Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2011-02-14�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2011-02-14)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2011-02-14 al 2011-02-25

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultados :83 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�AI/Cuesti�n:�Q13/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1517 ]
Specification of a Pulse per Second (1PPS) interface for Telecom � Huawei Q13/15 2011-02-02
[ 1516 ]
Translation of an IP Multicast address to an Ethernet MAC Multicast address � Huawei Q13/15 2011-02-02
[ 1515 ]
PTP link-local and internetwork IPv4 Multicast addresses for hop-by-hop time transfer � Huawei Q13/15 2011-02-02
[ 1514 ]
Effect of Pdelay or Delay Request/Response Turnaround Time, and Sojourn Time, on Boundary Clock Performance � Huawei Q13/15 2011-02-02
[ 1513 ]
G.8275.1 time-profile: ClockClass attribute discussion � Huawei Q13/15 2011-02-02
[ 1512 ]
Minimum 1PPS requirements and additional requirements � Huawei Q13/15 2011-02-02
[ 1511 ]
Mathematical Description of Boundary Clock Simulation Models for the Case of Frequency Distribution via syncE � Huawei Q13/15 2011-02-02
[ 1510 ]
Comparison of Boundary Clock Simulation Models � Huawei Q13/15 2011-02-02
[ 1509 ]
Additional external 1PPS interface point, and PTP / non-PTP interworking for GPON/DSL � Huawei Q13/15 2011-02-02
[ 1497 ]
Architectural constructs to describe phase/time distribution � Ciena Corporation Q13/15 2011-02-02
[ 1459 ]
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics) � France Telecom , Tellabs Q13/15 2011-02-02
[ 1458 ]
Network PDV accumulation study with "end-to-end" data traffic model � France Telecom Q13/15 2011-02-02
[ 1457 ]
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented � France Telecom Q13/15 2011-02-02
[ 1456 ]
G.8272: comments on PRTC limits proposal � France Telecom Q13/15 2011-02-02
[ 1455 ]
G.8263: testing methodology for the PDV tolerance of a packet slave clock � France Telecom Q13/15 2011-02-02
[ 1454 ]
G.8261.1: Hypothetical Reference Models proposal � France Telecom Q13/15 2011-02-02
[ 1453 ]
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1 � France Telecom Q13/15 2011-02-02
[ 1452 ]
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks � France Telecom Q13/15 2011-02-02
[ 1451 ]
Analysis of phase/time distribution over OTN networks � France Telecom Q9/15, Q13/15, Q11/15 2011-02-02
[ 1450 ]
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization � France Telecom Q13/15 2011-02-02
[ 1446 ]
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP � NTT Q3/15, Q13/15 2011-02-02
[ 1436 ]
Control elements for BMCA in telecom � NSN Q13/15 2011-02-02
[ 1435 ]
MATIE, MTIE, and MAFE graphs into metrics definitions � NSN Q13/15 2011-02-02
[ 1424 ]
Treatment of delay jumps in PDV data � NSN Q13/15 2011-02-02
[ 1418 ]
Dealing with multiple criteria of packet selection � Calnex Solutions Q13/15 2011-02-01
[ 1400 ]
Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network � Ericsson Q13/15 2011-02-01
[ 1391 ]
Synchronisation Budget � BT Q13/15 2011-02-01
[ 1388 ]
Multiple Independent Timing Domains � BT Q13/15 2011-02-01
[ 1386 ]
Comments on G.8260 latest draft and WDedi107 � RAD Data Communications Q13/15 2011-02-01
[ 1358 ]
Mean Delay Offset measurement - A metric to evaluate delay floor stability for ACR systems � LSI Q13/15 2011-02-01
[ 1357 ]
IEEE 1588-2008( + synchronous Ethernet in a time-setting mode of operation � LSI Q13/15 2011-02-01
[ 1356 ]
Time Synchronizing using the selective synchronization method � LSI Q13/15 2011-02-01
[ 1355 ]
Time of Day Interface Performance � Symmetricom , Semtech Q13/15 2011-02-01
[ 1354 ]
Time of Day Interfaces for Equipment Connections � Symmetricom , Semtech Q13/15 2011-02-01
[ 1353 ]
Syntronization of Boundary Clocks � Symmetricom Q13/15 2011-02-01
[ 1352 ]
Discussion of Hypothetical Reference Model for Time Distribution � Symmetricom Q13/15 2011-02-01
[ 1351 ]
Wander Specification for Grand Master Clocks � Symmetricom Q13/15 2011-02-01
[ 1350 ]
Definition of Coherent Time and Frequency � Symmetricom Q13/15 2011-02-01
[ 1349 ]
Metrics Definitions and Usage for G.8260 Appendix � Symmetricon Q13/15 2011-02-01
[ 1342 ]
Transparent Clocks in a hop-by-hop time/phase distribution � Alcatel-Lucent France Q13/15 2011-02-01
[ 1341 ]
Considerations on the use of the IEEE1588 Transparent Clock in the Time Sync Architectures (G.8275) � Ericsson Q13/15 2011-02-01
[ 1340 ]
Time-of-Day distribution across Transport Provider Networks � Alcatel-Lucent France Q13/15 2011-02-01
[ 1337 ]
Discussion on Architecture and BMCA for the Time Sync Telecom Profile (G.8275 and G.8275.1) � Ericsson Q13/15 2011-02-01
[ 1336 ]
Time and Phase Sync Interfaces (G.8271) � Ericsson Q13/15 2011-02-01
[ 1335 ]
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1) � Ericsson Q13/15 2011-02-01
[ 1287 ]
G.987.3: Draft Text for Transparent Clock Mechanism � Adtran , Calix , PMC-Sierra Q2/15, Q13/15 2011-01-31
[ 1286 ]
G.987.1: Draft Text for IEEE 1588 Packet Timing Reference Model � Adtran , Calix , PMC-Sierra Q2/15, Q13/15 2011-01-31
[ 1272 ]
Relevant Clauses for J.211 � Semtech Q13/15 2011-01-31
[ 1267 ]
G.8272 PRTC type approval process proposal � Deutsche Telekom Q13/15 2011-01-31
[ 1266 ]
G.8272 PRTC Options: Temperature � Deutsche Telekom Q13/15 2011-01-31
Resultados :83 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25