Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Resultados :78 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�Origen:�AT�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 2053 ]
(Rev.1)
Development of a new PTP Profile for Time/Phase Distribution � AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation Q13/15 2012-08-24
[ 2045 ]
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes � AT&T, Inc. , Ciena Corporation Q9/15, Q14/15, Q13/15, Q11/15 2012-08-24
[ 2032 ]
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc. Q4A/15 2012-08-24
[ 1723 ]
(Rev.1)
Request for evaluation of OTN support for CPRI � AT&T, Inc. Q13/15 2011-11-21
[ 1722 ]
(Rev.1)
G.798 PT Interworking Smart? � AT&T, Inc. Q9/15 2011-11-21
[ 1697 ]
(Rev.1)
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc. , France T�l�com Orange , Telecom Italia S.p.A. Q4/15 2011-11-21
[ 1567 ]
Principle of Cooperation and Lines of Responsibility � AT&T, Inc. , Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation QALL/15 2011-11-18
[ 1329 ]
Rationale for support of 1SL in Y.1731 and G.8021 � AT&T , Verizon Q9/15, Q10/15 2011-02-01
[ 1308 ]
Reporting of results for pro-active measurement using SLM � Cisco , AT&T Q9/15 2011-02-01
[ 1305 ]
Procedural issues on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-02-01
[ 1303 ]
Inter SDO Cooperation on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5 2011-02-01
[ 1300 ]
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021 � Verizon , AT&T Q9/15, Q10/15 2011-02-01
[ 1290 ]
Reporting of results for pro-active measurement using SLM � Cisco , AT&T Q9/15 2011-02-01
[ 1249 ]
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile � CATR , China Mobile Q10/15 2011-01-31
[ 1248 ]
PTN GACh+Y.1731 OAM interoperability test activities and result � CATR , China Mobile Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1235 ]
Proposal on maximum PTP clock number in the time reference model � CMCC , CATR , ZTE Q13/15 2011-01-31
[ 1234 ]
TOD specification � CMCC , CATR , Huawei , ZTE Q13/15 2011-01-31
[ 1157 ]
G.ploam: Proposed Text for Upstream Xlog Test Parameter � ASSIA , AT&T Q4/15 2011-01-31
[ 1156 ]
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector � ASSIA , AT&T Q4/15 2011-01-31
[ 1155 ]
G.hnem: G.hnem management � ASSIA , AT&T , Aware , Maxim Integrated Product , Texas Instruments Q4/15 2011-01-31
[ 1154 ]
G.Gen, G.hx, G.cx: G.hn and G.cx management � ASSIA , AT&T , Aware , Marvell Semiconductor Q4/15 2011-01-31
[ 1153 ]
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2 � ASSIA , AT&T Q4/15 2011-01-31
[ 1152 ]
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses � ASSIA , AT&T Q4/15 2011-01-31
[ 1148 ]
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications" � AT&T Q4/15 2011-01-30
[ 1127 ]
(Rev.1)
Proposal to define IPv6 host config ME in G.988 � Ericsson, AT&T, Alcatel-Lucent Q2/15 2011-01-28
[ 1124 ]
Structure and content of the MPLS-TP Recommendations � CMCC,CT , CATR Q9/15, Q14/15, Q12/15, Q10/15 2011-01-28
[ 1123 ]
Associated Channel Type for G.tpoam � CMCC, CT,CATR Q9/15, Q14/15, Q12/15, Q10/15 2011-01-28
[ 1090 ]
SD triggered protection switching in G.8031 � CATR , Huawei Q9/15 2010-05-21
[ 1070 ]
1588v2 transmission by OSC over OTN � FiberHome , CATR , ZTE Q13/15, Q11/15 2010-05-21
[ 1067 ]
GPS timing receiver characterization � Symmetricom , CATR , CMCC Q13/15, Q11/15 2010-05-21
[ 1066 ]
Analysis of time synchronization performance using PTP in hybrid transport network � CMCC , CATR , ZTE Q13/15, Q11/15 2010-05-21
[ 1065 ]
Proposal of accelerating MTIE and TDEV mask study for time synchronization � CMCC , CATR , Huawei , ZTE Q13/15 2010-05-21
[ 1064 ]
Proposal of research on link asymmetry compensation for PTP � CMCC, ZTE, CATR Q13/15 2010-05-21
[ 1062 ]
Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth � CATR Q15/15 2010-05-21
[ 1061 ]
Proposal of revising for SSM message delay description in G.8264 � CATR Q13/15 2010-05-21
[ 1060 ]
Objectives and Requirements for G.827x Recommendations � CATR , Huawei Q13/15 2010-05-21
[ 1059 ]
Functionality proposals about MPLS-TP OAM toolsets in G.tpoam � CATR Q10/15 2010-05-21
[ 1057 ]
Some consideration with 40G intra-office interface parameters � CATR Q6/15 2010-05-21
[ 1056 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39 � CATR , Huawei Q6/15 2010-05-21
[ 1055 ]
40G application code for G.698.2 � CATR Q6/15 2010-05-21
[ 1048 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39 � CATR Q6/15 2010-05-22
[ 1041 ]
Issues about metrics of network limits for time synchronization � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1040 ]
Field test of 1588v2 time sync based on physical layer frequency sync support � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1037 ]
1588v2 test results with different clock mode and field network � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1025 ]
Clarification on ODU Multiplexing � AT&T Q13/15, Q12/15 2010-05-20
[ 904 ]
G.827x Recommendations - High-Level Objectives � Huawei , CATR , MII Q13/15 2010-05-18
[ 903 ]
Pulse-Per-Second Interface � Huawei , CATR , China Mobile Communications Corporation , MII Q13/15 2010-05-18
[ 823 ]
Propose to add an appendix to describe EVPRM solution to G.8011.4 � Alcatel Lucent Shanghai Bell , CATR , Ministry of Information Industry of P.R. of China Q10/15 2010-05-17
[ 807 ]
G.hn Management and Diagnostics Specifications � AT&T Q4/15 2010-05-16
[ 806 ]
Proposed ITU-T Rec. on remote management of CPE � AT&T , ASSIA Inc , Qwest , Verizon Q4/15, Q2/15, Q1/15 2010-05-16
Resultados :78 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11