Contribuciones
�[�Origen:�Ericsson�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2386 ]
�
� |
10 G signal transmission in seeded DWDM system
�
� |
LG-Ericsson
� |
Q6/15
� |
2012-08-29 |
|
[ 2385 ]
�
� |
Comparison of proposed low cost DWDM system
�
� |
LG-Ericsson
� |
Q6/15
� |
2012-08-29 |
|
[ 2355 ]
�
� |
G.fast: Low Complexity FFT/IFFT Scheme
�
� |
Telefon AB - LM Ericsson
� |
Q4A/15
� |
2012-08-28 |
|
[ 2354 ]
�
� |
G.fast: New cable model for wiring type B05a, CAD55
�
� |
Telefon AB - LM Ericsson
� |
Q4A/15
� |
2012-08-28 |
|
[ 2352 ]
�
� |
G.fast: Updated measurements and modelling of CAD55 cable
�
� |
Telefon AB - LM Ericsson
� |
Q4A/15
� |
2012-08-28 |
|
[ 2334 ]
�
(Rev.1)� |
Proposal for inclusion of PtP WDM use cases in G.ngpon2.1
�
� |
ADVA Optical Networking
,
Ericsson, Inc.
,
France T�l�com Orange
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2012-08-28 |
|
[ 2327 ]
�
� |
A proposal to modification of G.709 to add OTU0 frame
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
� |
Q11/15
� |
2012-08-28 |
|
[ 2269 ]
�
� |
Considerations re Multipoint Ethernet Connection Protection New Work Item
�
� |
ADVA Optical Networking
,
AimValley BV
,
Alcatel-Lucent USA Inc.
,
Ciena Corporation
,
Cisco Systems, Inc.
,
Ericsson, Inc.
� |
Q9/15
� |
2012-08-28 |
|
[ 2249 ]
�
� |
A proposal of other alternative OTUkV frame structures for low latency transport
�
� |
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
� |
Q11/15
� |
2012-08-28 |
|
[ 2216 ]
�
� |
Proposal to add OTU0 frame in G.709/Y.1331
�
� |
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
� |
Q11/15
� |
2012-08-28 |
|
[ 2184 ]
�
� |
G.874.1 UML Model
�
� |
Ericsson, Inc.
� |
Q14/15
� |
2012-08-27 |
|
[ 2175 ]
�
� |
Proposal to add ring architecture in G.698.3
�
� |
LG-Ericsson
� |
Q6/15
� |
2012-08-27 |
|
[ 2174 ]
�
� |
RIN for 2.5 Gbps application in G.698.3
�
� |
LG-Ericsson
� |
Q6/15
� |
2012-08-27 |
|
[ 2121 ]
�
(Rev.1)� |
Proposal of seed signal input power parameters for NRZ 2.5 G application code
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
� |
Q6/15
� |
2012-08-27 |
|
[ 2014 ]
�
(Rev.1)� |
Considerations on Time Sync holdover and rearrangements
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2012-08-24 |
|
[ 2010 ]
�
(Rev.1)� |
Proposed revision of G.698.1 to include low-cost bi-directional WDM-systems
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Electronics and Telecommunications Research Institute (ETRI)
,
Gemfire Europe Limited
,
LG-Ericsson
,
Nokia Siemens Networks GmbH & Co. KG
,
Oclaro Technology plc
� |
Q6/15
� |
2012-08-24 |
|
[ 2004 ]
�
(Rev.1)� |
Considerations on Time sync Limits in G.8271.1
�
� |
Calnex Solutions Limited
,
Telefon AB - LM Ericsson
� |
Q13/15
� |
2012-08-23 |
|
[ 2003 ]
�
(Rev.1)� |
Multicast address in the G.8275.1 profile
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2012-08-23 |
|
[ 2002 ]
�
(Rev.1)� |
Considerations on the constant asymmetry in the G.8271.1 network reference model
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2012-08-23 |
|
[ 1994 ]
�
(Rev.1)� |
EEC with enhanced Holdover
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2012-08-23 |
|
[ 1978 ]
�
� |
Comments on G.8032 Supplement
�
� |
Ericsson Canada, Inc.
