Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Resultados :39 documentos
Contribuciones �[�Origen:�CATR�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1249 ]
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile � CATR , China Mobile Q10/15 2011-01-31
[ 1248 ]
PTN GACh+Y.1731 OAM interoperability test activities and result � CATR , China Mobile Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1235 ]
Proposal on maximum PTP clock number in the time reference model � CMCC , CATR , ZTE Q13/15 2011-01-31
[ 1234 ]
TOD specification � CMCC , CATR , Huawei , ZTE Q13/15 2011-01-31
[ 1124 ]
Structure and content of the MPLS-TP Recommendations � CMCC,CT , CATR Q9/15, Q14/15, Q12/15, Q10/15 2011-01-28
[ 1123 ]
Associated Channel Type for G.tpoam � CMCC, CT,CATR Q9/15, Q14/15, Q12/15, Q10/15 2011-01-28
[ 1090 ]
SD triggered protection switching in G.8031 � CATR , Huawei Q9/15 2010-05-21
[ 1070 ]
1588v2 transmission by OSC over OTN � FiberHome , CATR , ZTE Q13/15, Q11/15 2010-05-21
[ 1067 ]
GPS timing receiver characterization � Symmetricom , CATR , CMCC Q13/15, Q11/15 2010-05-21
[ 1066 ]
Analysis of time synchronization performance using PTP in hybrid transport network � CMCC , CATR , ZTE Q13/15, Q11/15 2010-05-21
[ 1065 ]
Proposal of accelerating MTIE and TDEV mask study for time synchronization � CMCC , CATR , Huawei , ZTE Q13/15 2010-05-21
[ 1064 ]
Proposal of research on link asymmetry compensation for PTP � CMCC, ZTE, CATR Q13/15 2010-05-21
[ 1062 ]
Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth � CATR Q15/15 2010-05-21
[ 1061 ]
Proposal of revising for SSM message delay description in G.8264 � CATR Q13/15 2010-05-21
[ 1060 ]
Objectives and Requirements for G.827x Recommendations � CATR , Huawei Q13/15 2010-05-21
[ 1059 ]
Functionality proposals about MPLS-TP OAM toolsets in G.tpoam � CATR Q10/15 2010-05-21
[ 1057 ]
Some consideration with 40G intra-office interface parameters � CATR Q6/15 2010-05-21
[ 1056 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39 � CATR , Huawei Q6/15 2010-05-21
[ 1055 ]
40G application code for G.698.2 � CATR Q6/15 2010-05-21
[ 1048 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39 � CATR Q6/15 2010-05-22
[ 1041 ]
Issues about metrics of network limits for time synchronization � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1040 ]
Field test of 1588v2 time sync based on physical layer frequency sync support � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1037 ]
1588v2 test results with different clock mode and field network � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 904 ]
G.827x Recommendations - High-Level Objectives � Huawei , CATR , MII Q13/15 2010-05-18
[ 903 ]
Pulse-Per-Second Interface � Huawei , CATR , China Mobile Communications Corporation , MII Q13/15 2010-05-18
[ 823 ]
Propose to add an appendix to describe EVPRM solution to G.8011.4 � Alcatel Lucent Shanghai Bell , CATR , Ministry of Information Industry of P.R. of China Q10/15 2010-05-17
[ 685 ]
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates � Huawei Technologies , CATR , MII Q13/15 2009-09-20
[ 565 ]
Proposal for the unit of Synchronous Ethernet jitter � CATR Q15/15 2009-09-18
[ 564 ]
Proposal for Synchronous Ethernet interfaces � CATR Q15/15 2009-09-18
[ 560 ]
Proposals about MPLS-TP Performance OAM - Delay measurement � CATR , China Mobile Communications Corp , MIIT Q10/15 2009-09-18
[ 559 ]
Proposals about MPLS-TP and Ethernet Protection Support Signal Degrade � CATR , China Mobile Communications Corp , MIIT Q9/15, Q10/15 2009-09-18
[ 472 ]
Requirement of Embedded Latency Measurement in OTN Networks � China Telecom , CATR , China Unicom , CMCC Q11/15 2009-09-16
[ 454 ]
Proposal to study Shared Mesh Protection � Huawei Technologies , CATR , MII Q9/15 2009-09-16
[ 394 ]
Rooted mp FDFr � Alcatel Shanghai Bell , CATR , MII Q12/15 2009-09-14
[ 296 ]
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265 � ZTE Corporation, CATR MII Q13/15 2008-11-23
[ 227 ]
Some Considerations and Proposals about T-MPLS and MPLS-TP Standardization � CATR, MII China, CMCC Q12/15 2008-11-21
[ 223 ]
Fiber nonlinearity effects consideration based on the phase modulated line code (modulation format) in the ITU-T Recommendation G.sup39 � CATR, MII China Q6/15 2008-11-21
[ 221 ]
Proposal on ODU3y supporting a mix of LO ODU signal types � China Telecom, CATR, MII China Q11/15 2008-11-21
[ 218 ]
Add path OSNR penalty term in the ITU-T Recommendation G.sup39 � CATR, MII, China Q6/15 2008-11-21
Resultados :39 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11