Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2011-02-14�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2011-02-14)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2011-02-14 al 2011-02-25

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultados :22 documentos
Contribuciones �[�AI/Cuesti�n:�Q11/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1493 ]
G.hao impact on G.7713 � Ciena Corporation Q14/15, Q11/15 2011-02-02
[ 1490 ]
Considerations on ODUflex and ODUflex resizing � Ciena Corporation Q11/15 2011-02-02
[ 1451 ]
Analysis of phase/time distribution over OTN networks � France Telecom Q9/15, Q13/15, Q11/15 2011-02-02
[ 1420 ]
Functional model of HAO � Huawei Q9/15, Q11/15 2011-02-01
[ 1414 ]
Proposal for addition of HO OPU mapping types in G.709 � ETRI Q11/15 2011-02-01
[ 1413 ]
Proposed modification of G.709 (12/2009) Appendix XII for inclusion in G.709 Amendment 2 � ETRI Q11/15 2011-02-01
[ 1412 ]
Addition of new Appendix/G.7041 for ODUflex(GFP) packet data throughput � ETRI Q11/15 2011-02-01
[ 1401 ]
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN) � NTT Q9/15, Q11/15 2011-02-01
[ 1378 ]
ODUflex(GFP) Recommended Bit Rates � Alcatel-Lucent Q9/15, Q11/15 2011-02-01
[ 1346 ]
Nested Restoration Domains - Data-plane maintenance overhead signals � Tellabs Oy Q9/15, Q12/15, Q11/15 2011-02-01
[ 1319 ]
PCSL error control block insertion and BIP8 transparency for 100GBASE-R/ODU4 � Fujitsu , CIAJ , Hitachi , Mitsubishi , NEC Q9/15, Q11/15 2011-02-01
[ 1305 ]
Procedural issues on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-02-01
[ 1279 ]
Consideration on TS sequence in HAO � ZTE Q14/15, Q12/15, Q11/15 2011-01-31
[ 1277 ]
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO � ZTE Q11/15 2011-01-31
[ 1260 ]
Consideration on OTU5 (400G) � Huawei Q11/15 2011-01-31
[ 1258 ]
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao � ZTE Q14/15, Q12/15, Q11/15 2011-01-31
[ 1246 ]
A proposal to fault scenario analysis of draft G.hao � ETRI Q11/15 2011-01-31
[ 1245 ]
A proposal to session timer for draft G.hao � ETRI Q11/15 2011-01-31
[ 1210 ]
The support of OSC transmition 1588V2 in OTN/G.798.1 � Fiberhome Technologies Group , China Academy of Telecommunication Research Q9/15, Q13/15, Q11/15 2011-01-31
[ 1184 ]
Rate Change Considerations during BWR in G.hao � PMC-Sierra Q11/15 2011-01-31
[ 1183 ]
Clarifications to G.hao � PMC-Sierra Q11/15 2011-01-31
[ 1175 ]
Considerations on 100GE PCS BIP8 Transparency � Avalon Microelectronics Q11/15 2011-01-31
Resultados :22 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25