Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 181 ]
�
� |
Proposed new draft recommendation on Signalling requirements and protocol profiles of touch-screen phone based IVVR services in NGN
�
� |
KT
� |
Q3/11, Q2/11
� |
2010-04-16 |
|
[ 180 ]
�
� |
Introduction to touch-screen phone based IVVR communication services
�
� |
KT
� |
Q3/11, Q2/11
� |
2010-04-16 |
|
[ 179 ]
�
� |
Draft recommendation Q.3220 (formerly Q.nacp.0)
�
� |
ETRI
� |
Q7/11
� |
2010-04-16 |
|
[ 178 ]
�
� |
General numbering guideline of Q.7/11 for the drafting of recommendations
�
� |
ETRI
� |
Q7/11
� |
2010-04-16 |
|
[ 177 ]
�
� |
Propose to add content into the clause 6.3.5 in Q.3911
�
� |
China Telecom
� |
Q9/11
� |
2010-04-15 |
|
[ 176 ]
�
� |
Propose a revision of the draft Recommendation Q.3911
�
� |
China Telecom
� |
Q9/11
� |
2010-04-15 |
|
[ 175 ]
�
� |
Proposed editorial modifications to the draft Recommendation Q.3910
�
� |
China Telecom
� |
Q9/11
� |
2010-04-15 |
|
[ 174 ]
�
� |
Proposal on protocol profiles for Q.centrexSig
�
� |
China Telecom
� |
Q3/11, Q2/11
� |
2010-04-15 |
|
[ 173 ]
�
� |
Proposed signalling flow for Outgoing Communication service feature in Q.centrexSig
�
� |
China Telecom
� |
Q3/11, Q2/11
� |
2010-04-15 |
|
[ 172 ]
�
� |
Proposed signalling flow for Incoming Communication service feature in Q.centrexSig
�
� |
China Telecom
� |
Q3/11, Q2/11
� |
2010-04-15 |
|
[ 171 ]
�
� |
Propose to consent Draft Recommendation Q.IPTVSA at April 2010 SG 11 Meeting
�
� |
China Telecom
� |
Q1/11
� |
2010-04-15 |
|
[ 170 ]
�
� |
Proposed Modification of Appendices of X.rmcp-3 (X.603-2)
�
� |
ETRI
� |
Q15/11
� |
2010-04-15 |
|
[ 169 ]
�
� |
Proposal for update of Clause 2, 3, 4, 7 and 8 of Q.nid-test-arch
�
� |
ETRI
� |
Q12/11
� |
2010-04-14 |
|
[ 168 ]
�
� |
Proposal for the new recommendation of signaling requirements and protocol at the M13 interface
�
� |
ETRI
� |
Q7/11
� |
2010-04-14 |
|
[ 167 ]
�
� |
Proposed Modification of X.rmcp-3 (X.603-2) for April 2010 meeting
�
� |
Korea (Rep. of)
� |
Q15/11
� |
2010-04-14 |
|
[ 166 ]
�
� |
Proposal for the new recommendation of signalling requirements and protocol at the M9 interface between MLM-PE(P) and MLM-PE(C)
�
� |
Korea (Rep. of)
� |
Q7/11, Q5/11
� |
2010-04-14 |
|
[ 165 ]
�
� |
Proposed Modification of X.mmc-3 (X.604-2) for April 2010 meeting
�
� |
Korea (Rep. of)
� |
Q15/11
� |
2010-04-14 |
|
[ 164 ]
�
� |
Proposed use cases to Q.ANCP
�
� |
Huawei, CATR
� |
Q5/11
� |
2010-04-14 |
|
[ 163 ]
�
� |
Proposed modifications to procedures of Q.3323.2 (Rw H.248)
�
� |
Huawei, CATR
� |
Q5/11
� |
2010-04-14 |
|
[ 162 ]
�
� |
Proposed admission control in Q.PCNApp
�
� |
Huawei, CATR
� |
Q5/11
� |
2010-04-14 |
|
[ 161 ]
�
� |
Editorial changes to Q.3321.1
�
� |
Huawei, CATR
� |
Q5/11
� |
2010-04-14 |
|
[ 160 ]
�
� |
Q.Flowstatesig Changes to accommodate January issues
�
� |
Anagran Inc.
