Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2009-09-28�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2009-09-28)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2009-09-28 al 2009-10-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-05-152008-12-01

Resultados :52 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Contribuciones �[�Origen:�Huawei�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 745 ]
Supporting a broadband backhaul application in the PTN � Huawei Technologies Q9/15 2009-09-22
[ 712 ]
G.vector: Proposed way forward on the issue of FDM pilots � Huawei Technologies , MII Q4/15 2009-09-20
[ 711 ]
G.vector: On Error Sample Quantization Format � Huawei Technologies , MII Q4/15 2009-09-20
[ 710 ]
G.vector: Line Stability after a Disorderly Leaving Event � Huawei Technologies , MII Q4/15 2009-09-20
[ 709 ]
MEs for TDM pseudowire over MPLS � Huawei technologies Q2/15 2009-09-20
[ 708 ]
A Nested PON Architecture � Huawei technologies Q2/15 2009-09-20
[ 707 ]
N:1 Protection for Long Reach GPON � Huawei technologies Q2/15 2009-09-20
[ 706 ]
Unicast Message Negotiation - Timing Diagram � Huawei Technologies Q13/15 2009-09-20
[ 705 ]
Unicast Message Negotiation - Multiple TLVs � Huawei Technologies Q13/15 2009-09-20
[ 704 ]
Discussion on clockIdentity format for ITU's IEEE1588 Telecom Profile � Huawei Technologies Q13/15 2009-09-20
[ 703 ]
G.8264.1 - Editorial comments/changes � Huawei Technologies Q13/15 2009-09-20
[ 702 ]
Description of Transparency in G.800 � Huawei Technologies Q12/15 2009-09-20
[ 701 ]
Proposal to define ATM, FR, PPP, HDLC, SDH over Ethernet mappings � Huawei Technologies Q9/15, Q10/15 2009-09-20
[ 700 ]
Proposal on Ring Protection � Huawei Technologies Q9/15 2009-09-20
[ 699 ]
Proposal on PTN Equipment Types � Huawei Technologies Q9/15 2009-09-20
[ 698 ]
Proposal on MVC and EVC in G.ptneq � Huawei Technologies Q9/15 2009-09-20
[ 697 ]
Extension of APS for Generic Dual Node Interconnection Protection � Huawei Technologies Q9/15 2009-09-20
[ 696 ]
Supervisory system for optical fibre submarine cable systems � Huawei Technologies Q8/15 2009-09-20
[ 695 ]
Introduce OTN interface into Optical Submarine Cable Systems � Huawei Technologies , China Unicom Q8/15 2009-09-20
[ 694 ]
Definition of COTDR parameters � Huawei Technologies Q8/15 2009-09-20
[ 693 ]
Proposal for 10G bitrate submarine optical signal � Huawei Technologies Q8/15 2009-09-20
[ 692 ]
Proposal for OSNR parameter values at point RS for 10G/50GHz application codes in G.698.2 � Huawei Technologies Q6/15 2009-09-20
[ 691 ]
Proposal for new sub-clauses into G.696.1 about mixed 10G/40G/100G transmission � Huawei Technologies Q6/15 2009-09-20
[ 690 ]
Proposal on the state machine and APS PDU in G.8031 � Huawei Technologies Q9/15 2009-09-20
[ 689 ]
Proposal on ACL-SNCG/I protection switching for microwave network in G.8031 � Huawei Technologies Q9/15 2009-09-20
[ 688 ]
Proposal on extending linear protection switching for variable link in G.808.1 � Huawei Technologies 9/15 2009-09-20
[ 687 ]
QL to clockClass mapping � Huawei Technologies , France Telecom Orange Q13/15 2009-09-20
[ 686 ]
Discussion of G.8264.1 Message Forwarding Behaviour � Huawei Technologies Q13/15 2009-09-20
[ 685 ]
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates � Huawei Technologies , CATR , MII Q13/15 2009-09-20
[ 684 ]
(Rev.1)
Proposal on adding bandwidth notification function in G.808.1 and G.8031 � Huawei Technologies Q9/15 2009-09-20
[ 683 ]
G.800 Transport Entities � Huawei Technologies Q12/15 2009-09-20
[ 572 ]
ODUflex hitless resizing method � Huawei Technologies , China Mobile Communications Corp Q9/15, Q11/15 2009-09-18
[ 569 ]
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4 � Huawei Technologies Q2/15 2009-09-18
[ 568 ]
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4 � Huawei Technologies Q2/15 2009-09-18
[ 533 ]
HO and LO ODUk Shared Ring Protection (SRP) � Huawei Technologies , China Academy of Telecommunication Research, MII , China Mobile Communications Corporation Q9/15 2009-09-18
[ 505 ]
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 504 ]
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 502 ]
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 501 ]
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 471 ]
CPRI over OTN requirement � China Telecom , Huawei Q11/15 2009-09-16
[ 454 ]
Proposal to study Shared Mesh Protection � Huawei Technologies , CATR , MII Q9/15 2009-09-16
[ 453 ]
Considerations on the description of the ODU layer network in G.872 and G.8080 � Huawei Technologies Q14/15, Q12/15 2009-09-16
[ 452 ]
Transfer delay for FC over OTN � Huawei Technologies Q11/15 2009-09-16
[ 445 ]
Management of high capacity connections in the OTN � Huawei Technologies Q12/15 2009-09-16
[ 443 ]
Text proposal to align clause 9/G.872 with draft revised G.709 � Huawei Technologies Q12/15 2009-09-16
[ 441 ]
GPON over OTN mapping � Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra Q2/15, Q11/15 2009-09-16
[ 440 ]
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access � Huawei Technologies Q9/15 2009-09-16
[ 439 ]
Text proposal for clause 8/G.798.1 � Huawei Technologies Q9/15 2009-09-16
[ 438 ]
Proposal to specify OCh/OTUkV_A with OTUk_CP � Huawei Technologies Q9/15, Q11/15 2009-09-16
[ 437 ]
Multi-vendor demarcation in the OTN � Huawei Technologies Q9/15, Q11/15 2009-09-16
Resultados :52 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25