Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 338 ]
�
� |
G.8032 SF and FS
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-28 |
|
[ 337 ]
�
� |
G.lt: Update to SELT-PMD draft text
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2008-11-28 |
|
[ 336 ]
�
� |
G.984.4 Implementer's Guide
�
� |
Huawei Technologies Co.,Ltd.
� |
Q2/15
� |
2008-11-26 |
|
[ 335 ]
�
� |
Signal Degrade (SD) triggered protection switching
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 334 ]
�
� |
Proposal on the link recovery in case of multiple failures in G.8032
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 333 ]
�
� |
Proposal on the ring node initialization in G.8032
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 332 ]
�
� |
Proposal on flush optimization support in G.8032
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 331 ]
�
� |
Proposal on non-revertive mode in G.80323
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 330 ]
�
� |
Parameters in G.lcasub
�
� |
Huawei Technologies Co., Ltd.
� |
Q8/15
� |
2008-11-26 |
|
[ 329 ]
�
� |
Supplement on repeaterless optical fibre submarine cable system (G.973)
�
� |
Huawei Technologies Co., Ltd
� |
Q8/15
� |
2008-11-26 |
|
[ 328 ]
�
� |
The influence of COTDR to optical signals
�
� |
Huawei Technologies Co., Ltd
� |
Q8/15
� |
2008-11-26 |
|
[ 327 ]
�
� |
Comments on P-DPSK according to the test data
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2008-11-26 |
|
[ 326 ]
�
� |
Proposal for Optical Interface Diagnostic Monitoring for Optical Transmission System
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2008-11-26 |
|
[ 325 ]
�
� |
Optically identified wavelength in performance monitoring
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2008-11-26 |
|
[ 324 ]
�
� |
About P-DPSK receiver performance dependence on optical filter characteristics
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2008-11-26 |
|
[ 323 ]
�
� |
DCC and GCC usage for DCN
�
� |
Huawei Technologies Co., Ltd.
� |
Q14/15
� |
2008-11-26 |
|
[ 322 ]
�
� |
DCC and GCC usage for DCN (different version)
�
� |
Huawei Technologies Co., Ltd.
� |
Q14/15
� |
2008-11-26 |
|
[ 321 ]
�
� |
Additional Call attributes for VCAT/LCAS
�
� |
Huawei Technologies Co., Ltd., China
� |
Q14/15
� |
2008-11-26 |
|
[ 320 ]
�
� |
G.800 Terminology and Backward Compatibility with G.805
�
� |
Huawei Technologies Co.,Ltd.
� |
Q12/15
� |
2008-11-26 |
|
[ 319 ]
�
� |
G.800 Description of Media Networks
�
� |
Huawei Technologies Co.,Ltd.
� |
Q12/15
� |
2008-11-26 |
|
[ 318 ]
�
� |
G.800 Interconnect Entities
�
� |
Huawei Technologies Co.,Ltd.
� |
Q12/15
� |
2008-11-26 |
|
[ 317 ]
�
� |
Proposal to extend G.8012
�
� |
Huawei Technologies Co., Ltd.
� |
Q11/15
� |
2008-11-26 |
|
[ 316 ]
�
� |
G.inp: Updated Working Text for Physical-Layer Retransmission
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 315 ]
�
� |
G.inp: Simulation Results for Evaluation of Retransmission Methods
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 314 ]
�
� |
G.int: Proposal for Next-Generation LINK/PHY Interface
�
� |
MII, China, Huawei, ZTE
� |
Q4/15
� |
2008-11-25 |
|
[ 313 ]
�
� |
G.vector: Preventing Disruption of Existing Lines During Joining
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 312 ]
�
� |
G.inp: More Simulation Results for Evaluation of Retransmission Methods
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 311 ]
�
� |
G.vdsl: Improving the Performance of Upstream Power Back-off
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 310 ]
�
� |
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 309 ]
�
� |
G.int: Comments on LINK/PHY Interface
�
� |
MII, China, Huawei, ZTE
� |
Q4/15
� |
2008-11-25 |
|
[ 308 ]
�
� |
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers
�
� |
MII, China, Huawei
� |
Q4/15
� |
2008-11-25 |
|
[ 307 ]
�
� |
G.8032 Flushing
�
� |
Alcatel-Lucent
� |
Q9/15
� |
2008-11-25 |
|
[ 306 ]
�
� |
G.8032 WTR and WTB comments
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 305 ]
�
� |
G.8032 Statemachine
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 304 ]
�
� |
G.8032 Priority Logic and Statemachine
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 303 ]
�
� |
G.8032 Hidden Transitions
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 302 ]
�
� |
Comparison between synchronization metrics
�
� |
Nokia Siemens Networks
� |
Q13/15
� |
2008-11-25 |
|
[ 301 ]
�
� |
VDSL: Noise testing with fluctuating crosstalk
�
� |
BT plc
� |
Q4/15
� |
2008-11-25 |
|
[ 300 ]
�
� |
Retransmission management in the TPS-TC layer
�
� |
Infineon Technologies AG
� |
Q4/15
� |
2008-11-23 |
|
[ 299 ]
�
� |
Proposal on automatic discovery requirements in WDM network in G.7714.1
�
� |
ZTE Corporation
� |
Q14/15
� |
2008-11-23 |
|
[ 298 ]
�
� |
Clarifications on Key Management in GPON System
�
� |
ZTE Corporation
� |
Q2/15
� |
2008-11-23 |
|
[ 297 ]
�
� |
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync
�
� |
ZTE Corporation
� |
Q13/15
� |
2008-11-23 |
|
[ 296 ]
�
� |
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265
�
� |
ZTE Corporation, CATR MII
� |
Q13/15
� |
2008-11-23 |
|
[ 295 ]
�
(Rev.1)� |
Proposal to consider node resource management in G.8080 for WSON
�
� |
ZTE Corporation
� |
Q12/15
� |
2008-11-23 |
|
[ 294 ]
�
� |
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 293 ]
�
� |
Flushing behaviour in interconnected ring protection (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 292 ]
�
� |
FDB Flush Problem in non_revertive operation
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 291 ]
�
� |
Difference between sub-ring and single ring protection (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 290 ]
�
� |
Comparison between shared-link and sub-ring models (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 289 ]
�
� |
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission
�
� |
ZTE Corporation
� |
Q6/15
� |
2008-11-23 |
Resultados :338 documentos Resultados :�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):