Contribuciones
�[�AI/Cuesti�n:�Q2/15�]��� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 876 ]
�
� |
Enhancement of the 802.1p mapper profile, Extended VLAN ME, and introduction of new OMCI ME for MAC/IP filtering
�
� |
Alcatel-Lucent
� |
Q2/15
� |
2008-02-01 |
|
[ 851 ]
�
� |
Proposal for G.984.4 modelling of ONT grooming capability
�
� |
Ministry of Information Industry of PR of China
� |
Q2/15
� |
2008-02-01 |
|
[ 803 ]
�
� |
Proposal for VLAN Tagging Filter Data ME in G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 801 ]
�
� |
Proposal for MAC Priority Queue ME in G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 800 ]
�
� |
Proposal for Extended VLAN Tagging Operation Configuration Data ME in G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 799 ]
�
� |
Proposal for treatment of Priority of the Extended VLAN tagging operation configuration data managed entity for G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 798 ]
�
� |
Proposal for IP precedence capability on the 802.1p mapper service profile managed entity for G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 772 ]
�
� |
Proposal for Study of Multi-protocol over GEM
�
� |
ZTE
� |
Q2/15
� |
2008-01-31 |
|
[ 771 ]
�
� |
Proposal for Security Aspect of PLOAM messaging in GPON System
�
� |
ZTE
,
China Netcom
� |
Q2/15
� |
2008-01-31 |
|
[ 769 ]
�
� |
G.984.4: Management Entity of xDSL OLR function
�
� |
ZTE
� |
Q2/15
� |
2008-01-31 |
|
[ 768 ]
�
� |
Further Proposal for Key Consistency in GPON System
�
� |
ZTE
,
China Netcom
� |
Q2/15
� |
2008-01-31 |
|
[ 723 ]
�
� |
Protection amendments for G.984.1
�
� |
BT
� |
Q2/15
� |
2008-01-30 |
|
[ 722 ]
�
� |
Circuit emulation contribution for G.984.1
�
� |
BT
� |
Q2/15
� |
2008-01-30 |
|
[ 721 ]
�
� |
G.984.1: Extra examples of SNI
�
� |
BT
� |
Q2/15
� |
2008-01-30 |
|
[ 720 ]
�
� |
Synchronisation improvements for G.984.1
�
� |
BT
� |
Q2/15
� |
2008-01-30 |
|
[ 708 ]
�
� |
The scope of G.hnta and G.hn
�
� |
NTT, Mitsubishi
� |
Q4/15, Q2/15, Q1/15
� |
2008-01-30 |
|
[ 707 ]
�
� |
Proposal of discussion on G.hntreq for technical requirements
�
� |
Mitsubishi, NTT
� |
Q4/15, Q2/15, Q1/15
� |
2008-01-30 |
|
[ 706 ]
�
� |
Proposal of distribution of information for home network QoS and applications
�
� |
Mitsubishi, NTT
� |
Q4/15, Q2/15, Q1/15
� |
2008-01-30 |
|
[ 705 ]
�
� |
Proposed update of Clause 8 "High level requirements" of G.hnta
�
� |
NTT, Mitsubishi.
