Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2008-02-11�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2008-02-11)�

UIT-T�SG15

Infraestructuras de las redes �pticas y de otras redes de transporte

Periodo de estudios 2005

Reuni�n� del 2008-02-11 al 2008-02-22

Lugar : Suiza [Ginebra]

Otras reuniones : 2008-12-012007-06-042006-10-302006-02-062005-05-162004-11-29

Resultados :24 documentos
Contribuciones �[�AI/Cuesti�n:�Q12/15�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 913 ]
Some concerns about and proposals for the future direction of ASON � NTT Q14/15, Q12/15 2008-02-06
[ 908 ]
Layer model of Ethernet � Deutsche Telekom Q12/15 2008-02-03
[ 856 ]
Change Proposal for G.7712 re the T-MPLS Management Communication Channel � Alcatel-Lucent Q12/15, Q14/15 2008-02-01
[ 843 ]
Requirement of MS-PW over T-MPLS � CMCC , Alcatel Shangai Bell , CU , CATR MII China Q12/15, Q11/15, Q9/15 2008-02-01
[ 830 ]
G.pacmod-bis: Test results of the new timing distribution mechanism � Huawei Q14/15, Q13/15, Q12/15 2008-02-01
[ 828 ]
Requirements for Network Automatic Configuration � Huawei Q14/15, Q12/15 2008-01-31
[ 826 ]
Corrections to FD/FDFr Usage in G.8010 � Huawei Q12/15 2008-01-31
[ 823 ]
PBB Model for G.8010 � Huawei Q12/15 2008-01-31
[ 822 ]
G.800 Term for Interconnect Transport Entities � Huawei Q12/15 2008-01-31
[ 821 ]
G.800 description modification � Huawei Q12/15 2008-01-31
[ 815 ]
Annex of G.8010v2 to describe the PVT network application � Huawei , Nokia Siemens Networks Q12/15 2008-01-31
[ 797 ]
Consideration on IP/MPLS and T-MPLS interworking � Fujitsu Q12/15 2008-01-31
[ 788 ]
Complexity, Scalability, Independency, and Transparency � BT Q12/15 2008-01-31
[ 782 ]
Proposed study items for packet based transport technologies for the next study period (2009-2012) � NTT QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15 2008-01-31
[ 738 ]
Combination of protection and restoration in G.8080 � ZTE Q12/15 2008-01-30
[ 734 ]
Clarification for FP partitioning in G.8010 � ZTE Q12/15 2008-01-30
[ 730 ]
Proposal for adding definition of control component topology in ASON � ZTE Q12/15 2008-01-30
[ 713 ]
VLAN model in G.8010 � BT, Nortel Networks (Europe) Q12/15 2008-01-30
[ 712 ]
PBB model for G.8010 � BT, Nortel Networks (Europe) Q12/15 2008-01-30
[ 711 ]
Approach to modelling in G.pbb-te � BT, Nortel Networks (Europe) Q12/15 2008-01-30
[ 677 ]
Proposed liaison response for PCE � Nortel Networks (Canada) Q14/15, Q12/15 2008-01-29
[ 654 ]
DCN Architecture and Gateways � Ciena Corp Q14/15, Q12/15 2008-01-29
[ 653 ]
Problems with G.8010 � Ciena Corp Q14/15, Q12/15, Q9/15 2008-01-29
[ 651 ]
The future of G.7716 � Ciena Corp, Nortel Networks (USA) Q12/15 2008-01-29
Resultados :24 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25