� |
Q9/15
� |
2012-08-22 |
|
[ 1977 ]
�
� |
Comments on IEEE liaison on MECP
�
� |
Ericsson Canada, Inc.
� |
Q9/15
� |
2012-08-22 |
|
[ 1962 ]
�
� |
Flexible high speed interfaces
�
� |
Ericsson UK
� |
Q11/15
� |
2012-08-16 |
|
[ 1961 ]
�
� |
Traffic Differentiation in Transport Networks
�
� |
Ericsson UK
� |
Q9/15, Q12/15
� |
2012-08-16 |
|
[ 1960 ]
�
� |
Self Configuring Networks
�
� |
Ericsson UK
� |
Q9/15
� |
2012-08-16 |
|
[ 1959 ]
�
(Rev.1)� |
Bandwidth- Load sharing
�
� |
Ericsson UK
� |
Q9/15
� |
2012-08-16 |
|
[ 1953 ]
�
� |
Introducing the concept of security in G.697
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2012-08-10 |
|
[ 1952 ]
�
� |
Considerations about security at the optical layer
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2012-08-10 |
|
[ 1929 ]
�
� |
Freq Grid and Index contrast for OD/OM filters
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
� |
Q6/15
� |
2011-11-23 |
|
[ 1873 ]
�
(Rev.1)� |
G.fast: Proposal to create an annex for mobile backhaul application
�
� |
Telefon AB - LM Ericsson
� |
Q4/15
� |
2011-11-22 |
|
[ 1869 ]
�
(Rev.1)� |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
�
� |
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
� |
Q6/15, Q2/15, Q12/15, Q11/15
� |
2011-11-22 |
|
[ 1861 ]
�
� |
Withdrawn, duplicate - Superseded by C-1929
�
Withdrawn
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
� |
Q6/15
� |
2011-11-22 |
|
[ 1852 ]
�
� |
Withdrawn
�
Withdrawn
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
� |
Q6/15
� |
2011-11-22 |
|
[ 1813 ]
�
(Rev.1)� |
Protection Switching Interwoirking
�
� |
Ericsson UK
,
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1739 ]
�
(Rev.1)� |
Guidelines for interworking Protection schemes
�
� |
Ericsson UK
� |
Q9/15
� |
2011-11-22 |
|
[ 1712 ]
�
(Rev.1)� |
G.8131 Single Document
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
Q9/15
� |
2011-11-21 |
|
[ 1709 ]
�
(Rev.1)� |
Updated text for G.8131/Y.1382
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
Q9/15
� |
2011-11-21 |
|
[ 1639 ]
�
� |
Withdrawn: Proposal to add new application codes in G.sdapp
�
Withdrawn
� |
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
� |
Q6/15
� |
2011-11-21 |
|
[ 1623 ]
�
� |
Elaboration on G.8110.1 AAP Comment Regarding Uniform Model Text
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Extreme Networks
� |
Q9/15, Q12/15
� |
2011-11-20 |
|
[ 1596 ]
�
(Rev.1)� |
PDV network limit in G.8261.1
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1595 ]
�
(Rev.1-2)� |
Intra-site Time Sync Requirements in G.8271
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1591 ]
�
(Rev.1-3)� |
EEC with enhanced Holdover
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1589 ]
�
(Rev.1)� |
Noise Generation in G.8263
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1587 ]
�
(Rev.1)� |
Proposal for text concerning packet selection in G.8260
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1586 ]
�
(Rev.1)� |
Discussion on reference points and network limits in G.8271
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1583 ]
�
(Rev.1)� |
Proposal for network limits in G.8271
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1568 ]
�
� |
Proposal and Comments on MPLS-TP
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
� |
2011-11-18 |
|
[ 1567 ]
�
� |
Principle of Cooperation and Lines of Responsibility
�
� |
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
QALL/15
� |
2011-11-18 |
|
[ 1566 ]
�
� |
Proposed text for G.8121.2 for Performance Monitoring processes
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2011-11-18 |
|
[ 1565 ]
�
� |
Proposed text for G.8121.2 for Lock Instruct and Loopback processes
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2011-11-18 |
Resultados :140 documentos Resultados :�
1 -
2 -
3
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):