� |
Q4/15, Q2/15, Q1/15
� |
2008-01-30 |
|
[ 704 ]
�
� |
Proposed update of Clauses 1, 6 and 7 of G.hnta
�
� |
NTT, Mitsubishi
� |
Q4/15, Q2/15, Q1/15
� |
2008-01-30 |
|
[ 701 ]
�
� |
Traffic Management for G-PON
�
� |
Adtran
� |
Q2/15
� |
2008-01-30 |
|
[ 683 ]
�
� |
Proposal to start studying requirements for 1-Gbit/s point-to-point Ethernet-based optical access system with a proposed liaison statement to IEEE
�
� |
Japan
� |
Q2/15
� |
2008-01-30 |
|
[ 682 ]
�
� |
Proposal for a silent start mode for ONUs
�
� |
NTT & France Telecom
� |
Q2/15
� |
2008-01-30 |
|
[ 451 ]
�
� |
OMCI for 802.1ad QoS support
�
� |
Huawei Technologies (Ltd), China
� |
Q2/15
� |
2007-05-24 |
|
[ 433 ]
�
� |
Proposal on how external protection could be met via G-PON
�
� |
China Mobile Communication Corp. (CMCC)
,
China Unicom Corporation
,
China Netcom Corporation
,
China Telecom Corporation
,
China Ministry of Information Industry (MII)
� |
Q2/15
� |
2007-05-24 |
|
[ 430 ]
�
� |
Proposal for Key Management in GPON System
�
� |
ZTE Corporation, China Netcom
� |
Q2/15
� |
2007-05-24 |
|
[ 412 ]
�
� |
Support of manageable multicast in G.984.4
�
� |
Ministry of Information Industry of P.R. China
� |
Q2/15
� |
2007-05-24 |
|
[ 361 ]
�
� |
Proposal for a new Recommendation on requirements for extender box for G-PON
�
� |
BT
� |
Q2/15
� |
2007-05-22 |
|
[ 197 ]
�
� |
Proposal for the study of Ethernet OAM ME in G.984.4
�
� |
ZTE Corporation
� |
Q2/15
� |
2006-10-20 |
|
[ 171 ]
�
� |
Wireless protection in PON
�
� |
CMCC
,
MII China
� |
Q2/15
� |
2006-10-19 |
|
[ 169 ]
�
� |
Proposal of adding a new protection type in G.984.1
�
� |
CMCC
,
MII China
� |
Q2/15
� |
2006-10-19 |
|
[ 152 ]
�
� |
Power Load Management M.E.
�
� |
Huawei Technologies
� |
Q2/15
� |
2006-10-19 |
|
[ 150 ]
�
� |
Proposal for G.984.4 modelling of SDH over GEM
�
� |
Huawei Technologies
� |
Q2/15
� |
2006-10-19 |
|
[ 102 ]
�
� |
Proposal for the collaboration activities to study GPON and next generation PON management
�
� |
NTT
� |
Q2/15
� |
2006-10-18 |
|
[ 101 ]
�
� |
Proposal of new draft Recommendation of wavelength allocation for PON
�
� |
NTT
� |
Q2/15
� |
2006-10-18 |
|
[ 73 ]
�
� |
Protocol specific rate limiting
�
� |
PMC Sierra
� |
Q2/15
� |
2006-10-18 |
|
[ 26 ]
�
� |
Amendment to Recommendation G.983.1: PICS (Protocol Implementation Conformance Statement) for ONU in G.983.1 (for agreement)
�
� |
Editor Rec. G.983.1
� |
Q2/15
� |
2005-03-23 |
|
[ 25 ]
�
� |
Amendment to Recommendation G.983.1: PICS (Protocol Implementation Conformance Statement) for OLT in G.983.1 (for agreement)
�
� |
Editor Rec. G.983.1
� |
Q2/15
� |
2005-03-23 |
|
[ 24 ]
�
� |
Draft ITU-T Recommendation G.984.4 Amendment 1 (Rev. 0.0) (for consent)
�
� |
Rapporteur Question 2/15
� |
Q2/15
� |
2005-03-23 |
|
[ 23 ]
�
� |
Amendment 1 to Recommendation G.984.3, Gigabit-capable Passive Optical Networks (G-PON): Transmission Convergence Layer Specification (for consent)
�
� |
Editor Rec. G.984.3
� |
Q2/15
� |
2005-03-23 |
|
[ 22 ]
�
� |
Amendment 2 to Recommendation G.983.3, A broadband optical access system with increased service capability by wavelength allocation (for consent)
�
� |
Editor Rec. G.983.3
� |
Q2/15
� |
2005-03-23 |
|
[ 21 ]
�
� |
to be provided
�
� |
Editors Rec. G.983.2
� |
Q2/15
� |
2005-03-23 |
|
[ 13 ]
�
� |
G.983.VideoReturnPath
�
� |
Quantum Bridge Communications
� |
Q2/15
� |
2004-10-08 |
Resultados :43 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):