Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2008-12-01�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2008-12-01)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2008-12-01 al 2008-12-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-15

Resultados :20 documentos
Contribuciones �[�AI/Cuesti�n:�Q2/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 336 ]
G.984.4 Implementer's Guide � Huawei Technologies Co.,Ltd. Q2/15 2008-11-26
[ 298 ]
Clarifications on Key Management in GPON System � ZTE Corporation Q2/15 2008-11-23
[ 254 ]
Solution of fast GPON switching in long-reach PON scenario � Huawei technologies Q2/15 2008-11-21
[ 253 ]
Proposal to support phase synchronization in GPON system � Huawei technologies Co., LTD Q2/15 2008-11-21
[ 252 ]
Proposal to support ONT survival time attribute in G.984.4 � Huawei technologies Co., LTD Q2/15 2008-11-21
[ 251 ]
Proposal on Continuous Mode of LR-PON � Huawei Technologies Co., Ltd. RAD Data communicati Q2/15 2008-11-21
[ 225 ]
Proposal of control plane protocol stack in G.984.1 � MII China Q2/15 2008-11-21
[ 173 ]
On the need to distribute accurate phase/Time-of-Day over xPON networks � RAD Data Communications, Huawei Q2/15, Q13/15 2008-11-21
[ 134 ]
Solution of fast GPON switching in long-reach PON scenario � Huawei technologies Q2/15 2008-11-20
[ 133 ]
Proposal to support phase synchronization in GPON system � Huawei technologies Co., LTD Q2/15 2008-11-20
[ 132 ]
Proposal to support ONT survival time attribute in G.984.4 � Huawei technologies Co., LTD Q2/15 2008-11-20
[ 131 ]
Proposal on Continuous Mode of LR-PON � Huawei Technologies Co., Ltd. RAD Data communication Ltd. Q2/15 2008-11-20
[ 129 ]
Proposal for PON splitter specifications in G.671 revision � NTT Q7/15, Q2/15 2008-11-20
[ 77 ]
Proposal for clarifying downstream priority queues � ADTRAN Q2/15 2008-11-19
[ 68 ]
Specifications proposal to G.gbe � NEC, Fujitsu, NTT Q2/15 2008-11-19
[ 67 ]
Liaison statement proposal on G.gbe � NEC, Fujitsu Q2/15 2008-11-19
[ 66 ]
Comments on the Software image download in G.984.4 Revised 2008-Am2 � Hitachi Q2/15 2008-11-19
[ 47 ]
PON splitter values � Corning Incorporated Q7/15, Q2/15 2008-11-18
[ 46 ]
PON splitter values - Change to wavelength range � Corning Incorporated Q7/15, Q2/15 2008-11-18
[ 19 ]
Editorial Comments for Draft 1.0 for G.gbe � Nortel Networks (Canada) Q2/15 2008-11-17
Resultados :20 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11