Contribuciones
�[�AI/Cuesti�n:�2/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 336 ]
�
� |
G.984.4 Implementer's Guide
�
� |
Huawei Technologies Co.,Ltd.
� |
Q2/15
� |
2008-11-26 |
|
[ 320 ]
�
� |
G.800 Terminology and Backward Compatibility with G.805
�
� |
Huawei Technologies Co.,Ltd.
� |
Q12/15
� |
2008-11-26 |
|
[ 319 ]
�
� |
G.800 Description of Media Networks
�
� |
Huawei Technologies Co.,Ltd.
� |
Q12/15
� |
2008-11-26 |
|
[ 318 ]
�
� |
G.800 Interconnect Entities
�
� |
Huawei Technologies Co.,Ltd.
� |
Q12/15
� |
2008-11-26 |
|
[ 298 ]
�
� |
Clarifications on Key Management in GPON System
�
� |
ZTE Corporation
� |
Q2/15
� |
2008-11-23 |
|
[ 295 ]
�
(Rev.1)� |
Proposal to consider node resource management in G.8080 for WSON
�
� |
ZTE Corporation
� |
Q12/15
� |
2008-11-23 |
|
[ 271 ]
�
� |
Restoration exercise
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2008-11-23 |
|
[ 254 ]
�
� |
Solution of fast GPON switching in long-reach PON scenario
�
� |
Huawei technologies
� |
Q2/15
� |
2008-11-21 |
|
[ 253 ]
�
� |
Proposal to support phase synchronization in GPON system
�
� |
Huawei technologies Co., LTD
� |
Q2/15
� |
2008-11-21 |
|
[ 252 ]
�
� |
Proposal to support ONT survival time attribute in G.984.4
�
� |
Huawei technologies Co., LTD
� |
Q2/15
� |
2008-11-21 |
|
[ 251 ]
�
� |
Proposal on Continuous Mode of LR-PON
�
� |
Huawei Technologies Co., Ltd. RAD Data communicati
� |
Q2/15
� |
2008-11-21 |
|
[ 238 ]
�
� |
PBBN model for G.8010
�
� |
BT plc
� |
Q12/15
� |
2008-11-21 |
|
[ 237 ]
�
� |
VLAN model in G.8010
�
� |
BT plc
� |
Q12/15
� |
2008-11-21 |
|
[ 236 ]
�
� |
Modelling the Dynamic Behaviour of the Transport Network
�
� |
BT plc
� |
Q12/15
� |
2008-11-21 |
|
[ 235 ]
�
� |
Use of Configuration and the Concept of a 'Virtual Function' as the Foundation of the Dynamic Aspects of the Unified Model
�
� |
BT plc
� |
Q12/15
� |
2008-11-21 |
|
[ 227 ]
�
� |
Some Considerations and Proposals about T-MPLS and MPLS-TP Standardization
�
� |
CATR, MII China, CMCC
� |
Q12/15
� |
2008-11-21 |
|
[ 225 ]
�
� |
Proposal of control plane protocol stack in G.984.1
�
� |
MII China
� |
Q2/15
� |
2008-11-21 |
|
[ 173 ]
�
� |
On the need to distribute accurate phase/Time-of-Day over xPON networks
�
� |
RAD Data Communications, Huawei
� |
Q2/15, Q13/15
� |
2008-11-21 |
|
[ 159 ]
�
� |
Proposal of modification of Network Call Controller (NCC) in G.8080
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q12/15
� |
2008-11-21 |
|
[ 158 ]
�
� |
Proposal of modification of interlayer relationships for VCAT and control-plane protection in G.8080 and 2
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q12/15
� |
2008-11-21 |
|
[ 155 ]
�
� |
Examples of surfaces
�
� |
BT plc
� |
Q12/15
� |
2008-11-21 |
|
[ 151 ]
�
� |
Generic Associated Channel (G-ACH) as New MCC/SCC for T-MPLS in G.7712
�
� |
Alcatel-Lucent
� |
Q14/15, Q12/15
� |
2008-11-21 |
|
[ 134 ]
�
� |
Solution of fast GPON switching in long-reach PON scenario
�
� |
Huawei technologies
� |
Q2/15
� |
2008-11-20 |
|
[ 133 ]
�
� |
Proposal to support phase synchronization in GPON system
�
� |
Huawei technologies Co., LTD
� |
Q2/15
� |
2008-11-20 |
|
[ 132 ]
�
� |
Proposal to support ONT survival time attribute in G.984.4
�
� |
Huawei technologies Co., LTD
� |
Q2/15
� |
2008-11-20 |
|
[ 131 ]
�
� |
Proposal on Continuous Mode of LR-PON
�
� |
Huawei Technologies Co., Ltd. RAD Data communication Ltd.