� |
Q5/11
� |
2010-04-14 |
|
[ 159 ]
�
� |
Q.Flowstatesig draft - definition of transfer capabilities and QoS parameters for proposed FSA transport services
�
� |
Juniper, Verizon, AT&T, Cisco, Telefon-LM Ericsson
,
Nokia siemens Networks GMBH&Co. KG
� |
Q5/11
� |
2010-04-14 |
|
[ 158 ]
�
� |
Q.Flowstatesig draft - Scope and Architecture issues
�
� |
Juniper, Verizon, AT&T, Cisco, Telefon-LM Ericsson
,
Nokia Siemens Networks GMBH&Co. KG
� |
Q5/11
� |
2010-04-14 |
|
[ 157 ]
�
� |
An existing IETF protocol solution for Q.Flowstatesig
�
� |
Juniper, Verzon, AT&T, Cisco, Telefon-LM Ericsson,
,
Nokia Siemens Networks GMBH&Co. KG
� |
Q5/11
� |
2010-04-14 |
|
[ 156 ]
�
� |
Proposed text to the draft Recommendation "Q.Test suites for VoIP conformance testing"
�
� |
NEC Corp., OKI Electric Ind.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 155 ]
�
� |
Proposed annex to the draft Recommendation Q.Test suites for VoIP conformance testing
�
� |
NEC Corp.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 154 ]
�
� |
Proposed text to clause 6.3 of the draft Recommendation Q.NGN interoperability
�
� |
NEC Corp.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 153 ]
�
� |
Proposed text to clause 6.2 of the draft Recommendation Q.NGN interoperability
�
� |
NEC Corp.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 152 ]
�
� |
Proposed text to clause 5.3 of the draft Recommendation Q.NGN interoperability
�
� |
NEC Corp.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 151 ]
�
� |
Proposed text to clause 5.2 of the draft Recommendation Q.NGN interoperability
�
� |
NEC Corp.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 150 ]
�
� |
Proposed modifications to clause 5.1 and 6.1 of the draft Recommendation Q.NGN interoperability
�
� |
NEC Corp.
� |
Q9/11, Q8/11, Q12/11, Q10/11
� |
2010-04-14 |
|
[ 149 ]
�
� |
Proposed modifications to Clause 6.16.1 in Q.3323.2 (Rw H.248 version 2)
�
� |
CATR, Huawei
� |
Q5/11
� |
2010-04-14 |
|
[ 148 ]
�
� |
Proposed definition and service description in Q.centrexSig
�
� |
CATR
� |
Q3/11
� |
2010-04-14 |
|
[ 147 ]
�
� |
Proposed call flow for Communication Pickup in Q.centrexSig
�
� |
CATR
� |
Q3/11
� |
2010-04-14 |
|
[ 146 ]
�
� |
Proposed new parameters added into chapter 11 of the draft Recommendation Q.3910.
�
� |
CATR
� |
Q9/11
� |
2010-04-14 |
|
[ 145 ]
�
� |
Q.Flowstatesig State Diagrams
�
� |
Anagran Inc.
� |
Q5/11
� |
2010-04-14 |
|
[ 144 ]
�
� |
Q.Flowstatesig Response to Open Items
�
� |
Anagran Inc.
� |
Q5/11
� |
2010-04-14 |
|
[ 143 ]
�
� |
Important Benefits of Q.Flowstatesig
�
� |
Anagran Inc.
� |
Q5/11
� |
2010-04-14 |
|
[ 142 ]
�
� |
Q.Flowstatesig Proposed Changes
�
� |
Anagran Inc.
� |
Q5/11
� |
2010-04-14 |
|
[ 141 ]
�
� |
Clarification to Aggregate resource profile over Q.3302.1-RCIP
�
� |
ZTE Corp.
� |
Q5/11
� |
2010-04-14 |
|
[ 140 ]
�
� |
Draft Recommendation ITU-T Q.3906 "The scenarios, list and types of tests for fixed Broadband NUT testing on the Model networks. Part I."
�
� |
Russian Federation
� |
Q8/11
� |
2010-04-07 |
|
[ 139 ]
�
� |
Draft Recommendation ITU-T Q.3904 " The scenarios, list and types of tests for TM local and NUT testing for IMS on the Model networks "
�
� |
Russian Federation
� |
Q8/11
� |
2010-04-07 |
|
[ 138 ]
�
� |
Proposal for authorization free indication over Rs
�
� |
Russian Federation
� |
Q5/11
� |
2010-04-07 |
|
[ 137 ]
�
� |
Proposed update for Q.3324.2
�
� |
NTT Corp.
� |
Q5/11
� |
2010-04-07 |
|
[ 136 ]
�
� |
Q.1912.5F Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP);Part 5: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) for Profile C
�
� |
Telekom Austria
� |
Q8/11
� |
2010-04-07 |
|
[ 135 ]
�
� |
Invitation to Approve TRQ.ETS Overview out of the April 2010 Meeting
�
� |
Industry Canada
� |
Q13/11
� |
2010-03-31 |
|
[ 134 ]
�
� |
Proposed Summary Clause for Draft Supplement TRQ.priority
�
� |
AT&T & Telcordia
� |
Q13/11
� |
2010-03-30 |
|
[ 133 ]
�
� |
Proposed Edits for Draft Supplement TRQ.priority
�
� |
AT&T & Telcordia
� |
Q13/11
� |
2010-03-30 |
|
[ 132 ]
�
� |
Proposed Modifications to Clause 6.3 on Diameter Protocol in Draft TRQ.priority
�
� |
Telcordia Technologies
� |
Q13/11
� |
2010-03-30 |
Resultados :50 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):