Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2008-12-01�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2008-12-01)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2008-12-01 al 2008-12-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-15

Resultados :20 documentos
Contribuciones �[�Origen:�ZTE�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 314 ]
G.int: Proposal for Next-Generation LINK/PHY Interface � MII, China, Huawei, ZTE Q4/15 2008-11-25
[ 309 ]
G.int: Comments on LINK/PHY Interface � MII, China, Huawei, ZTE Q4/15 2008-11-25
[ 299 ]
Proposal on automatic discovery requirements in WDM network in G.7714.1 � ZTE Corporation Q14/15 2008-11-23
[ 298 ]
Clarifications on Key Management in GPON System � ZTE Corporation Q2/15 2008-11-23
[ 297 ]
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync � ZTE Corporation Q13/15 2008-11-23
[ 296 ]
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265 � ZTE Corporation, CATR MII Q13/15 2008-11-23
[ 295 ]
(Rev.1)
Proposal to consider node resource management in G.8080 for WSON � ZTE Corporation Q12/15 2008-11-23
[ 294 ]
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 293 ]
Flushing behaviour in interconnected ring protection (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 292 ]
FDB Flush Problem in non_revertive operation � ZTE Corporation, China Q9/15 2008-11-23
[ 291 ]
Difference between sub-ring and single ring protection (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 290 ]
Comparison between shared-link and sub-ring models (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 289 ]
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission � ZTE Corporation Q6/15 2008-11-23
[ 288 ]
Proposals on optical attenuator parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 287 ]
Proposal on PDL and PMD parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 286 ]
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713 � ZTE Corporation Q14/15 2008-11-23
[ 285 ]
Comments to G.8152 � ZTE Corporation Q14/15 2008-11-23
[ 284 ]
Comments to G.8052 � ZTE Corporation Q14/15 2008-11-23
[ 283 ]
Add "central frequency deviation" parameter for transmitter in G.698.2 � ZTE Q6/15 2008-11-23
[ 271 ]
Restoration exercise � ZTE Corporation Q14/15, Q12/15 2008-11-23
Resultados :20 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-26