� |
Q2/15
� |
2008-11-20 |
|
[ 129 ]
�
� |
Proposal for PON splitter specifications in G.671 revision
�
� |
NTT
� |
Q7/15, Q2/15
� |
2008-11-20 |
|
[ 127 ]
�
� |
Ethernet Ring Topology Proposal
�
� |
ADTRAN
� |
Q9/15, Q14/15, Q12/15
� |
2008-11-20 |
|
[ 77 ]
�
� |
Proposal for clarifying downstream priority queues
�
� |
ADTRAN
� |
Q2/15
� |
2008-11-19 |
|
[ 76 ]
�
� |
Introducing the MAC layer
�
� |
Huawei Technologies Co., Ltd.
� |
Q12/15
� |
2008-11-19 |
|
[ 70 ]
�
� |
Atomic and compound information entities
�
� |
Huawei Technologies Co., Ltd.
� |
Q12/15
� |
2008-11-19 |
|
[ 68 ]
�
� |
Specifications proposal to G.gbe
�
� |
NEC, Fujitsu, NTT
� |
Q2/15
� |
2008-11-19 |
|
[ 67 ]
�
� |
Liaison statement proposal on G.gbe
�
� |
NEC, Fujitsu
� |
Q2/15
� |
2008-11-19 |
|
[ 66 ]
�
� |
Comments on the Software image download in G.984.4 Revised 2008-Am2
�
� |
Hitachi
� |
Q2/15
� |
2008-11-19 |
|
[ 47 ]
�
� |
PON splitter values
�
� |
Corning Incorporated
� |
Q7/15, Q2/15
� |
2008-11-18 |
|
[ 46 ]
�
� |
PON splitter values - Change to wavelength range
�
� |
Corning Incorporated
� |
Q7/15, Q2/15
� |
2008-11-18 |
|
[ 41 ]
�
� |
G.8080 - SP10 - call routing
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2008-11-18 |
|
[ 40 ]
�
� |
Proposed inclusion of a PBB model in G.8021
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q12/15
� |
2008-11-18 |
|
[ 38 ]
�
� |
Considerations of an OTN hierarchy based on LO/HO principles of Rec. G.872
�
� |
Ciena Corporation
� |
Q12/15, Q11/15
� |
2008-11-18 |
|
[ 37 ]
�
� |
Summary of WSON work
�
� |
Ciena Corporation
� |
Q9/15, Q14/15, Q12/15
� |
2008-11-18 |
|
[ 19 ]
�
� |
Editorial Comments for Draft 1.0 for G.gbe
�
� |
Nortel Networks (Canada)
� |
Q2/15
� |
2008-11-17 |
|
[ 16 ]
�
� |
Simplification of the OTN hierarchy
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q14/15, Q13/15, Q12/15, Q11/15
� |
2008-11-17 |
|
[ 14 ]
�
� |
10GE LAN interface for OTN
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q13/15, Q12/15, Q11/15
� |
2008-11-17 |
|
[ 13 ]
�
� |
Impact of adding ODU2e and ODU3y to the OTN hierarchy
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q12/15, Q11/15
� |
2008-11-17 |
|
[ 12 ]
�
� |
Evolution of the OTN
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q14/15, Q13/15, Q12/15, Q11/15
� |
2008-11-17 |
Resultados :45 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):