of Q.rrp "Request routing protocol for content delivery" � Electronics and Telecommunications Research Institute (ETRI) Q9/11 2013-10-23
[ 79 ]
(Rev.1)
Proposal of initiating a new Recommendation on Signalling Architecture and requirement for IP based Short Message Service � Ministry of Industry and Information Technology (MIIT) Q2/11, Q1/11 2013-10-23
[ 78 ]
Unassigned �
This Contribution was withdrawn because it was registered twice by mistake.
N/A N/A 2013-10-23
[ 77 ]
(Rev.1)
Propose to add the scenarios for BNG's event and status notification to the service platform � Ministry of Industry and Information Technology (MIIT) Q5/11 2013-10-23
[ 76 ]
(Rev.1)
Proposed text about message specification on Q.nacp.Nc � Electronics and Telecommunications Research Institute (ETRI) Q7/11 2013-10-23
[ 75 ]
Proposal to update draft Q.monitor_d section 6.4 in relation to " Battery parameters" � China Telecommunications Corporation Q13/11 2013-10-22
[ 74 ]
Proposal to update draft Q.monitor_d section 6.1 in relation to "Anomalies behaviour and event paramters" of device monitoring � China Telecommunications Corporation Q13/11 2013-10-22
[ 73 ]
Proposal to update draft Q.FW-Cloud-iop including "Cloud service measurement index" � China Telecommunications Corporation , Ministry of Public Infrastructure, Industries & Commerce Q14/11 2013-10-22
[ 72 ]
Proposal to update draft Q.TR-CCI by adding SPEC and VMware as testing activities � China Telecommunications Corporation Q14/11 2013-10-22
[ 71 ]
(Rev.1)
Consideration of Managed & Distributed Server based A/V Conf. Service � Electronics and Telecommunications Research Institute (ETRI) Q9/11 2013-10-22
[ 70 ]
(Rev.1)
Proposal for scenario and requirements on the orchestration function based on the cloud services � Beijing University of Posts and Telecommunications , China Unicom , Huawei Technologies Co. Ltd. Q4/11 2013-10-21
[ 69 ]
(Rev.1)
Proposal for modification and comments of sub-clause 9.3 of Q.Supplement-SDN � Beijing University of Posts and Telecommunications , China Unicom , Huawei Technologies Co. Ltd. Q4/11 2013-10-21
[ 68 ]
(Rev.1)
Proposal for scenario and requirements on East-West interface � Beijing University of Posts and Telecommunications , China Unicom , Huawei Technologies Co. Ltd. Q4/11 2013-10-21
[ 67 ]
Consideration on signalling requirements of control policy distribution related to service/user awareness and control in Q.SBNG � China Unicom , Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 66 ]
Consideration on signalling requirements of user information report related to service/user awareness and control in Q.SBNG � China Unicom , Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 65 ]
Consideration on signalling requirements of service/user awareness and control in Q.SBNG � China Unicom , Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 64 ]
Propose to add an Annex B to cover the scenarios and requirements of network services' configuration to the BNG to Q.SBNG � Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 63 ]
Propose to add Annex C to cover the scenarios and requirements of BNG's event and status notification to the service platform � Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 62 ]
Propose to add the scenarios and requirements for Services' configuration on BNG � China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 61 ]
Propose to add the scenarios for Service route path, service combination for the Q.SBNG � China , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. Q5/11 2013-10-21
[ 60 ]
(Rev.1)
Proposed signalling scenarios in Q.IPv6UIP �
The original file [C-60] was removed as it was wrongly posted. [C-60 Rev.1] provides the correct submitted contribution.
Huawei Technologies Co. Ltd. Q6/11 2013-10-21
[ 59 ]
Proposed signalling requirements in Q.IPv6UIP � Huawei Technologies Co. Ltd. Q6/11 2013-10-21
[ 58 ]
Propose to add the scenarios of PTN in Q.SBAN � China Mobile , Huawei Q4/11 2013-10-15
[ 57 ]
(Rev.1)
Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 3: User side; Test Suite Structure and Test Purposes (TSS&TP) [candidate Q.3942.3 ' in the work programme it is wrongly identified as Q.3942.4] � A1 Telekom Austria AG , Deutsche Telekom AG Q11/11 2013-10-12
[ 56 ]
(Rev.1)
Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 2: Network side ; Test Suite Structure and Test Purposes (TSS&TP) [candidate Q.3942.2] � A1 Telekom Austria AG , Deutsche Telekom AG Q11/11 2013-10-12
[ 55 ]
(Rev.1)
"Reference load profiles and background traffic load" (Q.39zz) � A1 Telekom Austria AG Q10/11 2013-10-10
[ 54 ]
(Rev.1)
Draft technical report on counterfeiting � Ukrainian National Information Systems Q8/11 2013-10-07
[ 53 ]
(Rev.1)
Proposal for an IMEI Global System for combating the trade in counterfeit mobile devices � Ukrainian National Information Systems Q8/11 2013-10-04
Resultados :52 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-10