Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�

UIT-T�SG15

Infraestructuras de las redes �pticas y de otras redes de transporte

Periodo de estudios 2005

Resultados :23 documentos
Contribuciones �[�AI/Cuesti�n:�Q5/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 862 ]
Proposal of a new SOP Scrambling Analysis (SSA) PMD test method for future revision of Rec. G.650.2 � Canada Q5/15 2008-02-01
[ 852 ]
Classification of PMD test methods for future revision of Rec. G.650.2 � Canada Q5/15 2008-02-01
[ 778 ]
Proposal regarding Q5/15 study items for the 2009-2012 study period � NTT Q5/15 2008-01-31
[ 777 ]
Proposal of a draft for a new supplement regarding the general characteristics of optical fibre under actual use conditions � NTT Q5/15 2008-01-31
[ 776 ]
Summary of correspondence activity on a new supplement regarding the general characteristics of an optical fibre under actual use conditions � NTT Q5/15 2008-01-31
[ 671 ]
Proposal to withdraw Rec. G.651 � Draka Comteq Q10/15, Q5/15 2008-01-29
[ 628 ]
G.650.3 Revision Proposal - Abstract � UK Q5/15 2008-01-21
[ 627 ]
Revision of G.650.3 - Proposed new text � UK Q5/15 2008-01-21
[ 510 ]
Correspondence activity on the alignment of nomenclature in G.666 and G.650.2 � Deutsche Telekom Q5/15, Q7/15 2007-05-25
[ 378 ]
Proposal on a new Supplement regarding with the general characteristics of an optical fibre under actual use conditions � NTT Q5/15 2007-05-23
[ 258 ]
Discussion on macrobending loss specification for G.mmx � Draka Comteq Q5/15, Q10/15 2006-10-20
[ 230 ]
Comments on and proposals for G.650.2 � Deutsche Telekom Q5/15 2006-10-20
[ 222 ]
SBS measurement: Proposal for text in G.650.2, Appendix II.5 � Corning Incorporated Q5/15 2006-10-20
[ 184 ]
Proposal concerning response time necessary for adaptive PMD compensation based on polarization fluctuation speed � NTT Q7/15, Q5/15, Q6/15 2006-10-19
[ 156 ]
Comments on Draft Rec. G.650.3 � NTT Q5/15 2006-10-19
[ 155 ]
Proposal on definition of SBS threshold � NTT , CLPAJ Q5/15 2006-10-19
[ 131 ]
Data on the macrobending loss ratio at 1550 nm vs 1625 nm of G.smx class A single mode fibres at 15 mm radius � Draka Comteq Q5/15, Q10/5 2006-10-19
[ 130 ]
Proposal on new document regarding the general characteristics of an optical fibre operation � NTT Q5/15 2006-10-19
[ 124 ]
Comments on draft G.smx � NTT , CLPAJ Q5/15, Q10/15 2006-10-19
[ 121 ]
Way forward to improve the SBS measurement guidance given by G.650.2 � OFS-Fitel Q5/15 2006-10-19
[ 29 ]
Small bending radius optimized G.652 compatible single mode fibres � Draka Comteq Q5/15, Q10/15 2005-12-09
[ 28 ]
Use of Rec. G.652 SMF outside its specification � Draka Comteq Q7/15, Q5/15 2005-12-09
[ 18 ]
Proposed Modification to Recommendation G.650.2 Appendix II.5: Further refinement of the SBS Critical Power based on Rayleigh Backscattering Level � OFS Q5/15 2005-03-15
Resultados :23 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-10