Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2010-05-31�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� TD�(2010-05-31)�

UIT-T�SG15

Transport aspects of Access networks and home networking

Periodo de estudios 2009

Reuni�n� del 2010-05-31 al 2010-06-11

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10� 2012-05-11� 2011-12-052011-09-162011-02-142010-10-22� [ 2010-05-31 ]� 2010-01-152009-09-282009-05-152008-12-01

Documentos Temporales �(GEN) �[�AI/Cuesti�n:�Q2/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 172-GEN ]
Information from Q5/15 to Q2/15 � Rapporteur Q5/15 Q5/15, Q2/15 2010-06-03
[ 163-GEN ]
(Rev.1)
Liaison report from SC86C � Liaison Raporteur to IEC TC86 Q15/15, Q7/15, Q6/15, Q5/15, Q2/15 2010-05-27
[ 150-GEN ]
Report of the Q6/15 Rapporteur Group meeting, Beijing, 1 - 5 March 2010 � Rapporteur Q6/15 Q12/15, Q11/15, Q6/15, Q2/15 2010-05-20
[ 144-GEN ]
Proposal to study Intelligent ODN systems � Rapporteur Q2/15 Q17/15, Q2/15 2010-05-17
[ 143-GEN ]
Timing Distribution in PON systems � Rapporteur Q2/15 Q13/15, Q4/15, Q2/15 2010-05-17
Documentos presentados : 5 de un total de 12� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(PLEN) �[�AI/Cuesti�n:�Q2/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 357-PLEN ]
A.5 justification for the draft new Recommendation G.987.3 for consent � Associate Rapporteur Q2/15 Q2/15 2010-06-09
[ 340-PLEN ]
A.5 justification information for draft new G.9980 � G.9980 editors Q4/15, Q2/15, Q1/15 2010-06-09
[ 335-PLEN ]
A.5 justification of references for G.988 � Editor G.988 Q2/15 2010-06-09
[ 315-PLEN ]
WP1/15 interim activities � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2010-06-10
[ 314-PLEN ]
Liaison Statements from WP1/15 � Chairman WP 1/15 Q4/15, Q2/15, Q1/15 2010-06-10
Documentos presentados : 5 de un total de 16� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(WP1) �[�AI/Cuesti�n:�Q2/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 406-WP1 ]
Outgoing LS - OMCI option to set up TR-069 ACS connectivity � ITU-T Study Group 15 Q2/15 2010-06-10
[ 403-WP1 ]
(Rev.1)
Geneva meeting minutes Q2/15 � Rapporteur Q2/15 Q2/15 2010-06-09
[ 401-WP1 ]
Outgoing LS - Consent of G.9980 � Study Group 15 Q4/15, Q2/15, Q1/15 2010-06-09
[ 396-WP1 ]
Liaison response, and the history of OMCI for Ethernet systems � ITU-T SG 15 Q2/15 2010-06-07
[ 395-WP1 ]
LS - Smart metering deployment � ETSI ATTM Q4/15, Q2/15, Q1/15 2010-06-04
Documentos presentados : 5 de un total de 36� relacionaron a este reuni�n (vea m�s...)

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11