Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG02 : Reuni�n�2010-11-09�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG02� TD�(2010-11-09)�

UIT-T�SG02

Telecommunication management and network and service operations

Periodo de estudios 2009

Reuni�n� del 2010-11-09 al 2010-11-18

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-03-212011-06-01� [ 2010-11-09 ]� 2010-05-172009-11-162009-03-24

Documentos Temporales �(GEN) �[�AI/Cuesti�n:�Q1/2�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 234-GEN ]
iLS - IdM terms and definitions � ITU-T SG17 (Geneva, 7-16 April 2010) Q6/2, Q3/2, Q1/2 2010-04-23

Documentos Temporales �(PLEN) �[�AI/Cuesti�n:�Q1/2�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 203-PLEN ]
Editorial modifications to Recommendation E.101 � Editor Q1/2 2010-11-16
[ 198-PLEN ]
(Rev.1)
oLS - Liaison to ITU IPv6Working Group on Resolution 64 � Convenors, SG2 IPv6 mailing list Q1/2 2010-11-16
[ 197-PLEN ]
(Rev.1-3)
oLS - Numbering misuse and fraud incidences � Associate Rapporteur, Q.1/2 Q1/2 2010-11-16
[ 196-PLEN ]
+Add.1
Output of Ad-hoc proposing changes to Annex F to Recommendation ITU-T E.212 �
Addendum 1 contains changes to the French version
Chairman, Ad hoc group on E.212 Annex F Q1/2 2010-11-16
[ 195-PLEN ]
Output of Ad-hoc proposing changes to Annex E to Recommendation ITU-T E.212 � Chairman, Ad hoc group on E.212 Annex E Q1/2 2010-11-16
Documentos presentados : 5 de un total de 14� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(WP1) �[�AI/Cuesti�n:�Q1/2�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 104-WP1 ]
Draft summary of provisioning ITU-T SG2 workshop on the Future of Numbering � Chairman, Steering Committee of FON Workshop Q1/2 2010-11-17
[ 103-WP1 ]
ITU Collection of Number Portability Information � Editor, E.164 Supplement 2: Number Portability Q1/2 2010-11-17
[ 102-WP1 ]
(Rev.1-2)
Progress report for Question 1/2 � Associate Rapporteur, Q.1/2 Q1/2 2010-11-17
[ 99-WP1 ]
(Rev.1)
Q.1/2 work programme � Associate Rapporteur, Q.1/2 Q1/2 2010-11-16
[ 96-WP1 ]
Report of the Ad-Hoc meeting on SPN � Convener Q1/2 2010-11-16
Documentos presentados : 5 de un total de 46� relacionaron a este reuni�n (vea m�s...)

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-11