Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2011-02-14�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2011-02-14)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2011-02-14 al 2011-02-25

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultados :67 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�AI/Cuesti�n:�2/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1518 ]
Structuring of MPLS-TP Recommendations � Telef�nica Investigaci�n y Desarrollo Q9/15, Q14/15, Q12/15, Q10/15 2011-02-11
[ 1496 ]
Multilayer SCN Issues � Ciena Corporation Q14/15, Q12/15 2011-02-02
[ 1495 ]
G.8080 - SP10 - call routing � Ciena Corporation Q14/15, Q12/15 2011-02-02
[ 1494 ]
G.8080 and multi-layer topology � Ciena Corporation Q12/15 2011-02-02
[ 1491 ]
Editing of G.8010 V2 � Ciena Corporation Q12/15 2011-02-02
[ 1468 ]
Transitional Link attributes for optical transponders and 3R regenerators in the OTN � Alcatel-Lucent Q14/15, Q12/15 2011-02-02
[ 1461 ]
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications" � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1449 ]
Further consideration of requirements for on-demand segment monitoring in MPLS-TP � NTT , Telecom Italia Q12/15, Q10/15 2011-02-02
[ 1448 ]
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP � NTT Q12/15, Q10/15 2011-02-02
[ 1445 ]
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions � ISOC Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1441 ]
Withdrawn: MPLS-TP Standards � BT Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1439 ]
Comments on differentiation of MPLS-TP environments � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1406 ]
OMCI Tip-Ring Test Result for POTS UNI � A.T. Communication Channels , Ericsson Q2/15 2011-02-01
[ 1405 ]
OMCI updates for Vendor-specific Test Parameters � A.T. Communication Channels , Ericsson Q2/15 2011-02-01
[ 1404 ]
Enabling variable message length in extended message format � A.T. Communication Channels , Alcatel-Lucent , Ericsson Q2/15 2011-02-01
[ 1396 ]
Relation between G.aon and G.872 � Deutsche Telekom Q12/15 2011-02-01
[ 1395 ]
WCh clients in draft G.aon � Deutsche Telekom Q12/15 2011-02-01
[ 1394 ]
Properties of a Wavelength Channel in draft G.aon � Deutsche Telekom Q12/15 2011-02-01
[ 1385 ]
Support for the consent of G.8110.1 and G.tpoam � Italy Q12/15, Q10/15 2011-02-01
[ 1384 ]
Structure and content of the MPLS-TP Recommendations � Telecom Italia Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1372 ]
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks � Israel Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1370 ]
Comments on working assumption at Berlin meeting and TD377 (wd31r1) � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q9/15, Q12/15, Q10/15 2011-02-01
[ 1362 ]
Support for the consent of G.8110.1 and G.tpoam � SK Telecom , ETRI Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1361 ]
Structure of the MPLS-TP Recommendations � SK Telecom , ETRI Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1346 ]
Nested Restoration Domains - Data-plane maintenance overhead signals � Tellabs Oy Q9/15, Q12/15, Q11/15 2011-02-01
[ 1324 ]
Proposal to re-define the architectures for MPLS-TP linear protection � Fujitsu Q9/15, Q12/15 2011-02-01
[ 1316 ]
Proposal for G.epon � NTT , Mitsubishi Q2/15 2011-02-01
[ 1307 ]
Associated Channel Type for G.tpoam � Portugal Telecom Q12/15 2011-02-01
[ 1306 ]
Support for the consent of G.8110.1 and G.tpoam � Portugal Telecom Q12/15, Q10/15 2011-02-01
[ 1305 ]
Procedural issues on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-02-01
[ 1303 ]
Inter SDO Cooperation on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5 2011-02-01
[ 1301 ]
Operator Requirements for MPLS-TP OAM � Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1298 ]
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution � Juniper Networks , Cisco , NSN , Verizon Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1297 ]
Considerations on G.800 style ETH transport processing functions in draft revised G.8010 � Huawei , Deutsche Telekom Q12/15 2011-02-01
[ 1296 ]
G.800 server subnetwork and ETH server subnetwork definitions � Huawei , Deutsche Telekom Q12/15 2011-02-01
[ 1295 ]
Models in G.8010 � Huawei , Deutsche Telekom Q9/15, Q14/15, Q12/15 2011-02-01
[ 1287 ]
G.987.3: Draft Text for Transparent Clock Mechanism � Adtran , Calix , PMC-Sierra Q2/15, Q13/15 2011-01-31
[ 1286 ]
G.987.1: Draft Text for IEEE 1588 Packet Timing Reference Model � Adtran , Calix , PMC-Sierra Q2/15, Q13/15 2011-01-31
[ 1285 ]
Associated Channel Type for G.tpoam � WIND Q12/15 2011-01-31
[ 1279 ]
Consideration on TS sequence in HAO � ZTE Q14/15, Q12/15, Q11/15 2011-01-31
[ 1270 ]
Proposal for OMCI in EPON � Mitsubishi , Ericsson , Hitachi , NTT Q2/15 2011-01-31
[ 1262 ]
Proposal for work on NG-PON protection � Huawei , MIIT China Q2/15 2011-01-31
[ 1258 ]
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao � ZTE Q14/15, Q12/15, Q11/15 2011-01-31
[ 1256 ]
Requirement for communication latency as a traffic engineering performance metric in ASON � ZTE Q14/15, Q12/15 2011-01-31
[ 1254 ]
(Rev.1)
Proposal of adding new attribute to PPTP POTS UNI ME � MIIT China Q2/15 2011-01-31
[ 1253 ]
Proposal of adding new MAC bridge port ICMPv6 process preassign table to G.988 � MIIT China Q2/15 2011-01-31
[ 1248 ]
PTN GACh+Y.1731 OAM interoperability test activities and result � CATR , China Mobile Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1247 ]
Support for the consent of G.8110.1 and G.tpoam � China MIIT Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1244 ]
Support for the consent of G.8110.1 � NEC , Fujitsu , Hitachi Q12/15 2011-01-31
[ 1221 ]
Comments on draft G.aon � Huawei Q12/15 2011-01-31
Resultados :67 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-26