Contribuciones
�[�Origen:�ASSIA�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2071 ]
�
� |
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL: Proposal
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2066 ]
�
� |
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2064 ]
�
(Rev.1)� |
G.vdsl: Proposed Accuracy Target for LATN and SATN
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2059 ]
�
(Rev.1)� |
G.ploam: Parameters for Data Gathering Messaging
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2057 ]
�
� |
G.vdsl: Proposed text for Data Gathering Messaging
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2032 ]
�
� |
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 1697 ]
�
(Rev.1)� |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France T�l�com Orange
,
Telecom Italia S.p.A.
� |
Q4/15
� |
2011-11-21 |
|
[ 1157 ]
�
� |
G.ploam: Proposed Text for Upstream Xlog Test Parameter
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1156 ]
�
� |
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1155 ]
�
� |
G.hnem: G.hnem management
�
� |
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
� |
Q4/15
� |
2011-01-31 |
|
[ 1154 ]
�
� |
G.Gen, G.hx, G.cx: G.hn and G.cx management
�
� |
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
� |
Q4/15
� |
2011-01-31 |
|
[ 1153 ]
�
� |
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1152 ]
�
� |
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1096 ]
�
� |
VDSL: Time of Day and Analog Channel Delay
�
� |
ASSIA
� |
Q4/15
� |
2010-05-24 |
|
[ 806 ]
�
� |
Proposed ITU-T Rec. on remote management of CPE
�
� |
AT&T
,
ASSIA Inc
,
Qwest
,
Verizon
� |
Q4/15, Q2/15, Q1/15
� |
2010-05-16 |
|
[ 388 ]
�
� |
G.vector: Working text proposal for configuration, performance monitoring and test parameters section of G.vector
�
� |
ASSIA, Inc.
� |
Q4/15
� |
2009-09-14 |
|
[ 387 ]
�
� |
G.PLOAM: Working text proposal for new PLOAM parameters related to G.Vector
�
� |
ASSIA, Inc.
� |
Q4/15
� |
2009-09-14 |
|
[ 354 ]
�
� |
G.gen:G.inp:G.ploam: An operator-controllable threshold for leftr defects
�
� |
ASSIA, Inc.
� |
Q4/15
� |
2009-09-08 |
|
[ 353 ]
�
� |
G.gen: G.vector: G.ploam: PLOAM parameters for G.vector transceivers
�
� |
ASSIA, Inc.
� |
Q4/15
� |
2009-09-08 |
|
[ 352 ]
�
� |
IPR: IPR Declaration of ASSIA Inc. with respect to G.Vector
�
� |
ASSIA Inc.
� |
Q4/15
� |
2009-09-08 |
|
[ 351 ]
�
� |
IPR: IPR Declaration of ASSIA Inc. with respect to G.INP
�
� |
ASSIA Inc.
� |
Q4/15
� |
2009-09-08 |
|
[ 30 ]
�
� |
Status of ATIS NIPP-NAI Technical Report on MIMO Crosstalk Channel Model
�
� |
AT&T, Conexant, ASSIA
� |
Q4/15
� |
2008-11-18 |
|
[ 9 ]
�
� |
Proposed G.993.2 Annex A reference to ATIS NIPP TR on Upstream Power Back Off Parameters.
�
� |
AT&T, Conexant, ASSIA Inc.
� |
Q4/15
� |
2008-11-17 |
|
[ 7 ]
�
� |
G.gen: G.vdsl: G.ploam: Self-consistent Parameter Group, proposed working text
�
� |
ASSIA, Inc
� |
Q4/15
� |
2008-11-17 |
|
[ 6 ]
�
� |
G.lt: Comments on the Management Interfaces in Working Text for Annexes A and B of G.LT
�
� |
ASSIA Inc.
� |
Q4/15
� |
2008-11-17 |
Resultados :25 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):